Loading…
Loading…
Tender Value
₹33.5 L
EMD Value
₹36,000
Closing Date
25 May 2026, 6:00 pmClosed
Executive Engineer R and B Division, Palanpur
C R To Various road in Gadh Section (Work for Jungle cutting, Earth work, Metal Patch work, Labour for BT patch and CD Clearing, Quarry spall Misc) Ta : Palanpur Dist : Banaskantha
305602
4 of 2026-27
Open
Civil - All
Works
Banaskantha
10 documents required · 10 mandatory
₹1,500
Executive Engineer, R and B Division, Palanpur
₹36,000
15 May 2026
15 May 2026
15 May 2026
25 May 2026
15 May 2026
BILL OF QUANTITIES
QUANTIW STATEMENT
Ir. Description of ltem (with brief specitication and Estimated rate
No. rererence to book ol specilications)
Quantity laGln ln words
1 Ctearing and grubbing road land inctuding 32.69 Hec 28455.(x) Rupees Twenty
uprooting rank vegetation grass bushes, shrubs, Eight Thousand
sapting and trees ginh up to 300 mm removat ot Four Hundred
stumps ol trees cut eartier and disposat of Fllty Flve and
unserviceabte materiats (c) By mechanicat Paise Nlne Only
means in area ol lightjungte
2 Earthwork for embankment with setected soit 2970.00 Cum. 792.23 Rupees one s70,923.10
including breaking ctods, dressing with alt tead Hundred Nlnety
and tift CBR not less than 6% {exctuding watering Two and Palse
--1 Twenty Three
& consotidation) (A) From Borrow Pits within land
3 Providing Vibratory rotter 8 - 10 tonnes @ 100 50.00 hour 850.79 Rupees Elght
cum per hour. Hundred Flfty
4 Supptying of graded Machine Crushed metat ol 310.00 968. 19 Rupees Nlne
fotlowing size as directed inctuding att taxes & "rJ Hundred Sixty
royatties and filting mesaure boxes with att tead Elght and Paise
and lift etc. comptete (3) Machine crushed Metat Nineteen Onty
45mm to 63mm size.
Supptying and stacking screening grit of approved 50.00 Cum 955.76 Rupees Nlne
quatity on road site inctuding taxes & royalties Hundred Flfty
and fitting measure boxes with att tead and lift Flve and Paise
Supptying and stacking stonedust of approved 25-00 Cum
Seventy SlxOnty
quatity on road site inctuding taxes & royalties Hundred Nine
and fitting measure boxes with att tead and tift and Palse
etc. comptete. SeventyThree
the stone aggregate for soting and
WBt4 including fitting the interstices forming the
surface to require camber and gradient as ,- l+
310.00 lcurn-l *2:21 nupees two
directed inctudig stonedust etc. comptete.
tl Twenty Four Onty
8 Spreading btindage or road crust fitLing the gaps 75.00 Cum 154.84 Rupees One
in metatand Levetting to camber and gradient as Hundred Fifty
Eighty Four Onty
Rotting and consotidation water bound macadam 257.00 Cum 249.34 Rupees Two
( except taterite and kankar inctuding watering Hundred Forty
not exceeding 150mm thickness ( main tayer ) Nine and Paise
Thlrty FourOnty
inctuding binding materials inctuding fittin in
depression which occurs during the process. (B)
With power rotter exceeding 8 tonne and not
exceeding 12 tonnes.(Rotting and consotidation
(with watering)
10 Providing Hard Side Sotder of 100mm thick for 818.00 Cum. 907.9I, Rupees Nlne
embankment using quarry spatt with att tead and tlundred Seven
tift and inctuding watering and rotting and and Palse Ninety
consotidation ol sub grade in tayers at OMC to
required dry density inctuding fitting the
depressions which occur during the process
using power rotter 8T to 10 T (Setected Quarry
Spatt having CBR vatue not tessthan 20.00).
11 Providing ea rth excavator inctuding cteaning sites 300.00 hour 718.98 Rupees Seven
lor hire charges of excavator including diesel., Hundled
tabours, drivers etc. comptete as directed. Eighteen and
12 Opening att size pipe of CD works / SLab Drain / 162.00 km 2747.26 Rupees Two 347856.L2
Box Cutvert and other Structures for pre- Thousand One
monsoon treatment inctuding removing the Hundred Forty
jungte up to 10 l4t on boths sides U/S & D/S of Seven and Palse
Twenty six onty
structures and both sides approaches (upto
ROW) 30 Mt tength & opening the water way
ctearance and other misc. work etc comptete
including before after photograhy, videography
13 Providing tabour at any site (mate /female) - 300.00 each 594.89 Rupees Five 77U67.O0
Labour charges - f4azdoorwith Hand Cart (1038) Hundred Nlnety
Eighty Nine Onty
Rupees Thirty Five Lakhs FittyOne Thousand Seventy and Paise Thirty Six Onty
l/We am/are wittingto carry outlhe work at--.% above/betow percent(Shoutd bewritten in figures and words)of
the estimated rate mentioned above. Amount of my /our tender works out as under.
Estimated amount put to tender Rs............... Estimated amount put to tender Rs...............
Credit For Dlsmentat Materlat and Recovery (Flx Deductlon) Rs.
Signature of Contractor
Deputy Enginee r ive Engineer
R&BSub sio n B Division
Patanpur Patanpur
Notes 1- The Contractor shaLL exhibit a board with detaited specification and detaits ofwork as directed by the Engineer-ln-Charge for
whrch no extra payment shatt be made.
Notes 2 - The tabour cesswitt be deducted as per prevaitingrutes i.e. 1% oftheworkdone.
Notes 3 - GST and lncome taxTDS witt be deducted at a source white making payments of bitls.
Note 4 - ln a(t R.C.C. ltems in Rate Anatysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017 Cement
Consumption/16/C Oatet77l05l2077 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actuat mix design
the cost ofditference of cement consumption have been deducted fromthe rate oforignal item at the rateofinput rate meotioned in att
Note5-CreditAmountRs 77.15 For oismentatti oF l4aterials shall be deducted from first runni account bill.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
All GR 1.pdf
All GR 2 new.pdf
All GR 3.pdf
All GR 4.pdf
All GR 5.pdf
All GR 6.pdf
All GR 7.pdf
BOQ Gadh section.pdf
Detail Specification Part 1.pdf
Detail Specification Part 2.pdf
SBD Part 1.pdf
SBD Part 2.pdf
SBD Part 3.pdf
SBD Part 4.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .