Tender Value
₹5.4 L
EMD Value
₹6,000
Closing Date
20 May 2026, 5:00 pmClosed
Deputy Executive Engineer, Irrigation Sub Division, Veraval
Dismentalling and Re-Construction of C.D Work at Ch. 2262 Mtr of L.B.M.C. Main canal of Hiran-2 Irrigation Scheme. (Second Attempt)
304793
Tender Notice No-1 2026-27
Open
Civil - All
Gir Somnath
6 documents required · 6 mandatory
₹900
Executive Engineer, Gir Somnath Irrigation Division, Veraval
₹6,000
13 May 2026
13 May 2026
13 May 2026
20 May 2026
13 May 2026
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr. )
Item Description of Item (with brief Quantity Unit Rate In Amount
No specification and reference to book figures
of specifications)
1 Excavation in all sort of strata and 6.10 Cum. 180.00
formations incl. depositing the
unuseful excavated stuff as and where
directed incl sorting and stacking
useful materials as directed upto
mt lead etc. complete incl. dewatering.
( Depth 0 TO 3.0 mt )(For all type canal
& foundation trenches of C.D. works )
(b) IN SOFT ROCK.
2 Dismentalling stone/brick masonry & 28.200 Cum. 616.00
stacking of useful and unuseful
material from the dismentalled
materials as directed etc complete.(a)
In cement mortar
3 Dismentalling of RCC work viz. slab, 12.400 Cum. 1362.00
beam, lintel, barrel, stairecase, etc.
including removing the steel from the
dismentlled portion without damage
to reinforcement sorting and stacking
of useful and unuseful material from
the dismentalled material as directed
4 Dismentalling C.C. foundation or 2.600 Cum. 828.00
flooring sorting & stacking useful and
unuseful material in lead upto 200mt
as directed etc. complete.
5 Prov. and Laying in position controlled 7.800 Cum. 4303.00
cement concrete using cement, sand
and crushed aggregate by mass and
machine mix for R.C.C/CC work
including necessary formworks
centering scaffolding compaction by
vibrator, curing as directed with all
lead & lift etc complete Excluding the
cost of reinforcement FOR PLINTH
COURSE & COPING (a) Concrete grade
M-15 and MSA-20mm
6-A Prov. and Laying in position controlled 15.100 Cum. 5125.00
cement concrete using cement, sand
and crushed aggregate by mass and
machine mix for R.C.C/CC work
including necessary formworks
centering scaffolding compaction by
vibrator, curing as directed with all
lead & lift etc complete Excluding the
cost of reinforcement FOR COLUMN
AND BEAMS (c ) Concrete grade M-20
6-B Prov. and Laying in position controlled 23.200 Cum. 5157.00
cement concrete using cement, sand
and crushed aggregate by mass and
machine mix for R.C.C/CC work
including necessary formworks
centering scaffolding compaction by
vibrator, curing as directed with all
lead & lift etc complete Excluding the
cost of reinforcement
FOR PIER AND ABT. (b) Concrete
grade M-20 and MSA- 40mm
6-C Prov. and Laying in position controlled 2.300 Cum. 4912.00
cement concrete using cement, sand
and crushed aggregate by mass and
machine mix for R.C.C/CC work
including necessary formworks
centering scaffolding compaction by
vibrator, curing as directed with all
lead & lift etc complete Excluding the
cost of reinforcement
FOR PIER AND ABT. CAP (a) Concrete
grade M-20 and MSA- 20mm
6-D Prov. and Laying in position controlled 19.800 Cum. 5448.00
cement concrete using cement, sand
and crushed aggregate by mass and
machine mix for R.C.C/CC work
including necessary formworks
centering scaffolding compaction by
vibrator, curing as directed with all
lead & lift etc complete Excluding the
cost of reinforcement
FOR SOLID SLAB OF ROAD BRIDGE (a)
Concrete grade M-20 and MSA-20mm
6-E Prov. and Laying in position controlled 2.800 Cum. 4540.00
cement concrete using cement, sand
and crushed aggregate by mass and
machine mix for R.C.C/CC work
including necessary formworks
centering scaffolding compaction by
vibrator, curing as directed with all
lead & lift etc complete Excluding the
cost of reinforcementFOR WEARING
COATS Concrete grade M-20 and MSA-
7 Providing, cutting, bending, binding 2.100 M.T. 66268.00
and fixing in position as per drawing
H.Y.S.D.TMT BAR reinforcement for
R.C.C. works and anchor bars incl cost
of black annealed 16 to 18 BWG M.S..
Wire etc. complete with all lead and
I/We am/are willing to carry out the work at… % above/below percent (Should be written
in figures and words) of the estimated rate mentioned above. Amount of my /our tender works out
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
(B) For Item Rate Tender (For above INR 10 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book of In In
specifications) figures Words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ……………………………… (in
(C)Net Tendered Amount (A-B) (in figure) ………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as directed
by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.:
No. MIS 102010/17/K1, dtd. 30/07/2018 as stated in S.O.R. therefore in R.C.C. items where there
is a change as per actual mix design the cost of difference of cement consumption have been
deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Signature of Contractor Deputy Executive Engineer,
Irrigation Sub Division,
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Ch.2262-Slab-CT xing-24-25.pdf
BOQ.pdf
Tender Notice No 1 of 2026-27.pdf
Download all tender documents and submit your bid