Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Rejected-Technical 2ND FLOOR B 1 626 B 1 JANAK PURI JANAKPURI WEST DELHI WEST DELHI DELHI 110058 UDYAM DL 03 0006715 07AALCS9606C1Z9 B M R MSME STATUS AS VERIFIED | WEST DELHI | DELHI | 110058 | Rejected-Technical DPC recommended the bidder not qualified |
Tender Value
₹30 L
EMD Value
₹25,000
Closing Date
14 Feb 2023, 2:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Registrar (S and P)
Delhi Technological University, Bawana Road, Delhi-110042
Annual Rate Contract for Network related services
2023_DTU_235387_2
F.DTU/CC/2021-22/136
Open Tender
Repair and Maintenance Services
Lump-sum
365 days
Delhi Technological University, Bawana Road
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹25,000
Yes
O/o Head (Computer Centre)
2 Jun 2023
24 Jan 2023
14 Feb 2023
24 Jan 2023
14 Feb 2023
24 Jan 2023
30 Jan 2023
UTB14:B70P cable- 305 Mtr
24 port Patch Panel
Wire Manager/ Patch Chord Minder panel
Information outlets (Single SMB)
Patch Cord- 1 Meter
Patch Cord- 2 Meter
Patch Cord- 3 Meter
RJ45 connector ( Pack of 100 )
6 Core Fiber Optic outdoor armoured cable-Single Mode
6 Core Fiber Optic indoor armoured cable-Single Mode
48 Core Fiber Optic Outdoor armoured Cable-Single Mode
6 Core Fiber Optics outdoor armoured Cable-Multimode
6 Core Fiber Optics indoor armoured cable- Multimode
48 Core Fiber Optic Outdoor armoured Cable-Multi Mode
Pigtail SC/LC-SM
Pigtail SC/LC-MM
Optical Fiber Patch Core SM LC-SC- 3 mtr
Optical Fiber Patch Core SM LC-LC 2 mtr
Optical Fiber Patch Core SM LC-SC- 5 mtr
Optical Fiber Patch Core SM LC-LC 5 mtr
Optical Fiber Patch Core MM LC-SC- 2 mtr
Optical Fiber Patch Core MM LC-LC 2 mtr
Optical Fiber Patch Core MM LC-SC- 5 mtr
Optical Fiber Patch Core MM LC-LC 5 mtr
LIU, 12 fiber, 1 U 19” Rackmount enclosure-SM
LIU, 24 fiber, 1 U 19” Rackmount enclosure-SM
Fiber Optic Madular Panel
48F Joint Enclosure
19 “ Rack, Wallmount 530 mm depth, 6U height,Front glass / venteddoor (lockable) and side panel can open
19 “ Rack, Wallmount 530 mm depth, 9U height, Front glass / vented door (lockable), and sidepanel can open
19 “ Rack, Wallmount 530 mm depth, 9U height, Front glass / vented door (lockable), and sidepanel can open
19“ Rack,Floor mounted, 19" Sever/ Networking Rack Cabinet (600*800*), 24 U height, Front glass /vented door( lockable)
19“ Rack,Floor mounted, 19" Sever/ Networking Rack Cabinet (600*800*), 42 U height, Front glass /vented door( lockable)
25 MM PVC Conduit/Casing ( 100 Mtr)
32 MM PVC Conduit/Casing ( 100 Mtr)
40 MM HDPE Pipe ( 200 Mtr)
50 MM HDPE Pipe ( 200 Mtr)
Supply of 1"diameter GI pipe (100 Mtr)
SFP-SM-1G
SFP-SM-10G
SFP-MM-1G
SFP-MM-10G
Route survey & documentation for laying of UTP & fiber cable along with detailed cable route diagram, rack position, cable length from each node to switch, identification of switch location with labels & route marking as per standard and approved labelling plan etc on per node basis
Laying of UTP Cat6 cable inside building/premises
Fixing of PVC Conduit
Installation of Jack Panel & end-to end connectivity of UTP Cat6 cable on Jack Panel
Installation of Information Outlet points
Testing of Laid Cable
In building laying of fiber in duct/conduit
Laying of fiber outside building location point to point connectivity(per meter)
Excavation and resurfacing of soil
Excavation and resurfacing of concrete-
Excavation under road crossing-trenchless
Installation/Fixing of 1"diameter GI Pipe underground and on surface
Laying & Installation of HDPE pipe
Splicing of Fiber Cable including pigtail
Cable pulling pit made of reinforced concrete and brickwalls with removable covers
Performance testing of laid fiber optic cable for continuity, length &dB loss as per EIA/TIA455-60 document for FO test procedure 7 documentation of the result
Pentascanning
OTDR scanning and report(per connectivity pair)
Installation of Rack- upto 12 U
Fiber chamber installation
I3E IT INFRA SYSTEMS
Megha Gaur
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .