Loading…
Loading…
Tender Value
₹16.5 L
EMD Value
₹33,020
Closing Date
27 Aug 2026, 6:00 pmDue today
Executive Engineer
Irrigation and FC Div. Baramulla
Nand Kishore Temple- Construction of Chain Link Fencing and Stone Masonry Wall balance work of on L/S of OFC at Seer Sopore at RD 160.30 Kms. (IRRSS2627100224).
2026_IFC_319832_1
e-NIT No 07 of 2026-27
Open Tender
Civil Works
Percentage
30 days
Executive Engineer I and FC Division Bla
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,500
Yes
Chief Engineer Kashmir I and FC Department
₹33,020
27 Aug 2026
6 Aug 2026
29 Aug 2026
6 Aug 2026
27 Aug 2026
6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres
All kinds of soil | 194.58 | cum | 256.85 | ₹49,977.87 |
| 2 | providing and laying of dry stone soling (nallah) including supply of stones | 10.56 | Cum | 937.9 | ₹9,904.22 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with:
1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 5.75 | Cum | 5,733.6 | ₹32,968.2 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level
1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 16.1 | Cum | 7,788.4 | ₹1,25,393.24 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for:
Foundations, footings, bases of columns etc. for mass concrete. | 43.7 | Sqm | 286.35 | ₹12,513.5 |
| 6 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with:
Cement mortar 1:6 (1 Cement : 6 coarse sand) Quarry | 124.2 | cum | 7,677.35 | ₹9,53,526.87 |
| 7 | Providing & laying damp-proof Course 40 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone agg 12.5 mm nominal size) and curing complete | 13.8 | Sqm | 346.7 | ₹4,784.46 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level
Thermo-Mechanically Treated bars of grade Fe-500D or more. | 797 | Kgs | 123.2 | ₹98,190.4 |
| 9 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with:
1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 4.66 | cum | 6,591.25 | ₹30,715.23 |
| 10 | Pointing on stone work with cement mortar 1 : 3 (1 cement : 3 fine sand):-Flush/Ruled Pointing | 92 | Sqm | 297 | ₹27,324 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
BOQ_1060696.xls
BOQ • 0.28 MB
corrigendumII.pdf
PDF • 0.78 MB
corrigendumI.pdf
PDF • 0.78 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].