| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC | ₹4.2 L | L1 | Accepted-AOC Accepted Vide Resolution No.8(1) Dated.19.05.2026 |
| 2 | L2₹4.2 L+₹346.68 (0.08%)Rejected-Finance | ₹4.2 L+₹346.68 (0.08%) | L2 | Rejected-Finance Second Bidder. Kept in Abeyance till the execution of Agreement by the First Bidder |
| Sl No | Description | Qty | Unit | A N JAYAPRASAD L1 | MURALIDHARAN K L2 |
|---|---|---|---|---|---|
| 1.00Compound Wall Construction | |||||
| 1.00 | OD511887/2025-2026:Modified Data of Irrigation Dept. OD No.60.7.3 (DAR-2021)-DISMANTLING DR - Dismantling, Clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR Masonry including disposal of debris within a distance of 150m. | 10.49 | cum | 757.5 ₹7,948.45 Lowest | 760 ₹7,974.68 |
| 1.00 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 4.05 | cum | 2,542 ₹10,295.1 Lowest | 2,550 ₹10,327.5 |
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 2.92 | cum | 2,129.8 ₹6,229.67 Lowest | 2,130 ₹6,230.25 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 6.67 | cum | 359.7 ₹2,398.12 Lowest | 360 ₹2,400.12 |
| 1.00 | 2.28.1:Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil | 18 | sqm | 35.25 ₹634.5 Lowest | 36 ₹648 |
| 1.01 | OD511911/2025-2026:Data Modified (Irrigation Dept. OD-60.7.1)-DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 15.5 | cum | 3,653.7 ₹56,628.7 Lowest | 3,655 ₹56,648.85 |
| 1.01 | OD511973/2025-2026:Data Modified (Irrigation Dept. OD-60.7.1)-DRY RUBBLE MASONRY _ Departmental Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 4.91 | cum | 1,715.8 ₹8,426.29 Lowest | 1,720 ₹8,446.92 |
| 1.01 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 10.2 | cum | 8,343.4 ₹85,102.68 Lowest | 8,345 ₹85,119 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.7 | cum | 9,235.9 ₹24,936.93 Lowest | 9,236 ₹24,937.2 |
Tender Value
₹4.2 L
EMD Value
₹10,593
Closing Date
12 Mar 2026, 5:30 pmClosed
Muhsin Munavar-PK
The Assistant Enginee, LIDEW Section Kongad Grama Panchayath
Construction of Compound Wall and Gate for Cheraya LP School-Eas-Ward No-05-Pro-No-109-26
2026_LSGD_843731_1
ET-09-12/AE/LIDEW/KGP/2025-26
Open Tender
Civil Works - Others
Item Rate
270 days
Kongad Grama Panchayath
Please refer Tender documents.
7 documents required · 7 mandatory
₹935
Yes
₹10,593
Yes
25 Aug 2026
4 Mar 2026
16 Mar 2026
4 Mar 2026
12 Mar 2026
4 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Compound Wall Construction | |||||
| 1.001 | OD511887/2025-2026:Modified Data of Irrigation Dept. OD No.60.7.3 (DAR-2021)-DISMANTLING DR - Dismantling, Clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR Masonry including disposal of debris within a distance of 150m. | - | cum | - | - |
| 1.002 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 1 | cum | - | - |
| 1.003 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 1 | cum | - | - |
| 1.004 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 1 | cum | - | - |
| 1.005 | 2.28.1:Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil | - | sqm | - | - |
| 1.006 | OD511911/2025-2026:Data Modified (Irrigation Dept. OD-60.7.1)-DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | - | cum | - | - |
| 1.007 | OD511973/2025-2026:Data Modified (Irrigation Dept. OD-60.7.1)-DRY RUBBLE MASONRY _ Departmental Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 1 | cum | - | - |
| 1.008 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 1 | cum | - | - |
| 1.009 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1424172.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
PAgreement.pdf
Tender Documents • 0.06 MB
EPayament.pdf
Tender Documents • 0.01 MB
IPACT.pdf
Tender Documents • 0.06 MB
Affidavit.pdf
Tender Documents • 0.06 MB
FOT.pdf
Tender Documents • 0.06 MB
SBD.pdf
Tender Documents • 0.06 MB
BOQ_1424172.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .