Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹15.2 LAdmitted-Fee/PreQual/Technical/Finance | -36.87% | ₹15.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹16.2 L+₹99,896.02 (6.56%)Admitted-Fee/PreQual/Technical/Finance | -32.73% | ₹16.2 L+₹99,896.02 (6.56%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹17.1 L+₹1.9 L (12.5%)Admitted-Fee/PreQual/Technical/Finance | -29.01% | ₹17.1 L+₹1.9 L (12.5%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹20.5 L+₹5.3 L (34.6%)Admitted-Fee/PreQual/Technical/Finance | -15.00% | ₹20.5 L+₹5.3 L (34.6%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Acc no not uploaded as per Nit conditions |
Tender Value
₹24.1 L
EMD Value
₹48,260
Closing Date
10 Aug 2026, 4:00 pmClosed
Office of The Executive Engineer RnB Division Patt
Office of The Executive Engineer RnB Division Pattan
Upgradation of Hurcheck Nehalpora Road
2026_PWDJK_317601_10
NIT 38 of RnB Pattan 2026-27
Open Tender
Civil Works
Percentage
50 days
Office of The Executive Engineer RnB Division Patt
Please refer Tender documents.
5 documents required · 5 mandatory
₹800
Office of The Executive Engineer RnB Division Patt
₹48,260
18 Aug 2026
24 Jul 2026
11 Aug 2026
25 Jul 2026
10 Aug 2026
25 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | UPGRATION OF ROAD Engagement of JCB FOR Removal of Humps,clearance of sides,removal of inequalities and as needed onsite including disposal from site as per direction of engineer incharge | 10 | Hour | 1,200 | ₹12,000 |
| 2 | Supply sorting and of GSB/nallah muck/khakh bajri in 15cm layers incl sorting soreading to template and consolidation to the required gradient with PRR with 8-10 tonne capacity etc.incl all soets of carriages complete | 657 | Cum | 1,200 | ₹7,88,400 |
| 3 | Supply and stacking at site Graded Crushed stone aggregrate of size 63mm-45 mm and stone screening of size 13.2 mm nominal size (type A), moorum (Khakbajree) incld laying spreading and compacting stone aggregrate of specified sizes to WBM specifiacations in uniform thickness (75 mm compacted), hand picking, rolling with 3 wheeled road vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening/binding material to fill up interstices of course aggregrate,watering and campacting to the required density incld all carriages from approved source to site of work complete job (crushed from Broken Quarry). | 264.16 | Cum | 2,400 | ₹6,33,984 |
| 4 | CROSS DRAINAGE PIPES Providing / laying of RCC Pipes in proper position/ grade including cutting of road surface upto required depth, providing requisite cushion including carriage of all materials and pipes upto site of work complete.300mm | 14.62 | RM | 2,500 | ₹36,550 |
| 5 | PROTECTION WORK Earth work in excavation by mechanical means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earthband disposal of surplus excavated earth as directed. (in all kinds of soils). | 82.67 | Cum | 256.85 | ₹21,233.79 |
| 6 | P/L Stone Soling of Specified size duely hand packed incl. all carriages and loading/unloading. | 14.85 | Cum | 1,000 | ₹14,850 |
| 7 | Providing and Laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level in 1:4:8 mix. Incld all carriages | 9.9 | Cum | 5,667.9 | ₹56,112.21 |
| 8 | Providing and Laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level in 1:2:4 mix. | 110.22 | Cum | 7,056.25 | ₹7,77,739.88 |
| 9 | Centering and Shuttering including strutting, propping etc. and removal of the same for foundatons. | 183.7 | Sqm | 286.35 | ₹52,602.5 |
| 10 | Providing ang and fixing of 75mm PVC pipes for weep holes, including all carriages. | 77 | RM | 250 | ₹19,250 |
stage.html
html • 0.02 MB
finance_1041722.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
BOQ_1041722.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .