Loading…
Loading…
Tender Value
₹1.9 Cr
EMD Value
₹3.9 L
Closing Date
29 Sept 2026, 4:00 pm2d left
Executive Engineer PWD RandB DIVISION THANAMANDI
Executive Engineer PWD RandB DIVISION THANAMANDI
Lanes Drains Beautification and Protection works in different wards of MC Thanamandi Under Capex Budget 2026 27 URIF
2026_PWDJK_324599_1
NIT No 48 of 2026 27 Dated 14 09 2026
Open Tender
Civil Works
Percentage
60 days
Thanamandi
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
Executive Engineer PWD RandB DIVISION THANAMANDI
₹3.9 L
14 Sept 2026
14 Sept 2026
30 Sept 2026
14 Sept 2026
29 Sept 2026
14 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | 2,478 | Cum | 479.3 | ₹11,87,705.4 |
| 2 | stone filling hand packed in horizontal on level including cost of stones | 868 | cum | 937.9 | ₹8,14,097.2 |
| 3 | Earth work in excavation by mechanical means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | 150 | cum | 256.85 | ₹38,527.5 |
| 4 | Providing and laying in position Cement concrete of specified grade excluding the cost of centering and shuttering – all work upto plinth level.1:5:10(1 cement : 5 coarse sand : 10 graded crushed stone aggregate 40 mm nominal size) | 648 | Cum | 4,826.5 | ₹31,27,572 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 352.34 | Cum | 5,733.6 | ₹20,20,176.62 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) 20% plum | 920 | cum | 4,774.46 | ₹43,92,503.2 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for:
Foundations, footings, bases of columns etc. for mass concrete. | 3,297 | sqm | 286.35 | ₹9,44,095.95 |
| 8 | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge. | 4,091 | sqm | 816.15 | ₹33,38,869.65 |
| 9 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete 50 mm thick with 20mm nominal size stone aggregate. | 165 | sqm | 562.15 | ₹92,754.75 |
| 10 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 13 | cum | 7,788.4 | ₹1,01,249.2 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
BOQ_1095207.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .