Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAdmitted-Finance NEAR RELIANCE PETROL PUMP RAMGARH CANTT 829122 DIST RAMGARH JHARKHAND | RAMGARH CANTT | RAMGARH | JHARKHAND | 829122 | ₹5.3 L | L1 | Admitted-Finance |
| 2 | L2₹6.9 L+₹1.6 L (29.7%)Admitted-Finance CENTRAL COALFIELDS LIMITED OFFICE OF THE PROJECT OFFICER E M DEPARTMENT SAUNDA D BARKA SAYAL AREA | BOKARO | JHARKHAND | 825102 | ₹6.9 L+₹1.6 L (29.7%) | L2 | Admitted-Finance |
| 3 | L3₹7.3 L+₹2.0 L (36.8%)Admitted-Finance MAIN ROAD KUJJU RAMGARH JHARKHAND 825316 | KUJJU | RAMGARH | JHARKHAND | 825316 | ₹7.3 L+₹2.0 L (36.8%) | L3 | Admitted-Finance |
| 4 | L4₹7.9 L+₹2.6 L (48.7%)Admitted-Finance 00 MUKUNDPUR PAHO DOMANPUR MUKUNDPUR PAHO MIRZAPUR UTTAR PRADESH 231306 | MIRZAPUR | UTTAR PRADESH | 231306 | ₹7.9 L+₹2.6 L (48.7%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | CENTRAL ENGINEERS L2 | Rajneesh Electricals L1 | M/S ADITYA ENTERPRISES L4 | NEW NATIONAL ELECTRICAL WORKS L3 |
|---|---|---|---|---|---|---|---|
| 2.00A. Rewinding and Repairing of 225KW, 3.3KV, 1470 RPM HT Induction motor make-siemens, Sl. No. 614 installed at Topa Project under Kuju Area. | |||||||
| 3.00 | Cost DGC Copper Strip | 180 | Kg | 2,500 ₹4,50,000 | 950 ₹1,71,000 Lowest | 1,550 ₹2,79,000 | 1,441 ₹2,59,380 |
| 4.00 | Insulating materials 15% of cost of copper | 1 | L/S | 67,500 ₹67,500 | 25,650 ₹25,650 Lowest | 41,850 ₹41,850 | 38,907 ₹38,907 |
| 5.00 | Labour Cost 15% of cost of copper | 1 | L/S | 67,500 ₹67,500 | 25,650 ₹25,650 Lowest | 41,850 ₹41,850 | 38,907 ₹38,907 |
| 6.00 | Less Scrap Value @ 60% of cost of copper | 1 | L/S | 2,70,000 ₹-2,70,000 | 1,02,600 ₹-1,02,600 Lowest | 1,67,400 ₹-1,67,400 | 1,55,628 ₹-1,55,628 |
| 7.00 | Cost of Moulding of coil H class insulation DGC | 60 | coil | 700 ₹42,000 Lowest | 1,650 ₹99,000 | 2,200 ₹1,32,000 | 2,000 ₹1,20,000 |
| 8.00 | Profit @ 10% | 1 | L/S | 6,750 ₹6,750 Lowest | 21,870 ₹21,870 | 34,500 ₹34,500 | 30,156.6 ₹30,156.6 |
| 9.00 | Cover housing work with men power and materials for welding and turning to bearing size with CI rod | 2 | nos | 8,000 ₹16,000 Lowest | 15,000 ₹30,000 | 22,000 ₹44,000 | 20,000 ₹40,000 |
| 10.00 | Supply & fixing of NU322 bearing | 1 | nos | 10,000 ₹10,000 Lowest | 18,000 ₹18,000 | 28,000 ₹28,000 | 26,250 ₹26,250 |
| 11.00 | Supply & fixing of 6322 bearing | 1 | nos | 6,000 ₹6,000 Lowest | 18,500 ₹18,500 | 25,000 ₹25,000 | 24,500 ₹24,500 |
Tender Value
Refer Docs
EMD Value
₹10,300
Closing Date
7 Jul 2026, 6:55 pmClosed
SO(ENM)
SO(ENM)
Rewinding and repairing of 02 nos. HT motor installed at Topa Project under Kuju Area.
2026_CCL_361488_1
GM (K)/EnM/eTender/26-27/48
Open Tender
Electrical and Maintenance Works
Item Rate
25 days
GM UNIT KUJU
2 documents required · 2 mandatory
₹10,300
1 Sept 2026
27 Jun 2026
8 Jul 2026
27 Jun 2026
7 Jul 2026
27 Jun 2026
27 Jun 2026 - 4 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | A. Rewinding and Repairing of 225KW, 3.3KV, 1470 RPM HT Induction motor make-siemens, Sl. No. 614 installed at Topa Project under Kuju Area. | - | - | - | - |
| 3 | Cost DGC Copper Strip | 180 | Kg | - | - |
| 4 | Insulating materials 15% of cost of copper | 1 | L/S | - | - |
| 5 | Labour Cost 15% of cost of copper | 1 | L/S | - | - |
| 6 | Less Scrap Value @ 60% of cost of copper | 1 | L/S | - | - |
| 7 | Cost of Moulding of coil H class insulation DGC | 60 | coil | - | - |
| 8 | Profit @ 10% | 1 | L/S | - | - |
| 9 | Cover housing work with men power and materials for welding and turning to bearing size with CI rod | 2 | nos | - | - |
| 10 | Supply & fixing of NU322 bearing | 1 | nos | - | - |
| 11 | Supply & fixing of 6322 bearing | 1 | nos | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.92 MB
BOQ_374373.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .