Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹5.8 L+₹8,754 (1.54%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹5.9 L+₹23,564 (4.16%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹6.7 L+₹1.0 L (17.8%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹6.9 L+₹1.3 L (22.3%)Rejected-AOC | L5 | Rejected-AOC L5 |
Tender Value
₹7.8 L
EMD Value
₹7,810
Closing Date
15 Nov 2023, 4:00 pmClosed
Er. SANJAY KUMAR KAUSHIK, Sr. Xen
Senior Executive Engineer, OandM Divn., BBMB, Dhulkote, Ambala, Haryana
Work of water proofing treatment to stop water leakage on the roof of admn block building situated at SLDC Complex, BBMB, Chandigarh and on the roof of office of OandM Division and officers rest house situated at 220KV Substation, BBMB, Dhulkote.
2023_BBMB_173050_1
E-NIT-06/2023-24 dated 03.11.2023
Open Tender
Civil Works
Item Rate
90 days
Ambala and Chandigarh
Please refer tender documents
2 documents required · 2 mandatory
₹1,180
Yes
DD in favour of Account Officer,BBMB,Dhulkote
₹7,810
Yes
9 Jan 2024
3 Nov 2023
16 Nov 2023
3 Nov 2023
15 Nov 2023
3 Nov 2023
Amount
Work of water proofing treatment to stop water leakage on the roof of admn. block building situated at SLDC Complex, BBMB, Chandigarh and on the roof of office of O&M Division & officers rest house situated at 220KV S/S, BBMB, Dhulkote.
Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cementcompound consisting of applying: (NS Item) (g) After surface preparation , first layer of slurry of cement @ 0.488 Kg/sqm mixed water proofing cement compound @ 0.253 kg/sqm. (h) Laying second layer of fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10cm. (i) Third layer of 1.5mm thickness consisting of slurry of cement @1.289 kg/sqm mixed with water proofing cement compound @0.670 kg/sqm and coarse sand @1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing 48 hours. The entire treatmenbt will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. (NS Item). Note:- Water Leakage Test The water leakage test by retaining minimum 50mm thick layer of water on the surface of roof for 48 hours shall be conducted at site. if any leakage/ dampness is observed during the test, water leakage test shall be repeated after the necessary repair of water proofing treatment.
Top Khurra 0.6mx0.6m for rain water pipe in 25mm thick cement concrete 1:2:4 over 50.00 thick cement concrete 1:8:16. Pb-CSR-Ref.-13.45-T/R.
PLASTERING & POINTING: 12.5 mm thick cement plaster 1:4. Pb-CSR-Ref.-15.9-T/R.
CONCRETE: Cement concrete 1:6:12. (b) With stone aggregate 40mm gauge. (i) mixing by manual means. Pb-CSR-Ref.-10.8(b)(i)-T/R.
mbm developers
Rajinder Kumar
M/s Liak Ahmed
Reliable Engineers
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .