Tender Value
₹43.7 L
EMD Value
₹44,000
Closing Date
21 Oct 2026, 6:00 pm
Executive Engineer, Surendranagar Irrigation Division, Surendranagar
Fifth Attempt) Repairing/Restoring and strengthening of Downstream face of wasteweir, Both side Abutment & wing wall and Additional apron including bar wall at wadhwan Bhogavo-2 (Dholidhaja) water resource scheme for the year 2025-26
352998
09 of 2026-27
Open
Civil Works - Others
Lump-sum
Surendranagar
9 documents required · 8 mandatory · 1 optional
₹1,500
Executive Engineer Surendranagar Irrigation Division Surendranagar
₹44,000
7 Oct 2026
7 Oct 2026
7 Oct 2026
21 Oct 2026
7 Oct 2026
BILL OF QUANTITIES
SURENDRANAGAR IRRIGATION DIVISION - SURENDRANAGAR
WADHWAN BHOGAVO-2 (DHOLIDHAJA) SCHEME
Name of Work : Repairing/Restoring and strengthening of Downstream face of wasteweir, Both side Abutment & wingwall and Additional apron
including bar wall at wadhwan Bhogavo-2 (Dholidhaja) water resource scheme for the year 2025-26
Memorandum showing Items of Woks to be carried out
ESTIMATED RATES
Quantities Total amount
Quantities Total amount
Item estimated according to
Item of work Unit
No but may be In Figures In words estimated
more or less quantities
1 Dismantling C.C. foundation or flooring sorting & stacking useful and unuseful Rupees Eight Hundred
128.52 828.00 TwentyEight Only Cum.
material in lead upto 200mt as directed etc. complete.
2 Cleaning the bed of Spillway foundation prior to mapping, with air and water jet Rupees Eight Paise Ninety
556.10 incl. repmoval of all materials/debris etc complete. 8.90 Only sqmt
3 Drilling for 35 mm or specified diameter Holes by mechanical rotary (diamond Rupees Eight Hundred
bits) drilling tools for consolidation & curtain grouting in earthen dam C.O.T. in Twelve Paise FourtySix
308.00 812.46 Only Rmt
all sorts of rock formation and for fixing anchor bars of specified diameter with
epoxy grout complete.(excluding cost of bars)
4 Providing,cutting,bending,binding and fixing in position as per drawing.TMT Rupees SeventySix
BAR, reinforcement for R.C.C. works and anchor bars incl cost of black annealed Thousand Five Hundred
1.682 76574.00 SeventyFour Only TMT
16 to 18 BWG M.S.. Wire etc.complete with all lead and lift. (b) Fe-500
5 Providing & Laying in position controlled cement concrete using cement , sand Rupees Three Thousand
and crushed metal aggregate by machine mix including necessary formworks, Two Hundred FiftyTwo
compaction by mechanical vibrator,curing as directed with all lead & lift etc Only
complete. (Excluding cost of steel )
Training Wall, Side Wall And General Pupose
B) Concrete grade M-15 and MSA- 80mm "
6 Prov. And laying in position controlled cement concrete using cement,sand and Rupees Four Thousand
crushed aggregate by mass and machine mix for R.C.C/C.C work including Seven Hundred Sixty Only
necessary formworks centering scaffolding compaction by mechanical
vibrator,curing as directed with all lead & lift etc complete Excluding the cost of
reinforcement FOR SKIN CONC, FRICTION BLOCKS,ST.BASIN (B) Concrete grade
M-20 and MSA- 40mm
7 Removing cement pointing including racking out joints 20 mm deep etc Rupees FourtySeven Only
8 Cement pointing in C.M.1:2 to stone masonry after racking out joints 20mm Rupees One Hundred
1780.00 deep inc scaffolding watering and curing etc complete. 140.00 Fourty Only sqmt
(a) UPTO 6.0 Mt HEIGHT
In Words Rs. Rupees FourtyThree Lakh SeventyOne Thousand Three Hundred SeventyOne Only
I/We am/are willing to carry out the work at % above/ below present (should be written in figures and words)
of the estimated rates mentioned above. An amount of my/our tender works out as under:
* Estimated Amount * Estimated Amount
Put to tender Rs_____________________________ Put to tender Rs_________________
In Words (Rs. ) In Words Rs.( )
(Pease strike out whichever is not applicable)
Note-1: The Contractor shall exhibit a board with brief details of work as directed by the Engineer-In-Charge for which no extra payment shall bemade.
Note-2: Thel abour cess will be deducted as per prevailing rules i.e. 1% of the work done.
Note-3: GST and Incometax TDS will be deducted at a source while making payments of bills
Note-4: In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R. NO.: MIS102010/17/K1 Dated:30/07/2018 as stated in S.O.R. therefore in R.C.C. items where
there is a change as per actual mix design the cost of difference of cement consumption have been deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Executive Engineer
Signature of Contractor. Surendranagar Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01 TITLE PAGE.pdf
02- E Tender Notice.pdf
03- Invitation For Bid P 1 to 6.pdf
04 SECTION-1 Instruction to Bidders P 7 to 27.pdf
05 SECTION-2 Qualification Information P 28 to 34.pdf
06 SECTION-3 Conditions of Contract P 35 to 64.pdf
07 SECTION-4 Contract Data P 65 to 74.pdf
08 SECTION-5 Tech. Specification P 75 to 144.pdf
09 SECTION-6 Form of Bids P 145 to 147.pdf
10 SECTION-7 Bill of Quantities P 148 to 150.pdf
11 BOQ P 151 TO P 152.pdf
12 SECTION-8 TO 10 FORMS DRAWING DOCUMENTS P 153 TO 167.pdf
13 ANNEXURE-A P 168.pdf
14 ANNEXURE-B P 169.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .