Loading…
Loading…
Tender Value
₹1.6 Cr
EMD Value
₹1.6 L
Closing Date
24 Sept 2026, 5:00 pmClosed
Chief Engineer, R.W. Circle, Keonjhar
O/o C.C.E., R.W. Circle, Keonjhar
Construction of Weir adjacent to bridge over Hanumantia Nallah at 3rd Km. on Telkoi to Barhadebata road in the District of Kendujhar.
2026_CERWI_140981_1
NCB-17/RWCKJR/2026-27
National Competitive Bid
Civil Works - Bridges
Percentage
360 days
Keonjhar
4 documents required · 4 mandatory
₹10,000
₹1.6 L
Yes
11 Sept 2026
11 Sept 2026
25 Sept 2026
11 Sept 2026
24 Sept 2026
11 Sept 2026
11 Sept 2026 - 23 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling stone pitching/ dry stone spalls including T&P, sorting the dismantled material, disposal of unserviciable material and stacking the serviceable material with all lifts and lead of 1000 meters etc complete as per direction of Engineer-in-Charge. | 166.44 | cum | 274.84 | ₹45,744.37 |
| 2 | Earthwork in excavation in foundation in hard soil within the initial lead and lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3 mtr in depth etc complete as per the direction of the Engineer in Charge. | 340.16 | cum | 360.15 | ₹1,22,508.62 |
| 3 | Filling in Foundation Trenches with sand as per drawing and technical specification and as per the direction of the Engineer-in-charge. | 54.64 | cum | 644.95 | ₹35,240.07 |
| 4 | Plain Cement Concrete M-15 Grade using 40mm down graded chips including watering & curing with all cost, carriage, royalty & taxes etc complete as per the direction of the Enngineer in Charge. | 40.98 | cum | 7,327.02 | ₹3,00,261.28 |
| 5 | Reinforced Cement Concrete M-30 Grade using 20mm down graded chips in superstructure including watering & curing with all cost, carriage, royalty & taxes etc complete as per the direction of the Engineer in Charge. Cutoff Wall | 44.59 | cum | 15,936.8 | ₹7,10,621.91 |
| 5.1 | In Foundation / Raft | 314.9 | cum | 7,956.25 | ₹25,05,423.13 |
| 5.2 | Weirs | 29.18 | cum | 15,859.55 | ₹4,62,781.67 |
| 5.3 | Columns | 30.38 | cum | 15,859.55 | ₹4,81,813.13 |
| 6 | Straightening, cutting, bending binding M/S or T.S. rods and placing in position etc complete as per the direction of the Engineer in Charge. | 377.02 | qtl | 9,091.55 | ₹34,27,694.3 |
| 7 | Rough stone dry packing in approns and revetments with hard granite stone (30 cm & above) including cost of all materials etc complete as per the direction of the Engineer in Charge. | 2,678.98 | cum | 2,843.46 | ₹76,17,572.47 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 4.69 MB
Tendernotice_1.pdf
PDF • 3.13 MB
BOQ_609606.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .