Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹73.9 LAdmitted-Finance | ₹73.9 L | L1 | Admitted-Finance |
| 2 | L2₹73.9 L+₹6,597.62 (0.09%)Admitted-Finance | ₹73.9 L+₹6,597.62 (0.09%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Nicolau Nunes L1 | RAF Sequeira L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation by mechanical means in all types of strata comprising any of the materials such as soil, sand, silt, clay, gravel, moorum of all varieties, shingles, pebbles, all types of conglomerates, laterite rock, soft rock, ordinary rock, disintegrated rock, weathered, fissured/shattered decomposed rock and all such other materials either in full or in parts as the case may be adopting any approved method or methods as may be convenient or permitted including chiseling, wedging etc. in all conditions such as dry, moist, saturated, submerged, foul conditions etc. including setting out construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling excavated earth to the extent required and disposing of the surplus excavated / rock as directed by the Engineer in charge etc. for all leads and lifts etc. as specified and directed etc. all complete. | 912 | Cum | 350 ₹3,76,656 Lowest | 350 ₹3,76,656 Lowest |
| 2.00 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 66 | Cum | 2,500 ₹1,94,700 Lowest | 2,500 ₹1,94,700 Lowest |
| 3.10 | Centering and shuttering including struttings, propping etc. and removal of formwork for :
Foundations, footings, bases for columns and mass concrete | 306.6 | Sqm | 400 ₹1,44,715.2 Lowest | 402 ₹1,45,438.78 |
| 3.20 | vertical surfaces such as retaining walls , return walls, walls (any thk) including attached pilasters, buttresses, plinth and string courses, fillets, etc. | 657.5 | Sqm | 580 ₹4,49,993 Lowest | 580 ₹4,49,993 Lowest |
| 4.10 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in:
All works upto plinth level. | 330 | Cum | 6,011 ₹23,40,683.4 Lowest | 6,012 ₹23,41,072.8 |
| 4.20 | In retaining walls , return walls(any thk) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping bed blocks, anchor blocks, plain window sills, fillets etc, upto floor five level. | 375 | Cum | 8,500 ₹37,61,250 Lowest | 8,509 ₹37,65,232.5 |
| 5.00 | Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall,wing wall and earth retaining structure complete as directed by the Engineer in charge.
110 mm dia. | 254.6 | RM | 400 ₹1,20,171.2 Lowest | 405 ₹1,21,673.34 |
Tender Value
₹70.5 L
EMD Value
₹1.4 L
Closing Date
13 Oct 2025, 5:00 pmClosed
EE II
aquem baixo rawanfond
Construction of retaining wall under sy. no. 142/5-A at Birondi in V.P. Benaulim in Benaulim Constituency.
2025_WRD_24811_1
WDII/TECH/F17/22e/2025-26/SN1
Open Tender
Miscellaneous Works
Item Rate
90 days
Rawanfond
Please refer Tender documents.
3 documents required · 3 mandatory
₹8,000
₹1.4 L
22 Oct 2025
29 Sept 2025
14 Oct 2025
29 Sept 2025
13 Oct 2025
29 Sept 2025
Amount
Earthwork in excavation by mechanical means in all types of strata comprising any of the materials such as soil, sand, silt, clay, gravel, moorum of all varieties, shingles, pebbles, all types of conglomerates, laterite rock, soft rock, ordinary rock, disintegrated rock, weathered, fissured/shattered decomposed rock and all such other materials either in full or in parts as the case may be adopting any approved method or methods as may be convenient or permitted including chiseling, wedging etc. in all conditions such as dry, moist, saturated, submerged, foul conditions etc. including setting out construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling excavated earth to the extent required and disposing of the surplus excavated / rock as directed by the Engineer in charge etc. for all leads and lifts etc. as specified and directed etc. all complete.
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Centering and shuttering including struttings, propping etc. and removal of formwork for : Foundations, footings, bases for columns and mass concrete
vertical surfaces such as retaining walls , return walls, walls (any thk) including attached pilasters, buttresses, plinth and string courses, fillets, etc.
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: All works upto plinth level.
In retaining walls , return walls(any thk) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping bed blocks, anchor blocks, plain window sills, fillets etc, upto floor five level.
Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall,wing wall and earth retaining structure complete as directed by the Engineer in charge. 110 mm dia.
RAF Sequeira (BID ID -53767)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .