| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹36.2 L+₹3.9 L (12.0%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹36.7 L+₹4.4 L (13.6%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
28 Dec 2020, 3:30 pmClosed
Executive Engineer
O/O the executive Engineer Irrigation Divisio Tvpm Public office building compound Palayam
SDRf works
2020_Irrig_397124_2
33/EE/2020-21
Open Tender
Civil Works - Others
Item Rate
120 days
Neyyar dam
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,760
Yes
₹50,000
Yes
10 Feb 2021
7 Dec 2020
31 Dec 2020
7 Dec 2020
28 Dec 2020
8 Dec 2020
8 Dec 2020 - 16 Dec 2020
Amount
Scheme - 1, Ch: 8100 m to 8430 m.
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od32168/2020_2021/IA : Earth work in surface excavation not exceeded 30 cm in depth but exceeding 1.5 m width as well as 10 sqm on plan by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site. for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme - 2, Ch: 8430 m to 8680 m.
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od32179/2020_2021/IA : Earth work in surface excavation not exceeded 30 cm in depth but exceeding 1.5 m width as well as 10 sqm on plan by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site. for desilting the canal over areas including carrying and conveying the excavated material from the source to the vehicle/access point (No of leads=5). If the soil is good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme -3, Ch: 8680 m to 9010 m.
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od32168/2020_2021/IA : Earth work in surface excavation not exceeded 30 cm in depth but exceeding 1.5 m width as well as 10 sqm on plan by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site. for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme - 4, Ch: 9010 m to 9340 m.
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od32185/2020_2021/IA : Earth work in surface excavation not exceeded 30 cm in depth but exceeding 1.5 m width as well as 10 sqm on plan by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site. for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme -5, Ch: 9340 m to 9670 m .
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od32185/2020_2021/IA : Earth work in surface excavation not exceeded 30 cm in depth but exceeding 1.5 m width as well as 10 sqm on plan by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site. for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme - 6, Ch: 9670 m to 10000 m.
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od32185/2020_2021/IA : Earth work in surface excavation not exceeded 30 cm in depth but exceeding 1.5 m width as well as 10 sqm on plan by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site. for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme -7, Ch: 10000 m to 10330 m.
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od32185/2020_2021/IA : Earth work in surface excavation not exceeded 30 cm in depth but exceeding 1.5 m width as well as 10 sqm on plan by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site. for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme - 8, Ch: 10330 m to 10580 m.
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od32179/2020_2021/IA : Earth work in surface excavation not exceeded 30 cm in depth but exceeding 1.5 m width as well as 10 sqm on plan by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site. for desilting the canal over areas including carrying and conveying the excavated material from the source to the vehicle/access point (No of leads=5). If the soil is good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme - 9, 10580 m to 10730 m (Ch: 10730 m to 10805 m is already work done (75 m) m. and deduction for Ch: 10805 m to 11155 m is cut and cover (350 m) and Ch: 11155 m to 11255 m.
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od32179/2020_2021/IA : Earth work in surface excavation not exceeded 30 cm in depth but exceeding 1.5 m width as well as 10 sqm on plan by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site. for desilting the canal over areas including carrying and conveying the excavated material from the source to the vehicle/access point (No of leads=5). If the soil is good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme - 10, Ch: 11255 m to 11505 m.
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od32179/2020_2021/IA : Earth work in surface excavation not exceeded 30 cm in depth but exceeding 1.5 m width as well as 10 sqm on plan by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site. for desilting the canal over areas including carrying and conveying the excavated material from the source to the vehicle/access point (No of leads=5). If the soil is good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme - 11, Ch: 11505 m to 11515 m. ( Ch:11515 m to 11605 m (90 m )cut and cover) and Ch:11605 to 11845 m.
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od32256/2020_2021/IA : Earth work in surface excavation not exceeded 30 cm in depth but exceeding 1.5 m width as well as 10 sqm on plan by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site. for desilting the canal over areas including carrying and conveying the excavated material from the source to the vehicle/access point (No of leads=5). If the soil is good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme -12, Ch: 11845 m to 12095 m .
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od32256/2020_2021/IA : Earth work in surface excavation not exceeded 30 cm in depth but exceeding 1.5 m width as well as 10 sqm on plan by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site. for desilting the canal over areas including carrying and conveying the excavated material from the source to the vehicle/access point (No of leads=5). If the soil is good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme - 13, Ch: 12095 m to 12345 m.
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od32256/2020_2021/IA : Earth work in surface excavation not exceeded 30 cm in depth but exceeding 1.5 m width as well as 10 sqm on plan by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site. for desilting the canal over areas including carrying and conveying the excavated material from the source to the vehicle/access point (No of leads=5). If the soil is good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme - 14, Ch: 12345 m to 12595 m.
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od32256/2020_2021/IA : Earth work in surface excavation not exceeded 30 cm in depth but exceeding 1.5 m width as well as 10 sqm on plan by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site. for desilting the canal over areas including carrying and conveying the excavated material from the source to the vehicle/access point (No of leads=5). If the soil is good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme - 15, Ch: 12595 m to 12845 m.
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od32256/2020_2021/IA : Earth work in surface excavation not exceeded 30 cm in depth but exceeding 1.5 m width as well as 10 sqm on plan by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site. for desilting the canal over areas including carrying and conveying the excavated material from the source to the vehicle/access point (No of leads=5). If the soil is good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme - 16, Ch: 12845 m to 13095 m.
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od32256/2020_2021/IA : Earth work in surface excavation not exceeded 30 cm in depth but exceeding 1.5 m width as well as 10 sqm on plan by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site. for desilting the canal over areas including carrying and conveying the excavated material from the source to the vehicle/access point (No of leads=5). If the soil is good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme - 17, Ch: 13095 m to 13345 m.
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od32256/2020_2021/IA : Earth work in surface excavation not exceeded 30 cm in depth but exceeding 1.5 m width as well as 10 sqm on plan by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site. for desilting the canal over areas including carrying and conveying the excavated material from the source to the vehicle/access point (No of leads=5). If the soil is good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme - 18, Ch: 13345m to 13595 m.
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od32256/2020_2021/IA : Earth work in surface excavation not exceeded 30 cm in depth but exceeding 1.5 m width as well as 10 sqm on plan by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site. for desilting the canal over areas including carrying and conveying the excavated material from the source to the vehicle/access point (No of leads=5). If the soil is good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme -19, Ch: 13595 m to 13845 m.
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od32256/2020_2021/IA : Earth work in surface excavation not exceeded 30 cm in depth but exceeding 1.5 m width as well as 10 sqm on plan by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site. for desilting the canal over areas including carrying and conveying the excavated material from the source to the vehicle/access point (No of leads=5). If the soil is good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme - 20, Ch:13845 m to 14095 m.
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od32256/2020_2021/IA : Earth work in surface excavation not exceeded 30 cm in depth but exceeding 1.5 m width as well as 10 sqm on plan by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site. for desilting the canal over areas including carrying and conveying the excavated material from the source to the vehicle/access point (No of leads=5). If the soil is good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme -21, 14095 m to 14150 m (14150 m to 14200 m (50 m) cut and cover) and Ch: 14200 m to 14395 m.
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od32256/2020_2021/IA : Earth work in surface excavation not exceeded 30 cm in depth but exceeding 1.5 m width as well as 10 sqm on plan by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site. for desilting the canal over areas including carrying and conveying the excavated material from the source to the vehicle/access point (No of leads=5). If the soil is good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme - 22, Ch: 14395 m to 14725 m.
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od32354/2020_2021/IA : Earth work in surface excavation not exceeded 30 cm in depth but exceeding 1.5 m width as well as 10 sqm on plan by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site. for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme - 23, Ch: 14725 m to 15055 m.
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od32185/2020_2021/IA : Earth work in surface excavation not exceeded 30 cm in depth but exceeding 1.5 m width as well as 10 sqm on plan by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site. for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme -24, Ch: 15055 m to 15385 m.
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od32185/2020_2021/IA : Earth work in surface excavation not exceeded 30 cm in depth but exceeding 1.5 m width as well as 10 sqm on plan by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site. for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme -25. Ch: 15385 m to 15635 m .
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od32380/2020_2021/IA : Earth work in surface excavation not exceeded 30 cm in depth but exceeding 1.5 m width as well as 10 sqm on plan by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site. for desilting the canal over areas including carrying and conveying the excavated material from the source to the vehicle/access point (No of leads=5). If the soil is good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme - Ch: 15635 m to 115965 m.
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od32185/2020_2021/IA : Earth work in surface excavation not exceeded 30 cm in depth but exceeding 1.5 m width as well as 10 sqm on plan by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site. for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme -27, Ch: 15965 m to 16295 m.
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od32354/2020_2021/IA : Earth work in surface excavation not exceeded 30 cm in depth but exceeding 1.5 m width as well as 10 sqm on plan by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site. for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Scheme-28, 16295 m to 16470 m
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od33299/2020_2021/IA : Earth work in surface excavation not exceeded 30 cm in depth but exceeding 1.5 m width as well as 10 sqm on plan by mechanical (Hydraulic excavator)/ manual means for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site. for desilting the canal areas including carrying and conveying the excavated material from the source to the vehicle/ access point. if the soil is in good condition the cost of the same shall be recovered from the contractor as per the direction of departmental officers at site.
Akhil A
RAJAMONY T
Bidder Name
RAJAMONY T
Akhil A
SANYO XAVIER
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_569682.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .