Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 00 JALESAR MAHAVIR GANJ 00 VILLAGE TOWN JALESAR CITY ETAH ETAH UTTAR PRADESH 207302 INDIA | ETAH | UTTAR PRADESH | 207302 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹32,000
Closing Date
24 Apr 2021, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE ETC I MORADABAD
220 KV S/S CAMPUS MAJHOLA MORADABAD
CARRIAGE AND ERECTION OF 100 MVA TRANSFORMER FROM 220KV SS HARDOI TO 220 KV SS RAMPUR ALONG WITH INSTALLATION OF MULSIFIRE UNDER ETD RAMPUR
2021_UPTCL_577536_1
E-T-147/ ETCM/2020-21
Open Tender
Electrical Works
Fixed-rate
90 days
RAMPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
SE ETC MORADABAD
₹32,000
15 May 2021
27 Mar 2021
24 Apr 2021
27 Mar 2021
24 Apr 2021
27 Mar 2021
90 days
Amount
The Following works are to be carried out for 220KV S/S, Rampur under ETD- Rampur.
Partly dismantling of 100 MVA T/F and its proper blanking for carriage of main tank at 220 KV Sub-Station Rampur.
Draining of complete oil from 100 MVA Transformer at 220 KV Sub-Station Hardoi into 209 ltr capacity oil drums.
Create the vacuum and filling of empty tank of Transformer with -400C due point Nitrogen at 220 KV Sub-Station Hardoi and maintaining the N2 pressure up to 220 KV Sub-Station Rampur.
Shifting of main tank of 220/132 KV 100 MVA transformer form existing place to loading place up to 20 Meters distance including turning of tank if required including all T&P and all other works required to complete the job satisfactory at 220 KV Sub-Station Hardoi.
Additional Shifting 10 Mtr. @ 5mtr/Job
Loading of 100 MVA T/F main tank along with accessories and T/F oil drums, making the wooden sleeper plate from jacking the T/F tank up to trailer height placing the rail under T/F tank and shifted up on trailer, removed the rail under T/F tank and proper tightening the main tank with trailer bad with the help of steel rope and turn buckle.
Carriage of 100 MVA T/F tank from 220 KV Sub-Station Hardoi to 220 KV Sub-Station Rampur along with all accessories and oil drums by Pvt. Truck / Trailer. Distance about 250 Km (Insurance shall be done by the contractor).
Unloading of main tank of 100 MVA Transformer loaded on Trailer jacking the tank for packing the rail under the T/F tank and shifting it of wooden to plate form, Removing the rail under the T/F tank on wooden sleeper, lowering the tank towards ground by slowly and removing the wooden sleeper under the tank at 220 KV S/S Rampur.
Shifting of main tank of 220/132 KV 100 MVA transformer form unloading place to plinth up to 20 Meters distance including turning of tank if required including all T&P and all other works required to complete the job satisfactory.
Additional Shifting 20 Mtr. @ 5mtr/Job
Replacement of old and damage gasket of 100 MVA T/F Top Cover Rim Gasket / top cover of main tank gasket HV, LV Side and Neutral Bushing with its turrets, OLTC Pipeline with all valves, Surge relay, Buchholz Relay, inspection Cover, Tap Changer, Gear Box, RPV, Radiator Header, Conservator, Oil pump and expansion joints, etc. keeping all parts safely make of good quality rubberized cork sheet Kotika /Telbroze /NU Cork make.
Filling the transformer oil in 20 KL oil tank for its centrifuging up to required BDV (centrifuging machine shall be provided by the contractor)
Complete erection of 100 MVA T/F at 220 KV S/S Rampur by erection radiators headers conservator tank HV/LV bushing all pipe lines Buchholz relay OSR PRV erection of marshaling box driving mechanism cooling fans oil pumps & all other links etc. complete in all respect & attending the oil leakage if any after putting the transformer in vacuum for 24 Hrs. & all other associated work to complete the job satisfactorily as per instruction manual or direction of the engineer.
Complete evacuation from 100 MVA transformer main tank and filling of dry air of dew point -400C or better in vacuum up to pressure of 0.25 Kg/CM2 and then again evacuating the transformer tank after required time interval (approx. 12/24 hrs.) using centrifuging machine the work shall include connecting pipe of machine as required measuring due point values of dry air after every cycle till the required value is achieved.
Creating the vacuum inside the transformer tank & Maintain it for 24 hrs. Filling the centrifuged transformer oil step by step in 100 MVA Transformer.
Centrifuging of complete transformer oil (approx. 45 KL) in transformer main tank by connecting centrifuging machine to be provided by the conservator and taking the BDV, PPM of the oil & I.R values of T/F periodically till the required value is achieved as per direction of supervising engineer (Centrifuging machine Shall be provided by the conductor free of cost.)
New Jumpring of 220/132 KV LA HV & LV bushing with zebra conductor.
Earthing of T/F body, MB, DM box OLTC, RTCC at two points using 75x10/50x6mm M.S. flat and 40 mm M.S. rod
Making of delta earthing for 100 MVA T/F consisting of fabrication of delta set with 03 Nos. 40mm/36mm dia size 03 Mtrs. Long electrodes its placing inside the ground and connecting all the three electrodes with 75x10 mm M.S flat 700 mm deep with neutral & Tertiary bushing of transformer and connecting with X & Y axis of main earth mat of sub-station
Connecting of control cables of 100 MVA Transformer with laying of cable and termination in between WTI OTI Buchholz relays PRV cooling fans pumps OLTC marshaling box RTCC panel etc. with proper ferruling as per drawing.
Loading and unloading of 25/20 KL oil tank to erection site from any sub-station wherever tank is available (within 70 Kms.) it’s proper cleaning and taking back to the S/S from where tank was brought after completion of work.
Installation of high velocity automatic water spraying system for 100 MVA T/F including lying of fire direction water pipe line valves Quartzoid, HVWS nozzles along with all material complete as per details.
Supply & installation testing commissioning of quick opening flood, deluge value of HD of 150 NB as per Max working pressure 10 Kg/cm2, as per specification (HD/Mather Platt/equivalent) (In nos.).
Supply & installation & Commissioning of gate value (sluice Valve/Butterfly valve) as per IS specification (IS Code: 14846) of (Zoloto/Kartar/Sir make) (In nos.)
Supply & installation & testing commissioning of “Y” Type strainer (Kartar/Sir/Kalpana/Agro make) of dia Max working pressure 7 Kg/cm2 (In Nos.)
Supply & laying of different size of M.S pipe B class for fire water pipe line/support as per IS specification (IS Code-1239) Complete with elbow Tee Socket reducer etc. with anti-corrosive treatment with detail as below.
Supply & laying of different size of GI pipe B class for fire detection water pipe line as per specification (IS Code-1239) as per drawing enclosed complete with elbow Tee Socket reducer.
Supply & Installation of Flanges as per IS-1538 of different size as per drawing work include proper butt welding with pipe & proper packing and coupling with Nut & Bolt.
Supply, Installation & Commissioning of high velocity water spray nozzles flow capacity 3.5 Kg./cm2 Spray core angle 900.
Supply & Installation & Commissioning of Quartzite bulb detectors (QBD) operate at 900C sensing at rated temp for actuation of the element 10-12 sec.
Supply, Installation & Testing Commissioning of fixed differential switch (Danfoss / Indfoss make) type pressure switch range 1-10 Kg cm2
Pressure gauge as per IS Specification IS Code-3624 Accuracy 5%
M/S Shilpa Enterprises
Versha and Brothers
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .