Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 CrAccepted-AOC | ₹3.3 Cr | L1 | Accepted-AOC BEING L1 |
| 2 | L2₹5.0 Cr+₹1.7 Cr (51.3%)Rejected-AOC | ₹5.0 Cr+₹1.7 Cr (51.3%) | L2 | Rejected-AOC BEING L2 |
| 3 | L3₹7.7 Cr+₹4.4 Cr (131.9%)Rejected-AOC | ₹7.7 Cr+₹4.4 Cr (131.9%) | L3 | Rejected-AOC BEING L3 |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
5 Oct 2020, 5:00 pmClosed
HOD MS
HOD MS MS UNIT KMML CHAVARA
OPERATION AND MAINTENANCE OF THE PRE CONCENTRATION PLANT II AT ANCHUMANACKAL. BY PROVIDING SUFFICIENT FEL/ EQUIPMENTS, ENGAGING 12 WORKMEN PER DAY, CARRYING OUT DAY TO DAY MAINTENTANANCE, GENERATION AND TRANSPORT OF CONCENTRATE TO MS UNIT
2020_KMML_383894_1
KMML/MS/PCP II/2020 DTD 11.09.2020
Open Tender
Miscellaneous Works
Item Rate
365 days
KMML, MS UNIT, KOVILTHOTTAM
AS PER TENDER
3 documents required · 3 mandatory
₹29,500
onlineKMML,CHVARA
₹2 L
10 Feb 2021
11 Sept 2020
7 Oct 2020
11 Sept 2020
5 Oct 2020
11 Sept 2020
11 Sept 2020 - 5 Oct 2020
OPERATION AND MAINTENANCE OF PCP II
Operation of PCP II for 3 shifts (24 Hrs) by providing necessary Front End Loaders/ Equipments/ skilled manpower for plant operation / maintenace and 4 workmen / shift from Ponmana site I evictee's list as operational assistance for 3 shifts and Loading and transportation of concentrate having Heavy Minerals content not less than 35%, from PCP II to MS unit after duly weighed, estimated quantity 50000 MT
MURALI ENTERPRISES
TVK CONSTRUCTIONS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .