Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹56.8 LAccepted-AOC | ₹56.8 L | L1 | Accepted-AOC successful bidder |
| 2 | Rejected-Technical SANTIPUR MECHEDA | MECHEDA | PURBA MEDINIPUR | WEST BENGAL | 721137 | - | - | Rejected-Technical Both technical and PO value are not matching with criteria. |
| Sl No | Description | Qty | Unit | GUCHHAIT ENGINEERING L1 |
|---|---|---|---|---|
| 1.00PART A | ||||
| 1.01 | Maximum possible expenditure value in two years and is inclusive of labour charge (i.e. category/no-category workers) as calculated on the basis of wage (Basic + DA) as on 01.07.2025 and all applicable benefits & allowances as per MOS dtd. 16.09.2025 for 6 nos. workers and including O.T charge (maximum 15 hrs/head/month) but excluding profit and overhead | 24 | Months | 1,77,426 ₹42,58,224 Lowest |
| 2.00PART B | ||||
| 2.01 | Maximum possible expenditure for two years for the charges of One (01) no. Supervisor under company’s own payroll excluding profit | 24 | Months | 25,000 ₹6,00,000 Lowest |
| 2.02 | Maximum possible expenditure for the Charges of all types of consumables, tools & tackles and safety PPEs etc as per scope of work for two years excluding profit | 24 | Months | 23,800 ₹5,71,200 Lowest |
| 3.00PART C | ||||
| 3.01 | Profit on PART A only in two years | 24 | Months | 10,466 ₹2,51,184 Lowest |
Tender Value
₹59.8 L
EMD Value
₹1.2 L
Closing Date
13 Feb 2026, 4:00 pmClosed
General Manager (KTPS)
GM (Admin) building, KTPS, Mecheda, Purba Medinipur, 721137
Biennial Maintenance Contract for Tit- bit maintenance job at CHP under CHP-MM, KTPS.
2026_WBPDC_992912_1
GM(K)/CC/ CHP-MM/ 3237 (Vol.4)/E3740/25-26
Open Tender
Support/Maintenance Service
Item Rate
730 days
KTPS, Mecheda, Purba Medinipur, 721137
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.2 L
Yes
16 Jul 2026
27 Jan 2026
17 Feb 2026
27 Jan 2026
13 Feb 2026
28 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PART A | |||||
| 1.01 | Maximum possible expenditure value in two years and is inclusive of labour charge (i.e. category/no-category workers) as calculated on the basis of wage (Basic + DA) as on 01.07.2025 and all applicable benefits & allowances as per MOS dtd. 16.09.2025 for 6 nos. workers and including O.T charge (maximum 15 hrs/head/month) but excluding profit and overhead | 24 | Months | - | - |
| 2PART B | |||||
| 2.01 | Maximum possible expenditure for two years for the charges of One (01) no. Supervisor under company’s own payroll excluding profit | 24 | Months | - | - |
| 2.02 | Maximum possible expenditure for the Charges of all types of consumables, tools & tackles and safety PPEs etc as per scope of work for two years excluding profit | 24 | Months | - | - |
| 3PART C | |||||
| 3.01 | Profit on PART A only in two years | 24 | Months | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.94 MB
BOQ_2428143.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .