Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹56.7 L
EMD Value
₹56,732
Closing Date
10 Jul 2024, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
NBCC Bhawan
NBCC Bhawan
Annual operation and Maintenance of Civil Installation, Electrical Installation, specialized E and M equipment such as Service Lift, Housekeeping, special repair (Civil, E and M) and round the clock security services at Commercial Complex, Jackson Gate, Agartala
NBCC/REDivision/Agartala/NIT/2024/13~EW9e571d3552460acef636fffa
NBCC/REDivision/Agartala/NIT/2024/13
Open Tender-Domestic
Maintenance Contracts
NBCC Bhawan
₹2,950
₹56,732
10 Jul 2024
10 Jun 2024
10 Jul 2024
10 Jun 2024
10 Jul 2024
Grand Total 56,73,135.00 i/c GST & Labour Cess
BILL OF QUANTITIES
AMOUNT in INR i/c
S.No. Description of item of work Unit QTY of GST for contract
in INR i/c of GST
period of one Year
1 SH I:Electrical and Mechanical Maintenance work
All inclusive comprehensive maintenance , upkeep of all electrical internal & external
installations, Lights, etc. as per details below at NBCC Commercial Complex, Lucknow
a) for all days in a month i/c holidays complete with materials , consumables etc. as per
terms and conditions attached and as per direction of Engineer -in-Charge.
• Light points/ Fan pts/ Ex-fan pts./ Call bell pts.
• 5 amp plug points
• 15 amp power plug points
• 20/30 amp Ind. Power plug points
• Telephone outlet, TV Outlet
• Telephone wire, TV Wire
• Fluorescent light fittings
• All type of light fittings as per Terms & Condition
• SP, SPN, TP & TPN MCB DB’s with MCB’s, Timers
b) • Bus Bars, Bus duct and Tap off box of different ratings
• Cable trays of different size
• 63 / 100 amps TP & N Switch units
• 125 Amp. TP MCCB’s
• Street Lights, Solar Lights and compound lights with HPSV fittings, control gears etc. Per Month 12 37,130.00 4,45,560.00
• All type of feeder pillars with switch gears etc.
• All HT, LT, UG cables for streetlights.
• And others as desired by Engineer-in-charge.
All panels i/c UPS Panels and common area lights Street light, pump house, basement
parking, STP etc.
• Lightning Protection System
• Earthling system
• Urinal sensor with batteries
c) Pump House, UG Tank E & M installations
d) Any other pump set/ other installation
Any other works in connection with the smooth operation & maintenance work not
e) mentioned above , but required to be carried out within the cost and/ or also as per
direction of the Engineer -in - charge .
Weekly preventive maintenance shall be essentially carried out by deploying full team
f) on Saturday and Sundays to check each & every civil , electrical, fire fighting, fire alarm ,
pumps items etc. and maintained the record .
All defective Electrical and Consumables Items (material) Bulbs, cables, wires, Tubes,
J) Porch Lights, etc. are to be replaced as and when required to the satisfaction of Engineer
In Charge and the cost is inclusive of the same.
i) Cost for Electrical Maintenance
TOTAL for SH - I for Electrical and Mechanical Maintenance work 4,45,560.00
2 SH II: Operation of Specialized E & M equipments
2.1 CAMC of LIFTS
1 nos Service lift(Repairing cost) 1 6,45,000.00 6,45,000.00
Service lift(AMC) 1 1,12,838.00 1,12,838.00
Total for CAMC of LIFTS 7,57,838.00
Total for SH-II: Operation of Specialized E & M equipments 7,57,838.00
3 SH III - Manpower requirement & Consumables for Civil Work
3.1.1 Plumber in General Shift Considering 5 days in a month Nos. 1 67,223.08 67,223.08
3.1.2 Mason in General Shift. Considering 5 days in a month Nos. 1 67,223.08 67,223.08
3.1.3 Helpers to Plumber/Mason/Carpenter etc. General Shift - Semi Skilled - 5 Days in a Nos. 1 48,805.38 48,805.38
Tools, tackles, minor consumables, petty materials required for Wall plaster repair, door
frame repair, cracks filling, minor leakage arresting, flooring tile repair, stone repair,
Door & window repair, door stopper, nails fixing, minor steel and MS repairs, glass doors
repairs, locks repair and service, minor wooden floor repair, glass door fittings, glass LS (Monthly
films refixing, restoration of water supply, arresting of leakages from sanitary fittings, basis)
bathroom fittings repairs, cleaning of fittings WC, faucet. Trap cleaning, Manholes,
sewer , drainage cleaning and removal of chokage.
Total for SH III - Civil Maintenance/Repair Work 4,83,251.54
Annual operation & Maintenance of Civil & Electrical at Commercial Complex, Jackson Gate, Agartala, Tripura
BILL OF QUANTITIES
AMOUNT in INR i/c
S.No. Description of item of work Unit QTY of GST for contract
in INR i/c of GST
period of one Year
Prime cost of Rs. 5,00,000/- (Rs. 5.0 Lakh) is taken to on Lump sum basis, however same
shall be paid on actual basis only on purchase of any required material or or
miscellenous work or any additional work done (which is not covered in any BoQ items)
only on instruction of engineer-in-charge. The same shall be carried out by the
contractor on competitive market rates and submission of tax invoice and duly certified
by Engineer-In-Charge.
4.1 Miscellaneous works like minor repair works like damaged drain, reparing of building LS 1 8,00,000.00 8,00,000.00
entry gate, door & window fixed, plumbing fittings, water pumps including IRP,
replacement of polycarbonate sheet fixted at building entry door, broken glass, external
light fixtures.
Cleaning of Manholes/gully chambers/ inspection chambers &flushing of building sewer,
Cleaning of stom water drains, collection of water samples for physical, and bacterioligicl
anlysis of water minimum two times in a year etc.
Total for SH IV- 8,00,000.00
5 SH - V Civil Works as per CPWD DSR 2023
14.1 Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.
meters and under, including cutting the patch in proper shape, raking out joints
and preparing and plastering the surface of the walls complete, including disposal
of rubbish to the dumping ground, all complete as per directions of Engineer-In-
14.1.1 With cement mortar 1:4 (1 cement : 4 fine sand) Sqm 409.5 547.40 2,24,160.30
13.87 White washing with lime ti give an even shade:
13.87.1 Old work(two or more coats) sqm 4467.6 22.85 1,02,084.68
13.81 Distempering with 1st quality acrylic distember (Ready mix) having VOC content less
than 50 grams/ litre of approved brand and manufacture to give an even shade& colour
13.81.1 Old work (one or more coats) Sqm 1002.6 62.70 62,863.08
13.91 Removing dry or oil bound distemper, water proofing cement paint and the like by
scrapping, sand papering and preparing the surface smooth including necessary repairs Sqm 4467.6 25.15 1,12,360.17
to scratches etc. complete.
13.99 Painting with synthetic enamel paint of approved brand and manufacture of required
colour to give an even shade :
13.99.1 One or more coats on old work Sqm 863.98 102.80 88,817.14
13.111 Finishing walls with Acrylic Smooth exterior paint of required shade
13.111.2 Old work (One or more coat applied @ 0.90 ltr/10 sqm). Sqm 3465 80.65 2,79,452.25
14.72 Providing and fixing double scaffolding system (cup lock type) on the exterior
side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to
centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes,
M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for
working platform etc. and maintaining it in a serviceable condition for the
required duration as approved and removing it there after . The scaffolding
system shall be stiffened with bracings, runners, connection with the building etc Sqm 100 338.25 33,825.00
wherever required for inspection of work at required locations with essential
safety features for the workmen etc. complete as per directions and approval of
Engineerin- charge .The elevational area of the scaffolding shall be measured for
payment purpose .The payment will be made once irrespective of duration of
scaffolding. Note: - This item to be used for maintenance work judicially,
necessary deduction for scaffolding in the existing item to be done.
14.78 Cleaning of under ground sump, Over Head R.C.C. Tank (independent staging) including
disposal of slit and rubbish, all as per direction of Engineer-in-Charge. The cleaning shall consist
following operations:-
(i) Tank shall be emptied of water by pumping & bottom shall be cleaned of slit and other
(ii) Entire surface area of the sump shall then scrubbed thoroughly with wire brush etc. and Sqm 70 422.70 29,589.00
pressure washed with water.
(iii) Chlorination of RCC internal surface by liquid chlorine.
(iv) The treated surface shall be dried using air jetting and all loose particles shall be removal
from the surface.
(v) Finally the surface shall be treated with ultraviolet radiation etc. as per direction of Engineer-
Annual operation & Maintenance of Civil & Electrical at Commercial Complex, Jackson Gate, Agartala, Tripura
BILL OF QUANTITIES
AMOUNT in INR i/c
S.No. Description of item of work Unit QTY of GST for contract
in INR i/c of GST
period of one Year
17.2 Providing and fixing white vitreous china pedestaltype water closet( European
type W.C pan)with swat and lid, 10 litre low level white P.V.C.flushing cistern,
including flush pipe, with manually controlled device(handle lever), conforming to
IS:7231, with all fittings and fixtures complete, including cutting and making good
the walls and floors whereever required.
17.2.1 W.C. pan with ISI marked white solid plastic seat and lid each 6 6,515.55 39,093.30
Total For SH V - Civil Works as per CPWD DSR 2023 9,72,244.92
6 SH VI: Housekeeping Services
6.1 Deployment of Manpower for providing the house-keeping service of entire
6.1a Housekeeping Staff Nos. 2 49,212.00 5,90,544.00
Providing all cleaning materials like soaps, detergents, phenyl, chemicals,
dusters, , jharus/brooms, wipers, toilet cleaners, glass cleaning chemicals,
bleaching powder, odonils, cockroaches killing sprays, room fresheners etc. & LS(Monthly
6.2 other cleaning and petty material required for cleaning and maintenance of 12 4,000.00 48,000.00
various items Like UG/OH tank Cleaning and other cleaning items as specified in
scope of work in tender document or as per the entire satisfaction of Engineer-In
Total For SH V - Housekeeping Serivces 6,38,544.00
7 SH - VII Security Services (24 X 7 Basis)
Providing round the clock security guard without gun for watch & ward of the
entire complex by deploying neatly dressed security guards in 8 hour's shift
7.1 including necessary T&P like torch, lathi and uniform etc. complete, as per the Nos. 4 1,31,308.00 15,75,696.00
direction of Engineer-in-charge. Total shifts in day - 3 Nos. and each shift of 8
Total For SH VII Security Serivces 15,75,696.00
Grand Total (SH-I + SH-II + SH-III + SH-IV + SH-V + SH-VI + SH-VII) 56,73,134.46
Grand Total (SH-I + SH-II + SH-III + SH-IV + SH-V + SH-VI + SH-VII) 56,73,134.46
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
NIT.pdf
Tender Document
GCC_Contracting_PMC_2022_amen_8.pdf
Tender Document
Scope of Work.pdf
Tender Document
SCC Agartala.pdf
Tender Document
Approved Make List.pdf
Tender Document
Instructions_for_online_bid_submission.pdf
Tender Document
BOQ.pdf
Tender Document
corrigendum-2706-CorrigendumII.pdf
pdf • 0.03 MB
corrigendum-2690-CorrigendumI.pdf
pdf • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .