Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 LAccepted-AOC | ₹9.1 L | L1 | Accepted-AOC Being a 1st lowest |
| 2 | L2₹11.5 L+₹2.4 L (26.0%)Rejected-AOC | ₹11.5 L+₹2.4 L (26.0%) | L2 | Rejected-AOC Being a 2nd lowest |
| 3 | Rejected-Technical | - | - | Rejected-Technical The bidder is Technically non Responsive as per recommendation of bid evaluation committee |
Tender Value
₹9.4 L
EMD Value
₹18,822
Closing Date
18 May 2026, 3:00 pmClosed
Executive Engineer
O/o the Executive Engineer DWS Division Udaipur
FDR/Mtc WSS (RWS/UWS)/SH-Re-Dvlpmnt 4 nos Old Srvicable DTWs wth Cntractrs Own Nrml Power Air Cmprssr, 3 nos Old Srvicable DTWs wth Cntractrs Own High Power Air Cmprssr in/c Lwrng, Lftng PM assmbly undr EE DWS Divn, UDP, Gomati Tripura durng 2026-27.
2026_CEDWS_72735_1
06/EE/DWS/DIVN/UDP/2026-27
Open Tender
Civil Works - Water Works
Percentage
210 days
Udaipur
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
₹18,822
28 Jul 2026
11 May 2026
18 May 2026
12 May 2026
18 May 2026
12 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for lifting of different capacity of single phase and 3-phase submersible pump motor sets with column assembly & all accessories from the existing DTW scheme and carrying the same from DTW scheme to the workshop in around of Udaipur etc. complete as per direction of the Engineer-in-charge. | 7 | Nos | 1,639.1 | ₹11,473.7 |
| 2Washing and re-development of Old serviceable Deep Tube Well by using Air Compressor and testing of the well as per specification (IS: 11189) and direction of the Engg-in-Charge. | |||||
| 2.01 | I. Upto 200 mtr. Pipe assembly A. With Contractor’s air Compressor. I) Using air compressor of 300-450 CFM output for DTW. | 4 | Nos | 66,282.6 | ₹2,65,130.4 |
| 2.02 | II. Beyond 200 mtr. Pipe assembly A. With Contractor’s air Compressor. I) Using air compressor of 1100 CFM output for DTW. | 3 | Nos | 2,18,072.4 | ₹6,54,217.2 |
| 3 | Charges for lowering of different capacity submersible pump motor sets with column assembly & all accessories required and carrying from the workshop in around to the DTW scheme etc. complete as per direction of the Engineer-in-charge. | 7 | Nos | 1,466 | ₹10,262 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_74021.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.70 MB
BOQ_74021.xls
BOQ • 0.33 MB
DNIeT_06_Compressor_SD_Rig.pdf
Tender Documents • 2.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .