Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAccepted-AOC 12 13 523 ST NO 20 NAGARJUNA NAGAR TARNAKA HYDERABAD TELANGANA 500017 | HYDERABAD | TELANGANA | 500017 | L1 | Accepted-AOC PAC RECOMMENDED FOR AMC OF 360 ACs only | |
| 2 | L2₹7.2 L+₹14,939 (2.11%)Rejected-AOC | L2 | Rejected-AOC PAC RECOMMENDED FOR AMC OF 360 ACs only | |
| 3 | L3₹12.9 L+₹5.8 L (81.7%)Rejected-AOC | L3 | Rejected-AOC PAC RECOMMENDED FOR AMC OF 360 ACs only | |
| 4 | L4₹18.3 L+₹11.2 L (159.0%)Rejected-AOC | L4 | Rejected-AOC PAC RECOMMENDED FOR AMC OF 360 ACs only | |
| 5 | L5₹24.5 L+₹17.4 L (246.0%)Rejected-AOC 107 2 AMPA MANOR IST FLOOR NELSON MANICKAM ROAD AMINJIKARAI CHENNAI 0 600 029 NO 107 2 AMPA MANOR 1ST FLOOR NELSON MANICKAM ROAD AMINIJIKARAI AMINJIKARAI | L5 | Rejected-AOC PAC RECOMMENDED FOR AMC OF 360 ACs only |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
18 Jan 2021, 2:00 pmClosed
DIRECTOR
ICAR-NAARM, Rajendra nagar, Hyderabad
tender for Amc of Acs
2020_DARE_605721_1
F.No-5-556/19-20/AC-Amcs
Open Tender
AMC/ Maintenance Contracts
Works
365 days
ICAR-NAARM
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹30,000
Yes
3 Apr 2021
26 Dec 2020
19 Jan 2021
26 Dec 2020
18 Jan 2021
26 Dec 2020
26 Dec 2020 - 16 Jan 2021
Electrical Items :
SPLIT 1.5 TON
SPLIT 2 TON
SPLIT 3 TON
PLANTS 30 TON
PLANTS 7.5 TON
CASSETTE 3 TON
CASETTE 4 TON
TOWER 4.5 TON
TOWER 4 TON
TOWER 3 TON
TOWER 2.5 TON
RATE PER UNT FOR WASHING, OILING, CLEANING, GREASING, SERVICING, AND REPAIR OF COMPRESSOR AND MOTOR ETC FOR ACS WHICH ARE NOT INCLUDED IN THE AMC CONTRACT
ANY OTHER SERVICING, PL SPECIFY
SPLIT 1.5 TON RATE FOR ONLY GAS CHARGING / GAS TOP-UP
SPLIT 2 TON RATE FOR ONLY GAS CHARGING / GAS TOP-UP
SPLIT 3 TON RATE FOR ONLY GAS CHARGING / GAS TOP UP
PLANTS 30 TON FOR ONLY GAS CHARGING / GAS TOP UP
PLANTS 7.5 TON ONLY GAS CHARGING / GAS TOP UP
CASSETTE 3 TON GAS CHARGING / GAS TOP UP
CASSETTE 4 TON GAS CHARGING / GAS TOP UP
TOWER 4.5 TON ONLY GAS CHARGING / GAS TOP UP
TOWER 4 TON ONLY GAS CHARGING / GAS TOP UP
TOWER 3 TON ONLY GAS CHARGING / GAS TOP UP
TOWER 2.5 TON ONLY GAS CHARGING / GAS TOP UP
INSTALLATION OF NEW AIR CONDITIONER
SHIFTING AND REINSTALLATION OF AIR CONDITIONER (INCLUSIVE OF GAS FILLING ETC.)
SUPPLY OF EXTRA COPPER PIPE {GOOD QUALITY} [PER METER]
Sayee Engineering Company
M A GROUP OF AGENCIES
UNIVERSALAIRCON AND ENGINEERING SERVICES
TOOT MNE TECH PRIVATE LIMITED
GENIUS AIRCON PVT LTD
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .