Loading…
Loading…
Tender Value
₹41.7 Cr
EMD Value
₹41.7 L
Closing Date
21 Oct 2026, 6:00 pm
Deputy Municipal Commissioner, Gandhinagar Municipal Corporation – Gandhinagar
Development Of Panchdev Temple Precinct and Corridor Development Work Of Surrounding Religious Places in GMC Area.
342695
84/2026-27
Open
Civil Works
Works
Gandhinagar
3 documents required · 3 mandatory
₹21,240
Deputy Municipal Commissioner, Gandhinagar Municipal Corporation
₹41.7 L
7 Sept 2026
7 Sept 2026
7 Sept 2026
21 Oct 2026
7 Sept 2026
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
12 2.01 SOR RA -2.01 Concrete (PCC) of grade - M15 Cum 2,966.00 4,666.60
Providing and laying in position Ready mix concrete/ batch mix concrete of
cement concrete (PCC) of grade - M15 cement concrete work, using cement
content as per approved design mix (Min cementitious level as per latest IS
shall be maintained) manufactured in fully automatic batching plant and
transported to the site of work in transit mixer for all lead having a continuous
agitated mixer, for reinforced cement concrete work including pumping from
transit mixer to site of laying; cost of admixtures in recommended proportions as
per IS: 9103 to accelerate, retard the setting of concrete, improve workability
without impairing strength and durability; finishing, compacting, vibrating, curing,
dewatering (if required), etc, including the cost of form work (if required) and
removal of formwork, dewatering (if required), etc. complete for all level, all
height/ depth and for all lead and lift and as directed by the Engineer.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
REINFORCEMENT CEMENT CONCRETE WORK
Ready mix concrete
Providing and laying in position Ready Mix concrete/Batch Mix concrete of
specified grade for reinforced cement concrete work, using cement content as
per the approved design mix (maintaining the minimum cementitious level as
per latest IS 456) manufactured in fully automatic batching plant and transported
to the site in transit mixer for all lead having a continuous agitated mixer. This
includes pumping from the transit mixer to the location on site where the
concrete is to be laid; cost of admixtures in recommended proportions as per IS:
9103 to accelerate/retard the setting of concrete, improve workability without
impairing strength and durability; finishing, compacting, vibrating, curing,
dewatering (if required), etc, excluding the cost of formwork and reinforcement,
complete for all elements, all floors, all level, any heights/depths, any lead and
lift as directed by the Engineer-in-charge.
13 2.02 5056 Concrete of M 25 grade Cum 2,745.00 5,035.97
14 2.03 5057 Concrete of M 30 grade Cum 1,241.00 5,227.97
Reinforcement for R.C.C.
Providing reinforcement for R.C.C. work including straightening, cutting,
bending, placing in position, and binding (with GI wire), all complete for all leads
and lifts, all levels, all floors, all heights/depths, etc complete, as per drawings,
specifications and as directed by the Engineer-in-charge.
No separate payment shall be made for chairs, pins, lifting hooks, spacers,
wastage, rolling margin, and binding wire.
15 2.04 05014C, 5.4.11 Thermo-Mechanically Treated bars Fe 500 D Kg 4,67,870.00 77.29
CENTERING AND SHUTTERING
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
Formwork using any type of suitable material and/ or proprietary system
Providing and fixing formwork using any type of suitable material and/or
proprietary formwork system to achieve a fair finished concrete with any shape
and any size in plan and elevation including centring, shuttering, strutting,
propping, and removal, etc. For all elements, all floors, all level, any heights/
depths, any lead and lift. The height of the propping and centring below
supporting floor to ceiling any height and removal of the same for in-situ
reinforced concrete and plain concrete work, etc complete and as directed by
the Engineer-in-charge. The area of shuttering in contact with the concrete
surface shall be measured for payment without considering any wastage.
No deductions in measurement shall be considered from the shuttering due to
the openings/ cutouts in the wall/beam. However, Nothing extra shall be paid for
forming such openings. also, in case of any type of cutouts/openings in the slab,
it shall not be measured for payment. However, Nothing extra shall be paid for
forming such openings
Where it is not specifically stated in the description of the item that formwork
shall be paid for separately, the rate of the RCC item shall be deemed to include
the cost of form work.
The measurements shall be taken separately for the following item.
16 2.05 09001AA, IN a) Form work for foundations, footings, bases of columns, sides of the raft, base Sqm 3,033.00 280.90
9.1 + PCC, Pile cap etc.
17 2.06 09001G1A, IN b) Formwork for Columns, Pillars, Piers, Abutments, Posts, Mullion and Struts Sqm 1,200.00 414.52
18 2.07 09001CA, IN c) Formwork for walls Sqm 1,494.00 342.70
9.1 RCC walls of any thickness including attached pilasters, buttresses, plinth, and
+ string courses, etc including the cost of tie bolt and heavy duty PVC pipe sleeve
09003CA, IN (above plinth), left in concrete spring coils and plastic cone assembly/ water
9.7 barrier tie rod assembly (below plinth, water retaining structures).
This includes removing the PVC cone, spring, sleeve, etc and grouting the same
with non-shrink grout/ready mix patch repair mortar for concrete, as directed by
the Engineer-in-charge. The length and diameter of the tie rod assembly shall
be as per the thickness and height of the wall. The Contractor shall get prior
approval of the tie rod assembly and water barrier.
(Horizontal/ vertical lines shall be matched for each shuttering panel).
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
19 2.08 09001B1A, IN d) Formwork for slabs including edges of slab, sloping roof, edges, suspended Sqm 1,372.00 365.88
9.1 floors, roofs, landings, balconies, shelves, chajja and access platforms etc.
20 2.09 09001H2A, IN e) Formwork for beams, lintels, sill, runner, copping, girders, plinth beams, Sqm 2,111.00 374.44
9.1 + invert beam, tie beams, bressumers and contilevers. etc.
21 2.10 09001M f) Formwork for stairs (excluding landings) except spiral-staircaces. Sqm 75.00 356.07
22 2.11 SOR RA -2.11 Exposed concrete formwork Sqm 88.00 739.07
Extra for providing and fixing formwork for exposed concrete surfaces with any
pattern (vertical or horizontal surface of any shape) to achieve the desired finish
for any element in the desired pattern and size as per the issued drawings and
specifications. This includes using any type of formwork material/suitable
proprietary formwork system (material/ system shall be approved by the
Engineer-in-charge before procurement) to achieve the desired finish as per the
approved sample for any type of RCC element including neat cleaning, grinding,
rendering the exposed concrete surface, as directed by the Engineer-in-charge.
The rate shall be applicable for all levels, all places, and all shapes and shall
include all necessary specialized centring/shuttering materials. The Contractor
shall submit a shuttering pattern/ shop drawing including tie-rod hole positions,
and Architectural grooves and cutout based on the Architectural intent with the
control line. this item shall be executed only after the shuttering pattern is
approved by the Architect and the Engineer-in-charge. The same kind of
shuttering material should be used for standard as well as residual sizes. These
areas shall be entirely free from honeycombing, stains, fins, lipping, nail or
screw marks, raised grain marks, air holes, or any other imperfections; bulging,
offsets, misalignment of the concrete and shall have an even shade, texture,
and level throughout. At the construction joints, the formwork should be tightly
fixed and securely anchored, close to the joints for seamless construction.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
Mock-ups for all exposed work to be prepared by the Contractor and approved
by the Architect before mass execution work. The Architect reserves the right to
reject part or all of the work that is substandard or not conforming to the
approved sample as per the mock up. The Contractor shall get prior approval for
the reuse of the shuttering material for repetition from the Engineer-in-charge.
The rate shall also include the cost of providing Architectural grooves of
required size and pattern in concrete work as per the issued drawing, cut-out of
any size in concrete elements as per drawing, etc in formwork.
Providing accurate and clean holes by wet drilling of specified diameter in RCC
walls, slabs, beams, or any other RCC member, and any type of Masonry
element without vibration using a core cutting (diamond drilling) machine of an
approved make for laying service lines or other purpose including scaffolding,
safety measures, disposing of debris for all lead and lift, cleaning, making good,
providing epoxy mortar/micro concrete/patch repair mortar/ nonshrink grout for
grouting the gaps around the pipes, sealing the joints around the service pipes
with suitable material at all levels and heights, after approval of the Engineer-in-
charge. Measurement shall be taken for the depth of holes in running meters for
the specified diameter. Holes shall be made by an authorized approved agency.
Scanning of reinforcement/MEP services shall be carried out before core cutting
if required and as suggested by the Engineer in charge. The location of core
cutting shall be approved by the Engineer-in-charge.
23 2.12 MRA -2.12 Core cutting - Up to 52 mm dia. Rmt 10.00 2,698.16
24 2.13 MRA -2.13 Core cutting - Beyond 52 mm dia. up to 77 mm dia. Rmt 10.00 3,167.41
25 2.14 MRA -2.14 Core cutting - Beyond 77 mm dia. up to 102 mm dia. Rmt 10.00 3,636.66
26 2.15 MRA -2.15 Core cutting - Beyond 102 mm dia. up to 152 mm dia. Rmt 10.00 4,809.77
27 2.16 MRA -2.16 Core cutting - Beyond 152 mm dia. up to 202 mm dia. Rmt 10.00 5,396.33
28 2.17 MRA -2.17 Core cutting - Beyond 202 mm dia. up to 252 mm dia. Rmt 10.00 7,156.00
TOTAL CARRIED OVER TO SUMMARY
3.00 WATERPROOFING WORK
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
1) All waterproofing treatment/work shall be executed through an approved
water-proofing agency of an approved manufacturer. The Contractor shall
submit technical data sheets for each product that will be used for execution.
2) The Contractor shall submit a methodology statement with all relevant details
in illustrative sketch form and get them approved by the Engineer-in-charge.
3) A written guarantee/bond on non-judicial stamp paper (tri-party) shall be
submitted by the main Contractor and provided by the principal manufacturer
and applicator, who has carried out the work. The guarantee/bond shall be for a
period of ten years from the certified date of completion of the overall work. The
guarantee shall be for a composite warranty against
leakages/seepage/dampness and for the satisfactory performance of the entire
waterproofing system.
4) Waterproofing shall be executed under the supervision of the technical team
of the manufacturer. Waterproofing shall be tested and approved by the
Engineer-in-charge before proceeding with subsequent activities.
5) The Contractor shall repair the concrete elements by injection grouting of
suitable non-shrink grout and other suitable methods in case of defective
concreting of retaining walls, water tanks, slabs, beams, etc., for which no extra
costs shall be payable.
6) Rate shall be inclusive of surface preparation, repairing, injection grouting,
saw cutting of construction joints and filling with patch repair mortar, making
polymer mortar/Polymer CC fillets at horizontal as well as vertical corners, etc
complete. The rate shall be inclusive of testing of elements and the system
before and after waterproofing application.
7) Rate shall be inclusive of dewatering work (pumping out and removing slush)
while execution in under water conditions.
8) The latest technical system/product shall be adopted at the time of execution.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
29 3.01 MRA -3.01 Waterproofing for Individual Foundation/Plinth beam/Pile cap/other Sqm 546.00 944.35
substructure element - Polyurethane coating
Providing and applying Liquid applied single component, pitch free PU
(Polyurethane) coating waterproofing system, to be applied to achieve a
minimum 1.2mm DFT with a required coat uniformly spread in the entire area of
isolated/combined footings/Raft Top surface/Plinth beams/Tie beams/Concrete
surface which are in touch with the soil and similar locations. The system shall
be executed as follows:
1) System includes proper surface preparation to remove loose dust, dirt, loose
mortar, curing compound etc., any deeper penetration must be removed by
mechanical means. New concrete should be allowed to cure for atleast 28 days
prior to coating. Surface preparation shall be done as per manufacturer's
specifications.
2) making fillet/provision of corner tape/sealing joints, holes using suitable
sealant and other detailing as required near all junction as per manufacturer's
3) after surface preparation, Application of water based epoxy primer shall be
applied using roller on concrete surfaces. The applied primer should be allowed
to reach tack free condition (4 to 5 hours) before applying single component PU.
PU (Poly Urethane) primer application shall be execute as per manufacturer's
recommendation.
4) After application of primer, single component PU coating shall be applied in
required coats to achieve 1.5 mm dry film thickness by using brush/roller
complete including all tools and tackles as per manufacturer’s specification. PU
waterproofing can be applied by roller, spray, or short hair brush.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
The PU (Polyurethane) coating system must deliver the following properties
1) Crack bridging of min 2 mm,
2) Elongation (ASTMD 412) – min 400 %
3) Tensile Strength (ASTM D412) min 1.5 N/mm2,
4) Recovery from Elongation (ASTM D412) min 80 %,
5) Solid Content - 85%
6)Tear Resistance (ASTM D624) – Min 15 Kn/m,
7) Shore A Hardness (ASTM D2240) Min
8) Water vapour transmission- 0.6 g/m2/hr,
9) Water Permeability @ 5 Bar (BS EN 12390)-Nil
10) Service Temperature – -40°C to 70°C, Flash Point > 70 °C, Viscosity-60p,
Specific Gravity-1.4
Cost includes all material, labour, T&P, and wastage involved to complete the
work in the item.
The Contractor shall submit a methodology statement with all details in
illustrative sketch form and get approval from the Engineer-in-charge.
Application shall be carried out by an approved applicator of the manufacturer
and as per the manufacturer's recommendation. The applied area of PU
(Polyurethane) coating as per the approved methodology (horizontal and
vertical) shall be measured for payment without any overlaps.
30 3.02 MRA -3.02 Waterproofing for RCC Raft Foundation/Below grade slab - HDPE-based Sqm 551.00 721.44
waterproofing composite sheet membrane
Providing & laying under the RCC Raft Foundation, a HDPE based
waterproofing white composite sheet membrane, at minimum 1.2mm thickness
(bare sheet thickness), when tested as per ASTM D 3767, consisting of high-
density polyethylene film/sandblasted surface, a pressure sensitive adhesive
and a trafficable weather resistant coating. The membrane shall form an
integral, adhesive, and permanent bond to poured concrete to prevent water
migration at the interface of the membrane and structural concrete and shall
include with overlaps to be treated with hot air welding technology to complete
the side laps and secure adjacent sheets. HDPE Membrane shall be applied
with the following steps and as per the manufacturer's recommendation:
1) Cleaning of PCC surface to remove dust, loose particles, etc with
compressed air or any other suitable technique depending on site conditions,
grinding any sharp edges, etc
2) HDPE membrane laid over PCC and continued over the side of the raft, the
vertical portion of the retaining wall and overlapped minimum 100 mm with
adjoining vertically applied membrane/waterproofing system for retaining
wall/vertical element(Confined/non confined RCC wall). the membrane shall be
terminated as per manufacturers specification i.e. termination over the kicker
joint, into a saw cut groove provided at an angle of 45 degrees to the vertical, to
tuck in the HDPE membrane and sealed off with a PU sealant.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
The membrane shall have the following physical properties:
1) Lateral Water Migration Resistance of at least 70 m as per ASTM D 5385, of
hydrostatic head pressure
2) An elongation of a minimum of 400% as per ASTM D
3) Tensile Strength minimum 25 MPa as per ASTM D
4) Peel strength to poured-in-place concrete after 7 days of water immersion:
>1200N/m – ASTM D
5) Lap peel adhesion minimum 800 N/m; ASTM D1876
6) The membrane shall have a puncture resistance, of not less than 890 N as
7) Water presence less than 0.1 perms as per ASTM E 96 Method B
8) Water absorption not exceeding 0.5% as per ASTM D
The Contractor shall submit a methodology statement with all details in
illustrative sketch form and get approval from the Engineer-in-charge before
commencement of work. Application shall be carried out by an approved
applicator of the manufacturer and as recommended by the manufacturer. The
actual laid area of the HDPE membrane (horizontal & vertical) shall be
measured for payment without considering overlaps.
31 3.03 MRA -3.03 Waterproofing for Retaining wall - two component Polyurea - Away from D Sqm 100.00 1,906.32
wall if any- 2-component Polyurea
Providing and applying spray applied, 2-component Polyurea over the retaining
wall on thoroughly mechanically prepared and cleaned surface to remove all
chipping and loose material and laitance by mechanical grinding, treatment of
cracks and honey combing by suitable repairing method as approved by the
Engineer-in-charge as per site conditions. Then the application of 2-component
Polyurea that shall be quick/fast setting, elastomeric waterproof, spray applied in
two coats to achieve a minimum 1.5 mm DFT by high-pressure spray
application, heated two component, spray proportioning equipment. The
proportioning equipment must be capable of supplying correct pressure and
heat for the appropriate hose length on a consistent basis. The Polyurea coating
system must deliver the following properties: Solids by Volume shall be 100%,
Tensile strength ASTM D412 >10 MPa , Tear Resistance ASTM D624C shall be
minimum 50 N/mm, Shore A Hardness (ASTM D2240) not less than
Elongation ASTM D412 > 400%, crack bridging ability of minimum 2 mm as per
ASTM C1305, and resistance to fire to std (EN 13501-1) Class E.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
Protection Board in Verticals: Providing and installing of 8 - 10 mm thick HDPE
Dimple protection boards of approved quality over the layer of Polyurea/
Polyurethane using appropriate compatible adhesive/other fixing arrangement
as per manufacturers specification to prevent any damage to the membrane
during backfilling. The protection boards are to be spot-bonded on the applied
waterproofing. After applied protection board, backfilling shall be done within
hours of applied of protection board.
The Contractor shall submit a methodology statement with all details in
illustrative sketch form and get approval from the Engineer-in-charge. The
application shall be carried out by a registered applicator of the manufacturer
and approved by the Engineer-in-charge. Cost shall include all materials, labour,
T&P, wastage, etc. as mentioned above.
The applied area of Polyurea coating as per the approved methodology
(horizontal and vertical) shall be measured for payment without any overlaps.
32 3.04 MRA -3.04 Waterproofing for balcony/ small terrace area/ sloping roof - Polyurethane Sqm 515.00 1,026.46
Providing and applying single component, elastomeric PU (Polyurethane)
coating waterproofing system, to be applied at the required consumption rate to
achieve a minimum 1.5 mm DFT as per ASTM 6889 with a required coat
(minimum 2 coats) uniformly spread in the entire area of covered/noncovered
balcony, small terrace, and similar locations including adjacent vertical surface
with minimum 300 mm. The system shall be executed as follows:
1) Surface preparation shall be done as per manufacturer's specifications
followed by single-component PU waterproof coating
2) making fillet/provision of corner tape
3) PU (Poly Urethane) primer application as per manufacturer's
recommendation is included. in case of moisture content is not as per the
requirement, water based epoxy primer shall be used as per manufacturers
specifications.
4) PU waterproofing can be applied by roller, spray, or short hair brush.
Waterproofing shall cover the entire parapet wall/wall up to a minimum of
5) Laying Geotextile (non-woven polyester) membrane in 200 GSM, with a
minimum of 100mm wide overlap and on typical locations like wall & floor
junctions, rainwater down take pipes, etc. shall be embedded between two coats
as per the manufacturer's specifications.
6) Protection screed laid to slope which shall be paid under relevant BOQ items.
7) All type of down take/RWH pipe and other services opening shall be treated
as per manufacturers specifications.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
The PU (Polyurethane) coating system must deliver the following properties:
1) Tensile Strength - minimum 2.0 Mpa as per ASTM D
2) Crack bridging capacity - minimum 1.5 mm as per ASTM C836
3) An elongation of a minimum of 400% as per ASTM D
4) Solids by Volume >85%
Cost includes all material, labour, T&P, geotextile, and wastage involved as
mentioned in the item except protection of the concrete screed.
The Contractor shall submit a methodology statement with all details in
illustrative sketch form and get approval from the Engineer-in-charge.
Application shall be carried out by an approved applicator of the manufacturer
and as per the manufacturer's recommendation. The applied area of PU
(Polyurethane) coating as per the approved methodology (horizontal and
vertical) shall be measured for payment without any overlaps.
33 3.05 MRA -3.05 Waterproofing for Toilet, Wet area, water tank, Lift pit, Small Sqm 146.00 733.21
terrace/sloping roof & Misc. areas
Providing and applying Two-part acrylic polymer modified cementitious
elastomeric waterproof coating (Without dilutation) of minimum 1.5mm thickness
DFT having minimum 1 N/mm2 tensile strength, and consumption as per
manufacturers specifications. The coating shall have an elongation of a
minimum of 120% when tested as per ASTM D 412 resisting 5 bars hydrostatic
pressure as per DIN 1048 and having crack bridging ability of up to 2mm.
Thorough surface preparation to be carried out by mechanical means to level
and plain the surface of walls and floors of the toilet areas, Wet area, water tank,
Lift pit, Small terrace & Misc. areas. All cracks and crevices shall be filled and
made good to receive waterproof coating treatment The coating shall cover all
the floor area of the wet area (toilet) and shall also be applied over the vertical
walls for a minimum of 300mm height above the floor in two or more coats to
achieve the required thickness. The periphery of the wet area shall be
additionally reinforced with an extra third coat of the coating with a Fiber band
(glass Fiber mesh of minimum 80 gsm) sandwiched between the first and the
second coat, which shall also be done around protrusions (pipes) meant for
plumbing purposes. The last coat (second/ third coat) when wet, shall be
sprinkled with clean and washed sand, to facilitate the floor screed or plaster.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
Pipe inlet / outlet treatment (at all locations)
1) The pipe shall be roughened using suitable sand-paper to get better adhesion
condition, to provide slightly rough surface for bonding.
2) Preparing the inside surface of core by roughening using suitable sand-paper
to get better adhesion prior to packing works.
3) Cleaning the surface by wire brushing followed water jet to remove any
laitance or loose flaky particles.
4) Applying a coat of Epoxy bonding agent on the pipe and core surface to
enhance adhesion between the packing material and other surface.
5) After 30 minutes of primer application, fill the core area with prepacked non-
shrink cementitious, free flow, high strength grout material of proprietary make to
seal the annular gap around pipe periphery and core cut in the wall. Before
grouting, the pipes shall be wrapped with a two-way self-adhesive tape at least
50mm wide and then grouted to fill in the grout, ensuring total watertight
plumbing fittings.
6) Curing shall be as regular practice for concrete member.
Pipes being fixed for plumbing shall be fixed in holes that are mechanically core
cut, more than the diameter of the pipes.
The Contractor shall submit a methodology statement with all details in
illustrative sketch form and get approval from the Engineer-in-charge.
Application shall be carried out by the approved applicator of the manufacturer
and as per the manufacturer's recommendation The actual applied area on the
floor & wall shall be measured for payment. Cost includes all material (for
surface preparation, coating, and hole packing), labour, T&P, and wastage
involved as mentioned in the item.
34 3.06 MRA -3.06 M25 Grade concrete screed for levelling Cum 63.00 6,104.09
Supplying and laying M25 grade vibrated concrete screed in proper slope and
gradient including saw cutting (approx. 6mm W x 30mm D) at 3m x 4m panels or
less size, making angle fillet of 50mm x 50mm at the corners using M25 grade
concrete and filling the grooves with PU sealant (minimum 20 mm depth over
PE backer rod). If Screed concrete shall be laid over on existing concrete
surface, a bonding agent shall be applied before laying of concrete. Cost
includes all material, labour, T&P, and wastage involved as mentioned in the
item. Reinforcement, if required, shall be paid under relevant agreement items.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
35 3.07 MRA -3.07 Integral crystalline admixture - RCC structures Kg 3,584.00 99.71
Providing and mixing integral crystalline admixture for waterproofing treatment
to RCC structures like basement rafts, retaining walls, sewage & water
treatment plant, tunnels/subway, etc. at the time of transporting of concrete into
the drum of the ready-mix truck/ at RMC plant as per direction of the Engineer-in-
charge, using integral crystalline admixture @ 0.80% (minimum to the weight of
cementitious content per cubic meter of concrete) or as recommended by the
manufacturer's specifications. The material shall meet the requirements as
specified in ACI-212-3R-2010 i.e. by reducing permeability of concrete by more
than 90%, compared with control concrete as per DIN 1048 and resistant to
bar hydrostatic pressure. The crystalline admixture shall be capable of self-
healing of cracks up to a width of 0.50mm. The work shall be carried out as per
specifications and the directions of the Engineer-in-charge.
36 3.08 MRA -3.08 lightweight AAC bats - filling in sunken slab Cum 30.00 3,968.36
Providing and filling lightweight AAC bats (of size 40-60 mm) with cement
mortar mixed in the ratio 1:3:6 (1 cement : 3 coarse sand: 6 block bats) including
mixing of approved waterproofing compound in recommended proportion. The
laid AAC bat mix shall be well-rammed and compacted as required. Further, the
surfaces shall be screeded with cement concrete mix 1:1.5:3 (1 cement:
coarse sand : 3 stone grit of size 6 mm and below by volume) admixed with
approved integral waterproofing compound in recommended proportion, laid to
an average thickness of 25mm and finished smooth or ready to receive finish
material as specified. Care shall be taken prior to filling all pipes passing
through the sunk portion such that the pipes are pressure tested by maintaining
pressure for 24 hours. Junctions of pipes passing through walls, and slabs shall
be well grouted and sealed.
This shall be tested by ponding water for the required depth and maintaining it
for 72 hours. (Rate includes the cost of AAC bats, cement mortar, top screed,
and labour charges for working at all levels, leads, and heights). For payment,
the area of the sunken slab and the depth of filling including the thickness of the
screed shall be measured.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
37 3.09 MRA -3.09 China Mosaic flooring Sqm 500.00 1,173.12
Providing & laying china mosaic flooring for plain and curved surfaces,
comprising of 20 to 25 mm size broken white/colour pieces of ceramic/glazed
tiles laid over 12 to 15mm thick cement mortar, 1:4 (1 cement: 4 coarse sand)
bedding including applying cement slurry at the rate of 2.75 kg per sqm on plain
or sloped surfaces with joints not exceeding 5 mm, including filling the gaps with
white cement mixture & mixing with synthetic polyester fiber, triangular in shape
having specific gravity of 1.34 to 1.40, cross-section size ranging from 10 to
micron & length up to 6mm, mixing fiber @ 125 grams per 50kg of cement in
cement mortar, including providing and mixing waterproofing material in mortar
@ 1 kg per 50 kg of cement, all complete as per the direction of the Engineer-in-
charge. The flooring shall be tampered with a wooden rammer not exceeding
Kg in weight to bring the mortar up to the surface, including rounding of the
junctions and extending them up to 150 mm. along the parapet wall. The rate
shall include bands if a different colour is used, any pattern or design as per
drawing and direction, making vata/ fillet, curing, cleaning with water and oxalic
acid, etc. complete. Only the Plan area shall be measured for payment without
considering any wastage.
38 3.10 MRA -3.10 Food-grade epoxy coating for the water tank Sqm 434.05
Providing and applying food-grade epoxy coating treatment to the water tank on
the inside surface after proper surface preparation. Food grade epoxy shall be
applied over the plastered surface with one coat of epoxy or PU primer and two
coats of Solvent-free food-grade epoxy resin coating @ 200 microns DFT in
coats, etc. complete, including all tools and tackles as per the manufacturer’s
specifications. Food grade epoxy coating shall have adhesive bond strength - >
1 Mpa, Pot life of 30 min @ 30 °C and cured film shall be non-toxic and shall
meet the requirements of IS: 9833:1981. The Contractor shall carry out the
application of polymer modified vatta/fillet at the floor-wall junctions prepared
using SBR and filling pipe cut-outs using Non-shrink cementitious grout etc. The
Contractor shall furnish 10 years warranty for the coating. The application shall
be carried out by an approved applicator of the manufacturer and as per
recommendations of the manufacturer. The actual applied area of epoxy coating
shall be measured for payment. The rate shall be inclusive of surface
preparation, fillet making, pipe cut-out filling, and epoxy coating with primer
application, but excluding plaster and waterproof coating & treatment if any
under the plaster which shall be payable under relevant agreement items.
TOTAL CARRIED OVER TO SUMMARY
4.00 MASONRY WORK
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
1) Masonry work shall be carried out for all floors, all levels, all heights, and all
places including loading, unloading, stacking, transporting, hoisting, and
erecting by any means (mechanical or manual).
2) The Contractor shall grout all cavities, and holes/gaps in the masonry with
suitable mortar as suggested by the Engineer-in-charge and making good the
required finish at no extra cost.
39 4.01 06001BA, IN Providing and laying brick masonry in the substructure, foundation & below Cum 1,136.00 4,244.85
6.12 the plinth using common burnt clay bricks conforming to IS 1077-1992, having
a compressive strength of not less than 35 kg/sq.cm in cement mortar 1:5 (1
cement: 5 coarse sand) in any shape, any thickness including finishing, curing,
scaffolding racking out the joints/ flush jointing, etc. complete for all
depths/heights, as per the issued drawings and as directed by the Engineer-in-
40 4.02 06001BA + Providing and laying brick masonry in the superstructure using common burnt Cum 247.00 4,533.57
06006B, IN clay bricks conforming to IS 1077-1992, having a compressive strength of not
6.12 less than 35 kg/sq.cm in cement mortar 1:5 (1 cement: 5 coarse sand) in any
shape, any thickness, including finishing, curing, scaffolding racking out the
joints/ flush jointing etc. complete for all levels, all floors, all heights, as per the
issued drawings and as directed by the Engineer-in-charge.
41 4.03 06008A2, IN Providing and laying half brick masonry in the superstructure using common Sqm 63.00 685.79
6.3 burnt clay building bricks, having a compressive strength of not less than
+ Kg/cm2 in cement mortar 1:4 (1- Cement: 4 -fine sand) in any shape, any
06010B thickness, including finishing, curing, scaffolding racking out the joints/ flush
jointing, etc. complete for all levels, all floors, all heights as per the issued
drawings and as directed by the Engineer-in-charge.
GLASS BRICK MASONRY WORKS
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
1) The same manufacturer is required for the different types of glass bricks from
the approved make list.
2) The Contractor shall get approval of the loose sample from the Architect
before execution.
3) The stability and water tightness of the glass brick masonry work shall be the
Contractor's responsibility.
4) The Contractor is required to submit a methodology statement for glass brick
masonry work for approval before mass execution.
5) Glass bricks shall be well packed during transportation as per the
manufacturer's specifications, to avoid damage. Damaged bricks shall not be
used for execution.
6) The gap between the glass brick masonry work and the adjacent elements
(RCC/Masonry/drywall/steel etc.) shall be filled (on both sides) with a suitable
sealant. Water ingress shall not be allowed from the joints. The Contractor is
responsible for ensuring the same.
42 4.04 MRA -4.04 Providing and fixing 190 mm (Length) x 190 mm (breadth) x 80 mm Sqm 13.00 7,007.43
(thickness) glass bricks of an approved make, shade, finish/texture, design,
and scaffolding for all levels, all floors, all heights, in true line, level and plumb
as per the issued drawings/specifications and as directed by the Engineer-in-
charge, etc and as per the following :
1) Drilling holes of required Dia in the periphery of the opening to fix 5mm GI
wire (2 no holes @ 200c/c in both directions).
2) GI wire shall be embedded in the holes and grouted with rebaring chemicals
of an approved make.
3) 2 no. GI wires shall be provided with PVC spacers (for provision of groove) in
each joint - horizontal as well as vertical.
4) Glass bricks to be fixed with suitable white/transparent adhesive of an
approved make and/or polymer-based white cement mortar 1:2 (1 white cement:
2 sand + white marble dust), in approximately 10mm thickness.
5) The glass bricks shall be fixed with the placing of GI wires vertically as well as
horizontally after passing through the spacer and having a minimum lap length
6) Joints along the periphery of the glass bricks shall be filled with weather
silicone sealant of an approved make and colour.
7) All the grooves (both sides) between the glass bricks shall be smoothly
finished with paste/putty of white cement and polymer for water tightness.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
43 4.05 MRA -4.05 Providing and fixing 190 mm (Length) x 90 mm (Width) x 80 mm (thickness) Sqm 5.00 22,184.20
glass bricks of an approved make, shade, finish/texture, design, and
scaffolding for all levels, all floors, all heights, in true line, level and plumb as per
the issued drawings/specifications and as directed by the Engineer-in-charge,
etc and as per the following:
1) Drilling holes of required Dia in the periphery of the opening to fix 5mm GI
wire (2 no holes @ 200c/c in both directions).
2) GI wire shall be embedded in the holes and grouted with rebaring chemicals
of an approved make.
3) 2 no. GI wires shall be provided with PVC spacers (for provision of groove) in
each joint - horizontal as well as vertical.
4) Glass bricks to be fixed with suitable white/transparent adhesive of an
approved make and/or polymer-based white cement mortar 1:2 (1 white cement:
2 sand + white marble dust), in approximately 10mm thickness.
5) The glass bricks shall be fixed with the placing of GI wires vertically as well as
horizontally after passing through the spacer and having a minimum lap length
6) Joints along the periphery of glass bricks shall be filled with weather silicone
sealant of an approved make and colour.
7) All the grooves (both sides) between the glass bricks shall be smoothly
finished with paste/putty of white cement and polymer for water tightness.
44 4.06 MRA -4.06 Providing and fixing 190 mm x 80 mm corner glass bricks of an approved No. 5.00 3,225.99
make, shade, finish/texture, design, and scaffolding for all levels, all floors, all
heights, in true line, level and plumb as per the issued drawings/specifications
and as directed by the Engineer-in-charge etc and as per the following:
1) Drilling holes of required Dia in the periphery of the opening to fix 5mm GI
wire (2 no holes @ 200c/c in both directions).
2) GI wire shall be embedded in the holes and grouted with rebaring chemicals
of an approved make.
3) 2 no.GI wires shall be provided with PVC spacers (for provision of groove) in
each joint - horizontal as well as vertical.
4) Glass bricks to be fixed with suitable white/ transparent adhesive of an
approved make and/or polymer-based white cement mortar 1:2 (1 white cement:
2 sand + white marble dust), in approximately 10mm thickness.
5) The glass bricks shall be fixed with the placing of GI wires vertically as well as
horizontally after passing through the spacer and having a minimum lap length
6) Joints along the periphery of the glass bricks shall be filled with weather
silicone sealant of an approved make and colour.
7) All the grooves (both sides) between the glass bricks shall be smoothly
finished with paste/putty of white cement and polymer for water tightness.
TOTAL CARRIED OVER TO SUMMARY
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
5.00 PLASTERING WORKS
1. Items for plaster works is included the Providing and fixing G.I. hexagonal
chickenmesh of size 20mm x 20mm of 22 gauge at junction of concrete and
brick work or between different materials after making "V" grove between two
different material surface and filled with rich cement mortar and @ 100mm on
each side of surfaces including necessary "U" nails/ screws/ washers with cleats
for fixing, overlaps, curing, scaffolding etc complete for all floors/ all levels/ all
heights/ all shapes as per direction of Engineer-in-charge without any extra cost.
2. Items for plaster works is included the Providing and fixing 145 GSM of
minimum 150mm wide fiberglass mesh with alkali resistant coating shall be
fixed at chasing areas of plumbing and electrical works, at corners and door and
window joints as per manufacturer's specification after making "V" grove
between two different material surface and filled with rich cement mortar and @
100mm on each side of surfaces including necessary "U" nails/ screws/ washers
with cleats for fixing, overlaps, curing, scaffolding etc complete for all floors/ all
levels/ all heights/ all shapes as per direction of Engineer-in-charge.
42 5.01 17001A 08 mm thick Cement mortar plaster Sqm 723.00 211.98
+ Providing and applying an average 08mm mm thick single coat cement plaster
17004A and finishing with a trowel, on the ceiling, side, and soffit of beam and stair, etc
+ in cement mortar 1:3 (1 cement : 3 coarse sand), in any shape, at all floors, all
17006 heights with necessary scaffolding, curing, application of bonding agent/making
grooves, forming pattas, application of bonding agent/ hacking RCC surface
properly, etc. complete as directed by the Engineer-in-charge.
43 5.02 17002A 12 - 15 mm thick plaster - cement mortar Sqm 6,433.00 236.03
+ Providing and applying 12 to 15 mm thick plaster (smooth or wire-finished
17004A plaster) of cement mortar 1:3 (1 cement : 3 coarse sand) finished with a trowel
on any type of surface. GI hexagonal chicken mesh of size 20 mm x 20 mm of
22 gauge and minimum 200 mm wide at RCC & masonry junctions or between
different materials and 145 GSM of minimum 150mm wide fiberglass mesh with
alkali resistant coating shall be fixed at chasing areas of plumbing and electrical
works, at corners and door and window joints as per manufacturer's
specifications with GI nails, hacking of concrete/application of bonding agent,
finishing, curing, making grooves, forming pattas, scaffolding in any shape for all
floors, all levels, all heights, etc. complete as directed by the Engineer-in-
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
44 5.03 17017 Average 20 mm thick plaster - cement mortar Sqm 3,313.00 286.10
Providing and applying an average 20 mm thick double coat mala plaster on any
type of internal/external surface in a backing coat of 12 mm thick cement mortar
1:5 (1 cement: 5 coarse sand) finished with a top layer of 6 mm thick cement
mortar 1:3 (1 cement: 3 sand), finished with a trowel. GI hexagonal chicken
mesh of size 20 mm x 20 mm of 22 gauge and minimum 200 mm wide at RCC
& masonry junctions or between different materials and 145 GSM of minimum
150mm wide Fiber glass mesh with alkali resistant coating shall be fixed at
chasing areas of plumbing and electrical works, at corners and door and window
joints as per manufacturer's specifications with GI nails, hacking of
concrete/application of bonding agent, finishing, curing, making grooves,
forming pattas, scaffolding in any shape for all floors, all levels, all heights etc.
complete as directed by the Engineer-in-charge. The rate shall be inclusive of
bonding agent, chicken wire mesh, glass Fiber mesh, provision of groove, drip
mould as per the issued drawings, etc. complete and as directed by the
Engineer-in-charge.
45 5.04 17002A ,17.60 15 mm thick waterproof plaster Sqm 2,570.00 193.70
(I) 17005, IN- Providing and applying an average 15 mm thick waterproof single coat smooth /
17.70 , wire finished cement plaster on sides of masonry work/block work / RCC work,
Rate=174.83+ in any shape, in CM 1:3 (1 cement : 3 fine sand) and waterproofing compound of
(48.77* an approved make in proportions recommended by the manufacturer, finishing
8.42/50) the surface wire finished / smooth finish with a floating coat of neat cement
slurry for all floors, all heights including hacking to RCC surface, scaffolding,
curing, etc. complete as directed by the Engineer-in-charge.
46 5.05 MRA -5.05 Providing and applying lime plaster in two coats having backing coat of average Sqm 845.52
20mm thick in 1:1.5:1.5 (1 Lime : 1.5 Surkhi : 1.5 Sand) and finishing coat of
mm to 10mm thick in 1:1 lime mortar (1 lime : 1 Chirodi/ quartz sand) including
mixing, adding approved additives such as guggal, methi, jaggery, molasses
etc, applying to masonry surface in all position, finishing the surface even and
smooth with lime punning, curing, scaffolding etc. complete for all level, all
height and as directed by Engineer-in-charge. Sample and mock-up shall be
approved by Architect before mass execution.
TOTAL CARRIED OVER TO SUMMARY
6.00 DOOR WINDOWS WORK
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
1. Only first class wood shall be used for any kind of woodwork. All wood (kiln
seasoned and termite treated) and wood base material shall be treated with anti-
termite treatment as per relevant IS Code before use and after installation. The
guarantee shall be furnished for 10 years in the prescribed format as directed by
the Engineer-in-charge.
2. Plywood (BWP grade IS – 710), laminate or other composite wood-based
products shall be free of urea formaldehyde.
3. All veneer, and wood shall be FSC (Forest Stewardship Council) & Green
Guard Certified.
4. All loose samples of materials shall be approved by the Engineer-in-charge.
5. All adhesives and sealants shall be with low VOC and lead-free with
acceptable VOC content as per GRIHA requirements.
6. The Contractor shall prepare a shop drawing based on the Design Intent /
Concept Drawings and get approval from the Engineer-in-Charge. The
Contractor shall prepare mock-up of doors, windows, and other elements with
all required hardware and get approval from the Engineer-in-Charge before
execution of work. Work shall be carried out as per the final approved shop
drawing and approved mock-up. The Contractor shall be responsible against
stability, safety, leakage, etc all complete. Testing work shall be carried out by
the Contractor as suggested by the Engineer-in-charge. (If required).
7. All types of locks shall be with computerized 3 No. keys (SS 304/ brass) and
master keys (if mentioned in the nomenclature of the item). The grouping of
master keys shall be as suggested by the Engineer-in-Charge. Nothing extra
shall be payable for the master key provision.
8. Glass for external doors and windows shall be with desired parameters as per
Green Building requirements.
9. The Contractor shall provide test certification for all fire-rated items.
10. Contractor shall make provision for access control system and other
mechanical/automation devices, coordinate with other services, and make good,
11. All doors, windows, and other elements shall be fabricated and finished at
the factory/workshop, and only fixing and final finishing shall be executed at the
site unless otherwise approved by the Engineer-in-charge.
12. Work for doors, windows, and other elements shall be carried out for all
floors, all levels, all heights, and all places including loading, unloading,
stacking, transporting, hoisting, and erecting by any means (mechanical or
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
13. All silicone sealant shall be grey in colour or as directed by the Engineer-in-
14. For DGU glass, silicone, tape, and spacer shall be grey in colour or as
directed by the Engineer-in-charge.
15. All types of coating (polyester powder coating, anodizing and PVDF coating
for aluminium work shall have minimum 15 years of life).
46 6.01 SOR RA -6.01 Teak wood frames for doors/windows etc. Cum 2.00 2,85,117.14
Providing and fixing frames for doors, windows, transoms, louvers and
ventilators, jambs, sills, jambs, palmet, skirting, hand rail for railing, wooden
band, and any type of interior work, using best quality selected kiln seasoned,
termite treated first-class teak wood including double grooves on both sides and
having single or double rebates for frames-shutter, mouldings, smoothening,
sand papering, making the edges moulding, making beveled edging as per
drawinand fixed in position with hold fast lugs or with dash fasteners with
required dia. & length of an approved make, adhesive, and necessary
consumable hardware etc. for all levels, all floors, all heights, etc as per the
issued drawing and as directed by the Engineer-in-charge.
The rate shall be inclusive of all types of consumables, accessories, fasteners,
and any type of corner treatment (i.e. chamfering, pencil corner, bevelling,
moulding, etc.). Polishing, hardware, and carving work shall be paid as per
relevant Tender items, however Rate shall be inclusive of black bituminous paint
on hidden or inside framing of teak wood (if specified).
The Contractor shall get the approval for the loose sample of first-class teak
wood along with its source location from the Engineer-in-charge before
47 6.02 SOR RA -6.02 45 mm thick fabricated flush door shutter Sqm 7,296.24
Providing and fixing door shutter made out of fabricated hollow flush type
laminated/veneer finished approximate 45mm thick flush door shutter (single
leaf/double leaf) of any size for all levels, all floors, all heights made out as
1) Shutter framing/Internal framing (stile, rail members, battens) shall be made
out of first-class, best quality kiln seasoned, termite-treated teak wood with
thickness and width as per the issued drawing as shutter frame/internal framing.
2) 9 mm thick plywood conforming to IS: 710 fixed on both sides of the shutter
framing/internal wooden frame.
3) Both sides of the shutter shall be finished with veneer/laminate of approved
shade and make. However, the veneer/laminate shall be paid as per relevant
4) All types of exposed wood and veneer shall be finished with PU polishing
5) Necessary door shutter hardware shall be paid as per relevant Tender items.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
The rate shall be inclusive of all the teak wood members for the shutter frame,
internal framing and beadings, 9mm thick ply on both sides, necessary anchor
fasteners, sheet metal screws, nails, adhesives, accessories, and necessary
consumables with all labour, Architectural mouldings, sandpapering, edge
moulding, groove provisions, PU polishing on wooden members, etc complete
for all heights, all floors and all levels as per the issued drawing, design &
direction by the Engineer-in-charge. The Contractor shall get the approval for
the loose sample of first-class teak wood along with its source location from the
Engineer-in-charge before execution. Contractor shall prepare shop drawings
based on the concept design/drawings and get approval from the Engineer-in-
charge before mass execution. Based on the approved shop drawing, the
Contractor shall prepare a mock-up of the door for approval. The stability of the
door is the responsibility of the Contractor.
The out-to-out area (one side) of the fabricated flush door shutter (without door
frame) shall be measured for payment. No wastage shall be measured for
48 6.03 SOR RA -6.03 Aluminium work for door/window/louvers/ventilators etc. frame and Kg 1,881.00 461.57
Providing and fixing in position frames/ shutter for any type of aluminium work
like aluminium door, composite door-window, window (sliding, openable, side
hung, top hung, fixed etc.), aluminium partition, aluminium fixed louvers, fixed
window with any type of aluminium sections of approved make and finished with
minimum 50 micron pure polyester powder coating of approved shade, texture &
colour of approved make for all floors/ all levels/ all heights/ all shapes/ all sizes
including cutting, bending, crimping, fabricating in best workmanship manner etc
as per the drawing, and as directed by Engineer-in-Charge.
Rate shall be inclusive of providing any type of aluminium sections, cutting,
fabrication, hoisting and fixing.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
1) Sheet metal screws and casted solid aluminium corner cleats fixed with a
spring for rapid and secure joint assembly for any type of shutter and frame;
2) Glazing clips for receiving infill panel;
3) Best quality wool pile where ever shutter touches the frame and compatible
microwave cured EPDM rubber;
4) Dash Anchor fasteners of approved make and capacity for fixing the frame
assembly to the RCC or masonry surfaces. Minimum 1 anchor fastener shall be
used for every 600 mm length of section for stability of frame.
5) 10mm GI tie rod for connecting vertical stile at top and bottom for aluminium
door shutter and 4mm thick solid aluminium corner cleat of full thickness of
section for connecting stile and horizontal rails;
6) providing and fixing packing at every 600mm c/c of PVC shims of required
7) Filling the gap between wall and frame on both sides (outside and inside) with
polyethylene baker rod of avg. 10 mm Dia of approved make or rough ground
and colour and then sealing the remaining gap with neutral grade weather
silicon sealant of approved make and colour.
8) Termite treated seasoned teak wood as infill material to install hardware in
door shutter and frame as and when required
9) if required necessary tuflon roller for sliding window and aluminium hardware
rate are including.
but excluding. 1) necessary hardware (except aluminium); 2) Glazing or
panelling material and shutter.
Contractor shall prepare shop drawing and get approved from the Engineer in
charge before procurement of material. All loose samples shall be approved.
Work shall carried out as per the approved shop drawings and approved
Actual weight of installed Aluminium sections which are used shall be measured
for the payment. Contractor shall be responsible for stability, water tightness of
door window work.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
49 6.04 MRA -6.04 Flush Door - 35mm thickness Sqm 5.00 2,432.28
Providing and fixing door shutter made out of factory-made and pressed
laminated/veneer finish 35mm thick (without finish) flush door shutter, made of
ISI marked non-decorative type flush door shutters conforming to IS:2202 (Part
I), the core of block board construction with the frame of 1st class hardwood,
pine filler and well matched commercial 3 ply veneer with vertical grains or cross
bands and face veneers on both faces of shutters having laminates/veneer of an
approved make, shade, finish (which would be paid separately) as approved by
the Engineer-in-charge on both faces of the shutter fixed with phenol
formaldehyde synthetic resin type adhesive conforming to IS 848, including
providing and fixing 6mm thick peripheral external lipping made out of first class
teak wood, on all edges of the door shutter with PU polishing on all exposed
faces of lipping including fixing shutters etc complete for all levels, all floors, all
heights as per the issued drawings and as directed by the Engineer-in-charge.
Incase of vision panel of required size, shape and thickness is required to fixed
in flush door shutter, the rate shall be included the cost of making the opening in
the door as per requirement, provision of specified glass, first class teak wood
beading on both sides, extra batten supports as required around the periphery of
the opening, cost of PU polishing on beading, etc complete for all levels, all
floors, all heights, however glass shall be paid in relevent tender item.
The rate shall be inclusive of flush door shutter, teak wood lipping with PU
polish, necessary consumables ,provision of hardware, accessories, etc but
excluding the cost of veneer/laminates, all required hardware, and polishing on
veneer, vision panel etc complete as per the issued drawing, design & direction
of the Engineer-in-charge. The out-to-out area (one side) of the flush door
shutter shall be measured for payment.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
50 6.05 MRA -6.05 Flush Door - 40 mm thickness Sqm 42.00 2,979.05
Providing and fixing door shutter made out of factory-made and pressed
laminated/veneer finish 40mm thick (without finish) flush door shutter, made of
ISI marked non-decorative type flush door shutters conforming to IS:2202 (Part
I), the core of block board construction with the frame of 1st class hardwood,
pine filler and well matched commercial 3 ply veneer with vertical grains or cross
bands and face veneers on both faces of shutters having laminates/veneer of an
approved make, shade, finish (which would be paid separately) as approved by
the Engineer-in-charge on both faces of the shutter fixed with phenol
formaldehyde synthetic resin type adhesive conforming to IS 848, including
providing and fixing 6mm thick peripheral external lipping made out of first class
teak wood, on all edges of the door shutter with PU polishing on all exposed
faces of lipping including fixing shutters etc complete for all levels, all floors, all
heights as per the issued drawings and as directed by the Engineer-in-charge.
Incase of vision panel of required size, shape and thickness is required to fixed
in flush door shutter, the rate shall be included the cost of making the opening in
the door as per requirement, provision of specified glass, first class teak wood
beading on both sides, extra batten supports as required around the periphery of
the opening, cost of PU polishing on beading, etc complete for all levels, all
floors, all heights, however glass shall be paid in relevent tender item.
The rate shall be inclusive of flush door shutter, teak wood lipping with PU
polish, necessary consumables ,provision of hardware, accessories, etc but
excluding the cost of veneer/laminates, all required hardware, and polishing on
veneer, vision panel etc complete as per the issued drawing, design & direction
of the Engineer-in-charge. The out-to-out area (one side) of the flush door
shutter shall be measured for payment.
51 6.06 MRA -6.06 4 mm thick decorative veneer Sqm 17.00 1,162.61
Providing and fixing 4 mm thick decorative veneer (factory pressed with door
shutter or plywood for interior work) conforming to IS: 1328 (type-1) having the
top layer of minimum 0.3 mm slice thickness of wood and base layer of 3.5 mm
thick BWP Gurjan Ply of an approved make, shade and pattern/ texture, for plain
lining/cladding/ceiling work, on flush door shutter, pelmet or any interior work in
any design, any pattern, any shape, etc with necessary screws, adhesive
including priming coat on the unexposed surface. The veneer shall be fixed on
the ply with or without grooves as per the issued drawing. If required,
perforations shall be executed as per the issued drawing (on ply+ veneer
surface) and paid separately under relevant Tender items. The actual installed
area of the veneer shall be measured for payment.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
52 6.07 MRA -6.07 1 mm thick laminate Sqm 83.00 675.69
Providing & Fixing 1 mm thick high pressure (factory pressed) laminate sheet of
any type, any finish, any shade, any texture of approved make and shade with
high-density protective surface layer and reverse side of adhesive bonding
quality conforming to IS: 2046 Type S, including cost of adhesive of approved
quality. Laminate shall be applied on the door shutter, wall paneling, ceiling, or
any interior work, etc. The sample shall be approved by the Engineer-in-charge.
The actual installed area of the laminate shall be measured for payment.
53 6.08 MRA -6.08 Aluminium Operable system Louver Sqm 5.00 26,132.29
Providing and fixing aluminium operable system (hand-operated) louvers for
door/window/opening sizes as per issued drawings of an approved make,
having 50-micron polyester powder coating of approved shade & colour and
texture including operating mechanism louver frame with gasket and piles. The
corner joints of the frame shall be made at 45 degrees using die-cast solid
aluminium corner cleats fixed with a spring for rapid and secure joint assembly.
Gaskets shall be of micro waved EPDM material. Work shall be carried out in
the door/window frame as per the sample approved by the architect and
Engineer-in-charge. The operating panel shall be provided as per the issued
drawing. the out-to-out dimension of the operable louver system shall be
measured for payment. The rate shall be inclusive of the aluminium frame for
the louver operating system. The sample/mock-up shall be by contractor
approved before the execution of the work based on the approved shop
drawing. Work shall be carried out as per the approved shop drawing, and
approved sample/mock-up.
54 6.09 MRA -6.09 SS Mosquito net Sqm 5.00 849.66
Providing and fixing fly-proof stainless steel net/mesh of grade 304 made out of
wire gauge with 0.5 mm dia. wire and 1.4mm wide aperture in any type of door,
window, ventilation frame or shutter, behind louvers etc (openable or fixed) as
per the issued drawing with matching first class teak wood beading/aluminium
beading with required screws, nails, fasteners, etc. complete for all floors, all
levels, all heights and as directed by the Engineer-in-charge. The rate shall be
inclusive of SS mesh, with all required accessories but excluding the cost of
aluminium work, wooden work, hardware and polish work in case of openable
shutter. The installed area shall be measured for payment without considering
any wastage. The sample shall be approved before the execution of the work.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
55 6.10 MRA -6.10 6mm thick compact sheet Sqm 11.00 1,573.78
Providing and fixing laminated 6mm thick compact sheet in the aluminium frame
and shutter work of the doors, windows, partitions, etc; as per issued drawing
with the necessary cutting of sheet in any size, any pattern and fixed with
gasket i.e. EPDM rubber/neoprene/gasket/silicon sealant/ adhesive
tape/screwingas per requirement, etc complete for all levels, all floors, all
heights as per the issued drawings and directions of the Engineer-in-charge. the
compact sheet shall be of any shade, any size, any shape, any colour (single
side/ double side), any texture as per the approved make, sample, and drawing.
Cut edges of the compact sheet shall be provided with masking tape. The
installed area shall be measured for payment without considering any wastage.
The sample shall be approved before the execution of the work.
Providing and fixing glass in the any type of door, window, ventilation, fixed
glazing, partitions, or any other elements and for interior/external design
element, etc. for all levels, all floors, all heights with EPDM rubber/neoprene
gaske, approved suitable seleant as per manufacturers specifications, etc.
complete as per the issued drawings and directions of the Engineer-in-charge.
(Cost of beading shall be covered under basic item unless anywhere specified).
Glass shall be of any shade, any size, any shape of approved make as per
issued drawing and confirm to IS:2835 or IS:2553. The sample shall be
approved before execution of the work. wherever required, both side/single side
bevelled edge glass as per design intent shall be included in this item. The
installed area shall be measured for payment without considering any wastage.
56 6.11 MRA -6.11 b) With clear toughened glass panes of 8.0 mm thickness Sqm 73.00 2,124.13
57 6.12 MRA -6.12 c) With clear toughened glass panes of 12.0 mm thickness Sqm 6.00 2,678.42
58 6.13 MRA -6.13 Extra for providing frosting/etching on glass of any thickness in any pattern Sqm 5.00 369.51
for all levels, all floors, all heights as per the approved sample. Frosted/etched
area of glass shall be measured for payment.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
Providing and fixing double action hydraulic floor spring of an approved make
with SS 304 cover plate having SS matt/ brush finish (with outer box) &
adjustable concealed cast top pivot (two-piece), bottom strap, with back check,
adjustable closing speed, and hold open function, with a minimum one-year
guarantee for any type of door of specified capacity for all levels, all floors, and
all heights. The rate shall be inclusive of cutting of floor neatly, fixing the floor
spring, grouting, cleaning, polishing the floor and maintaining it in good working
condition. In the case of an aluminium shutter, the bottom arm of the floor spring
& the top pivot shall be firmly fixed to the aluminium members using required
sized teak wood by making a rebate in the wood which is included in this item.
Selection of floor spring shall be as per the size and weight of the door, as per
the manufacturer's recommendation, and as directed by the Engineer-in-charge.
The Contractor shall arrange loose samples for approval from the Engineer-in-
Charge before mass execution.
59 6.14 MRA-64 a) Floor spring for any type of door with cover plate and extended spindle to hide No. 4.00 13,776.96
the floor spring cover plate. Closing force complying with EN 1154 2 - 5, as per
the manufacturer's specifications, and/or compatible with the shutter weight.
Cam action door closer
Providing and fixing cam action door closer of an approved make with a
minimum one-year guarantee and approved finish for all levels, all floors, and all
heights, with controlled adjustable closing and latching speed, with hold open
feature and power-adjustable, with track arm with screws to any type of door for
specified door width. All adjustment screws to be face fixed. The rate shall be
inclusive of fixing using the template as per the manufacturer’s specifications
and maintaining it in good working condition. The door closer shall conform to
EN 1154 standard. Selection of the door closer shall be as per the size and
weight of the door, as per manufacturer's recommendation and as directed by
the Engineer-in-charge. The Contractor shall arrange loose samples for
approval from the Engineer-in-Charge before mass procurement and execution.
60 6.15 MRA-67 a) Shutter mounted door closer (with back check) conforming to EN 2-4 for any No. 2.00 6,575.40
type of the door, as per the manufacturer's specifications, and/or compatible
with the shutter weight.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
SS 304 Butt hinges
Providing and fixing SS 304 butt hinges in matt stainless steel finish of specified
size of an approved make for all levels, all floors, and all heights for any type of
door, with required SS 304 screws, etc. complete. The rate shall be inclusive of
fixing as per the manufacturer’s specifications and maintaining it in good
working condition. The Contractor shall arrange loose samples for approval from
the Engineer-in-Charge before procurement and execution.
61 6.16 MRA-70 b) 100 x 75 x 3 mm - With ball bearing No. 108.00 331.28
62 6.17 MRA-71 SS 304 Pivot hinge Set 2.00 1,211.70
Providing and fixing SS 304 grade pivot hinge in satin stainless steel matt finish
of required size and capacity of an approved make for all levels, all floors, and
all heights for any type of door, with required SS 304 screws, etc. complete. The
rate shall be inclusive of fixing as per the manufacturer’s specifications and
maintaining it in good working condition. The Contractor shall arrange loose
samples for approval from the Engineer-in-Charge before mass execution.
63 6.18 MRA-72 Mortise Deadlock for single/double door shutter Set 1.00 2,941.22
Providing and fixing a set of mortise deadlock (without latch) for single/double
shutter door, including strike plate SS 304, and prepared for 60/70 mm length of
standard Euro profile pin cylinder as per DIN 18251-1, grade 2 of an approved
make with both side key, one side key/one side knob, one side key/slot
operation with pair of SS 304 matt finish escutcheons (keyhole plate) in any
approved shape for any type of doors with necessary SS 304 screws, etc
complete as per the issued drawing and as directed by the Engineer-in-charge.
The rate shall be for all heights, all floors, and all places. The lock shall have
number computerized keys. The Contractor shall arrange loose samples for
approval from the Engineer-in-Charge before mass procurement and execution.
64 6.19 MRA-76 Shaft door lock No. 1.00 674.58
Providing and fixing shaft door lock with key (Alen Key lock) with escutcheons
(keyhole plate), strike plate, locking sleeve, etc in stainless steel matt finish of
an approved make in any approved shape/size for any type of doors with
necessary SS 304 screws, etc complete as per the issued drawing and as
directed by the Engineer-in-charge. The rate shall be for all heights, all floors,
and all places. The Contractor shall arrange loose samples for approval from
the Engineer-in-Charge before mass procurement and execution.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
SS 304 Grade Push-Pull handle
Providing and fixing SS 304 grade push-pull pair of handles in matt finish of
specified size, specified shape i.e. H-shape/D-shape/offset shape (dent free at
the bending point) for door, window, etc. of an approved make for all levels, all
floors, and all heights for any type of door, with required SS 304 screws,
accessories, and pin of the required size for fixing, etc. complete. The rate shall
be inclusive of fixing as per the manufacturer’s specifications and maintaining it
in good working condition. The Contractor shall arrange loose samples for
approval from the Engineer-in-Charge before mass procurement and execution.
Elevation length shall be considered for length of handle.
65 6.20 MRA-78 b) 300 mm long, pipe of size 22mm Dia x 1mm (thickness of pipe) Pair 2.00 1,708.11
66 6.21 MRA-80 d) 600 mm long, pipe of size 30mm Dia x 1mm (thickness of pipe) Pair 2.00 2,925.87
Providing and fixing SS 304 grade handle in matt finish of specified size,
specified shape for door, window, etc. of an approved make for all levels, all
floors, and all heights for any type of door, with required SS 304 screws,
accessories, and pin of the required size for fixing, etc. complete. The rate shall
be inclusive of fixing as per the manufacturer’s specifications and maintaining it
in good working condition. The Contractor shall arrange loose samples for
approval from the Engineer-in-Charge before mass execution.
67 6.22 MRA-81 a) Pull handle - 150 mm long, 15mm Dia/wide x 1mm thick No. 38.00 1,357.39
68 6.23 MRA-82 b) Flush handle/ concealed handle - 150 mm long Flush Handle - Concealed No. 18.00 448.19
handle recessed in the depth of the shutter with pull arrangement for shutter, as
per approved design and shape
SS 304 Tower bolt
Providing and fixing SS 304 grade tower bolts in matt finish of specified size,
and specified shape (with or without flap) for doors, windows, transom, etc. of an
approved make for all levels, all floors, and all heights for any type of door, with
required SS 304 screws and accessories of the required size for fixing, etc.
complete. The rate shall be inclusive of fixing as per the manufacturer’s
specifications and maintaining it in good working condition. The Contractor shall
arrange loose samples for approval from the Engineer-in-Charge before mass
procurement and execution.
69 6.24 MRA-85 b) 300 mm x 10 mm rod size No. 19.00 587.72
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
70 6.25 MRA-88 SS 304 door stopper No. 19.00 307.34
Providing and fixing SS 304 door stopper in matt finish with or without magnet,
lever type, shutter mounted/wall mounted/floor mounted of approved make,
type, size as per requirement etc. for all levels, all floors, and all heights for any
type of door, with required SS 304 screws and accessories of the required size
for fixing, etc. complete. The rate shall be inclusive of fixing as per the
manufacturer’s specifications and maintaining it in good working condition. The
Contractor shall arrange loose samples for approval from the Engineer-in-
Charge before mass procurement and execution.
71 6.26 MRA-88 SS 304 Aldrops No. 19.00 307.34
Providing and Fixing SS 304 Grade matt Finish 1.8 mm Thickness Aldrops of
mm Dia x 300 mm including 3 nos. fixing Bracket and 1 no. locking bracket of
approved make with necessary MS Nickle Plating Bolts etc. complete for all
floor, all height, all level as directed by engineer in charge. with required SS
screws, and accessories of the required size for fixing, etc. complete. The rate
shall be inclusive of fixing as per manufacturer’s specification & maintaining it in
good working condition. The contractor shall arrange loose Samples for
approval from the Engineer-in-Charge before mass procurement and execution.
TOTAL CARRIED OVER TO SUMMARY
7.00 FLOORING AND DADO/CLADDING WORKS
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
1) All natural stones shall be free from cracks, lines, stains, and efflorescence
spots, and even in shade for all kinds of stonework.
2) All natural stones shall be selected and sorted for uniform colour, figure, and
thickness and approved by the Engineer-in-Charge prior to procurement.
3) All natural stones shall be from the same lot and/or source (stone quarry) for
the same kind of work to avoid shade variation and as approved by the
Engineer-in-Charge.
4) All types of loose and laid samples of flooring shall be approved by the
Engineer-in-Charge.
5) The Contractor shall apply an approved Stone Impregnation primer/sealer
coat on both sides and all edges (after cutting and finishing the stone as per
size) of stones, a minimum of two coats as per the manufacturer's specifications
and as directed by the Engineer-in-Charge. No extra payment shall be made for
6) The Contractor shall co-ordinate and execute for all services in the flooring
and wall lining/cladding work i.e. making openings/cut-outs for any services (i.e.
elevator operating panel in the lift wall cladding, raceways in flooring, junction
boxes, etc), and making good as per the satisfaction of the Engineer-in-Charge.
7) All stones shall be cut to size by water jet cutting/laser cutting/ CNC machine
according to the design and shape for the best workmanship etc, according to
the design and as per the approved shop drawing.
8) All adhesives and sealants shall be compatible with the material as per IS
15477 and as per the manufacturer's specifications and lead-free with
acceptable VOC content as per Green buildings requirements.
9) The finished floor surfaces shall be protected with 12mm thick POP sheets
over LDPE sheets up to the handling over of the Project. The treads of the stairs
shall be protected with a metal/plywood angle to avoid damage to the edges of
the treads. POP shall not directly (or with the use of paper) be applied on the
10) The screed below the flooring/base mortar thickness shall be as per the
drawing. In case of any type of stone/tile, it shall be fixed with an adhesive and
the total thickness of base mortar/screed shall be paid as per relevant Tender
11) All stones shall be factory cut and factory finished. Polish or any type of
texture finish on any stones shall be as per the satisfaction of the Engineer-in-
12) Flooring and wall cladding/lining work shall be carried out for all floors, all
levels, all heights, and all places.
13) The rate shall be inclusive of all types of wastage for all materials.
GRANITE FLOORING
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
7.01 Granite stones - for flooring - fixing with adhesive
Providing and laying granite stones of specified thickness, specified finish, any
shade (uniform), any size, and any shape for flooring, Otta, sill, trades of steps,
copping, seating or other similar elements in the required design and patterns as
per the drawings, laid over existing bedding (cement mortar bedding/concrete
screed), fixed with minimum 6mm thick stone fixing adhesive as per IS-15477 of
an approved make and joined with grooves or without grooves, with grey/white
cement slurry mixed with a pigment to match the shade of the slabs, including
finishing, rubbing, curing, polishing, cleaning, protection, scaffolding, wastage,
etc., all complete, for all levels, all floors, all heights, as directed by the Engineer-
in-Charge. Granite stone slabs to have pencil corners/rounded edge, bull nose
edge or other approved edge and polished at the all exposed edges in even and
uniform thickness. The joints between the treads and the risers shall be finished
as per the drawing. the granite shall be in single peice for any size (up to 2 m
length, width as per design intent) as per design intent.
The rate shall be inclusive of granite (as per the approved sample), adhesive for
fixing, cement slurry, matching pigment, all labour, etc. complete, but excluding
cement mortar bedding/concrete screed bedding and filling with epoxy grout (if
required, as per the drawing) which shall be payable under the relevant Tender
items. The Contractor shall arrange loose samples for approval from the
Engineer-in-Charge before mass execution.
The actual laid area of the Granite stone shall be measured for payment without
considering any wastage.
72 7.01.1 MRA -7.01.1 18 mm thick polished granite flooring Sqm 217.00 3,070.40
73 7.01.2 MRA -7.01.2 18 mm thick any type of textured finish granite flooring i.e. river washed, leather Sqm 100.00 2,635.65
finish, linen finish, lappato finish, or similar finish
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
7.02 Granite stone - for skirting - fixing with adhesive
Providing and laying granite stones of specified thickness, specified finish, of
any shade (uniform), any size, and any shape for skirting (flush with plaster or
adjoining surface) as per the drawings, laid in any pattern, fixed on any type of
levelled surface with minimum 6mm thick stone fixing adhesive as per IS-15477
of an approved make and joined with grooves or without grooves with grey/white
cement slurry mixed with a pigment to match the shade of the slabs, including
providing 6 to 10mm wide grooves between the skirting and the plaster,
finishing, rubbing, curing, polishing, cleaning, protection, scaffolding, wastage,
etc. all complete, for all levels, all floors, all heights, and as directed by the
Engineer-in-Charge. The length of stones for skirting shall be as per the design
to match the joints and pattern. The shade of the skirting must match with the
flooring stone.
The rate shall be inclusive of granite (as per the approved sample), adhesive for
fixing, cement slurry, matching pigment, all labour, etc complete, but excluding
filling with epoxy grout in the grooves (if required as per the drawing) which shall
be payable under the relevant Tender items. The Contractor shall arrange loose
samples for approval from the Engineer-in-Charge before mass execution.
The actual laid area of the granite stones shall be measured for payment without
considering any wastage.
74 7.02.1 MRA -7.02.1 08 - 10 mm thick polished granite stones Sqm 33.00 2,230.43
75 7.02.2 MRA -7.02.2 08 - 10 mm thick any type of textured finish granite stones, i.e. river washed, Sqm 10.00 2,294.92
leather finish, linen finish, lappato finish, or similar finish
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
7.03 Granite stones - for dado/cladding/riser of steps - fixing with adhesive
Providing and laying granite stones of specified thickness, specified finish, of
any shade (uniform), any size, and any shape for cladding, dado, pillars, wall
lining, riser of the steps, jambs etc. as per the drawings, laid in any pattern,
Granite stone slabs to have pencil corners and polished at the exposed edge in
even and uniform thickness and laid in any pattern, fixed on any type of levelled
surface with minimum 6mm thick stone fixing adhesive as per IS-15477 of an
approved, make and joined with grooves or without grooves, with grey/white
cement slurry mixed with a pigment to match the shade of the slabs, including
finishing, rubbing, cleaning, protection, scaffolding, wastage, curing and
polishing, etc. all complete, for all levels, all floors, all heights, and as directed
by the Engineer-in-Charge. The length/width of stones for the dado shall be as
per the design to match the joint and pattern of the flooring as per the drawing.
The exposed edges of the granite stones shall be pencil-cornered and polished
the same as the slab.
The rate shall be inclusive of granite (as per the approved sample), adhesive for
fixing, cement slurry, matching pigment, all labour, etc. all complete, but
excluding cement mortar plaster/backing coat and filling with epoxy grout (if
required as per the drawing) which shall be payable under relevant Tender
items. The Contractor shall arrange loose samples for approval from the
Engineer-in-Charge before mass execution. The granite shall be in single peice
for any size (up to 2 m length, width as per design intent) as per design intent.
The actual laid area of the granite stones shall be measured for payment without
considering any wastage.
76 7.03.1 MRA -7.03.1 18 mm thick polished granite stones Sqm 50.00 2,908.80
AMBAJI MARBLE FLOORING
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
Marble - polished finish - for flooring - fixing with adhesive
Providing and laying machine-cut superior quality polished marble stone of
specified thickness, specified finish, in any shade (uniform), any size, and any
shape for flooring in required design and patterns as per the drawings, laid
over existing bedding (white cement mortar bedding and concrete screed),
fixed with minimum 6mm thick high performance, polymer modified, non-slip,
compatible white adhesive (IS-15477) of an approved make, and joined (paper
joint) with white cement and matching pigment including rubbing, curing,
cleaning and polishing, protection, scaffolding, wastage, etc., all complete, for
all levels, all floor, all height, as specified and as directed by the Engineer-in-
The marble shall be laid in the required pattern to match the natural grains and
as per the design intent. Exposed edge of marble stone shall be with pencil
cornered and polished same as slab.
The rate shall be inclusive of marble stone (as per the approved sample),
adhesive for fixing, white cement slurry, matching pigment, all labour, etc
complete but excluding white cement mortar bedding and concrete screed
bedding which shall be payable under the relevant Tender items.
No part of grey cement surface should come in contact with the Marble. any type
of impressions, stain or other cloud patches or other deformities shall be allowed
after laying, so suitable adhesive and appropriate laying method shall be
adopted, and if in case of such deformities, all executed work to be redone
without any extra cost.
The contractor shall arrange loose Samples for approval from the Engineer-in-
Charge before mass execution.
The actual laid area of the Marble stone shall be measured for payment without
considering any wastage.
Any impression on natural stone after laying due to any means i.e. Fixing
mortar/adhesive shall not be acceptable. If such case, whole work to be redone
without any extra cost.
77 7.04 MRA -7.04 30 mm thick Ambaji polished marble (pure white, superior quality, without Sqm 779.00 25,422.56
patches or clouds of any shade)
KOTA STONE FLOORING
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
7.05 Kota stones - for flooring - fixing with adhesive
Providing and laying machine-cut Kota stones of specified thickness, specified
finish, any shade (uniform), any size, and any shape for flooring, Otta, sill, trades
of steps, riser, copping, seating or other similar elements in required design and
patterns as per the drawings, laid over existing bedding (cement mortar
bedding/concrete screed), fixed with minimum 6mm thick stone fixing adhesive
as per IS-15477 of an approved make and joined (paper joint) with grey/white
cement slurry mixed with a pigment to match the shade of the slabs, including
finishing, rubbing, curing, polishing, cleaning, protection, scaffolding, wastage,
etc. all complete, for all levels, all floors, all heights, as directed by the Engineer-
The rate shall be inclusive of Kota stones (as per the approved sample),
adhesive for fixing, cement slurry, matching pigment, all labour, etc complete,
but excluding cement mortar bedding/concrete screed bedding which shall be
payable under the relevant Tender items. The Contractor shall arrange loose
samples for approval from the Engineer-in-Charge before mass execution. The
joints between the treads and the risers shall be finished as per the drawing. the
kotastone shall be in single peice for any size (up to 1.5 m length, width as per
design intent) as per design intent. kotastone slabs to have pencil
corners/rounded edge, bull nose edge or other approved edge and polished at
the all exposed edges in even and uniform thickness.
The actual laid area of the Kota stones shall be measured for payment without
considering any wastage.
77 7.05.1 MRA -7.05.1 25 mm thick polished Kota stones Sqm 316.00 1,360.98
78 7.05.2 MRA -7.05.2 25 mm thick any type of textured finish Kota stones i.e. river washed, leather Sqm 117.00 1,393.60
finish, linen finish, lappato finish or similar finish
79 7.05.3 MRA -7.05.3 40 mm thick polished Kota stones Sqm 69.00 1,555.60
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
7.06 Kota Stones - for skirtings - fixing with adhesive
Providing and laying machine-cut polished Kota stones of specified thickness,
specified finish, of any shade (uniform), any size, and any shape for skirtings
(flush with plaster or adjoining surface) as per the drawings, laid in any pattern,
fixed on any type of levelled surface with minimum 6mm thick stone fixing
adhesive as per IS-15477 of an approved make and joined (paper joint) with
grey cement slurry mixed with a pigment to match the shade of the slab,
including providing 6 to 10mm wide grooves between the skirting and the
plaster, finishing, rubbing, curing, polishing, cleaning, protection, scaffolding,
wastage, etc. all complete, for all levels, all floors, all heights, and as directed by
the Engineer-in-Charge. The length of stone for skirting shall be as per design
to match the joints and pattern. The shade of the skirting must match with
flooring if not specified elsewhere.
The rate shall be inclusive of Kota stones (as per the approved sample),
adhesive for fixing, cement slurry, matching pigment, all labour, etc complete.
The Contractor shall arrange loose samples for approval from the Engineer-in-
Charge before mass execution.
The actual laid area of the Kota stones shall be measured for payment without
considering any wastage.
80 7.06.1 MRA -7.06.1 8 - 10 mm thick polished Kota stones Sqm 40.00 1,505.66
81 7.06.2 MRA -7.06.2 8 - 10 mm thick any type of textured finish Kota stones i.e. river washed, leather Sqm 18.00 1,621.81
finish, linen finish, lappato finish, or similar finish
VITRIFIED TILE FLOORING
7.07 Vitrified tiles - for flooring fixing with adhesive
Providing and laying vitrified tiles in different sizes (superior quality tiles) with
water absorption less than 0.08% and conforming to IS: 15622, of an approved
make, in all colours, shades, finish (anti-skid/satin/polished etc) for flooring in
required design and patterns as per the drawing, laid over existing bedding
(cement mortar bedding/concrete screed), fixed with minimum 6mm thick
cement based high polymer modified quick-set tile adhesive (water based)
conforming to IS: 15477 of an approved make and joined with grooves or
without grooves with grey cement slurry mixed with a pigment to match the
shade of the tiles, including cleaning and curing etc., all complete, as directed by
the Engineer-in-Charge.
Rate shall be inclusive of vitrified tiles (as per the approved sample), adhesive
for fixing, cement slurry, matching pigment, all labour etc., complete, but
excluding cement mortar bedding/concrete screed and filling with epoxy grout (if
required) which shall be payable under relevant Tender items. The contractor
shall arrange loose Samples for approval from the Engineer-in-Charge before
mass execution.
The actual laid area of the vitrified tiles shall be measured for payment without
considering any wastage.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
82 7.07.1 MRA -7.07.1 a) With full body, homogeneous, vitrified tiles of size 600 x 600 mm x minimum Sqm 218.00 1,196.40
7.08 Vitrified tiles - For dado/riser/skirting - fixing with adhesive
Providing and laying Vitrified tiles with water absorption less than 0.08% and
conforming to IS: 15622, of specified sizes, specified thickness, approved make,
any finish (satin/ polished etc), any shade, any colour, and any shape for wall
tile/ dado, riser of steps, and pillars laid in any pattern over any type of levelled
surface, with minimum 6mm thick tile fixing adhesive conforming to IS-15477 of
approved make and jointed with groove or without groove with grey/white
cement slurry mixed with a pigment to match the shade of the tiles, including
providing 6 to 10mm wide grooves between wall tiles and plaster edge
treatment, finishing, cleaning, protection, scaffolding, wastage, etc. all complete
for all levels, all floor, all height, as specified and as directed by the Engineer-in-
Charge. The length/width of tiles for dado shall be as per design to match the
joint and pattern of flooring as per drawing. Shade of dado match with flooring.
Rate shall be inclusive of vitrified tile (as per approved sample), adhesive for
fixing, cement slurry, matching pigment, all labour etc complete but excluding
filling with epoxy grout (if required) which shall be payable under relevant
Tender item. The contractor shall arrange loose Samples for approval from the
Engineer-in-Charge before mass execution.
The actual laid area of the vitrified tiles shall be measured for payment without
considering any wastage.
83 7.08.1 MRA -7.08.1 a) With full body, homogeneous, vitrified tiles of size 600 x 600 mm x minimum Sqm 276.00 1,196.40
7.09 Grouting the joints of flooring/wall tiles/stone
Extra for grouting the joints of flooring/wall tiles/stone as specified having joints
of up to 5 mm width in total thickness, using epoxy grout of an approved make
and shade including PVC spacer, filling/grouting, protecting the tiles, Abro-tap
and finishing, complete, as per the direction of the Engineer-in-Charge.
84 7.18.1 MRA -7.18.1 a) Tiles of size 600 x 600 mm x minimum 9mm thick Sqm 494.00 259.17
85 7.18.3 MRA -7.18.3 d) Grouting for any type of stone of any size and in total thickness of stone Sqm 740.00 289.16
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
86 7.10 SOR RA -7.1 M - 25 grade concrete flooring/trimix flooring Cum 10.00 6,160.14
Providing and laying cement concrete flooring of mix M-25 with ready mixed/
batch mixed concrete from a batching plant with required finish (broom/smooth
finish). The ready mixed concrete shall be cast in panels and finished with a
screed board vibrator, vacuum dewatering process and finally finished by
floating, brooming with a machine, pumping from a transit mixer to site of laying
etc., complete, as per specifications, for all heights, all floor and all lifts as per
directions of the Engineer-in-Charge. . If concrete flooring is to be laid over an
existing concrete surface, a bonding agent shall be applied before laying of
concrete. Reinforcement if required shall be paid as per relevant Tender items.
The rate shall include cutting of grooves and filling them with poly sulphide
sealant and baker rod. The volume of laid concrete flooring/Trimix flooring shall
be measured for payment.
ADDITIONAL FLOOR BEDDING WORKS
87 7.11 05003A, Additional Floor bedding with concrete screed : Cum 49.00 4,101.78
5.3.2 Cement concrete pavement/ flooring/ for additional floor screed with M10 grade,
including spreading as per gradient, levelling, finishing and curing complete as
directed by Engineer in charge. Actual laid volume for floor bedding shall be
measured for payment without considering any wastage.
88 7.12 SOR RA -7.12 Additional Floor bedding with Cement mortar : Cum 10.00 3,575.75
Providing and laying cement mortar 1:4 (1 cement : 4 coarse sand) for
additional thickness below flooring item required for gradient and as per drawing
and as directed by engineer in charge including spreading as per gradient,
levelling, finishing, curing etc complete as directed by Engineer in charge.
Actual laid volume for floor bedding shall be measured for payment without
considering any wastage.
89 7.13 SOR RA -7.13 Additional Floor bedding with white Cement mortar : Cum 0.00 11,347.75
Providing and laying white cement mortar 1:3:2 (1 white cement : 3 coarse sand
: 2 marble dust) for additional thickness below marble flooring and behind white
marble wall dado/ lining work (if required) as directed by engineer in charge
including spreading as per gradient, levelling, finishing, curing etc complete as
directed by Engineer in charge. Actual laid volume for floor bedding shall be
measured for payment without considering any wastage.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
90 7.14 SOR RA -7.14 Roughened strip Rmt 126.00 183.26
Providing roughened strips, 2.5 cm wide, to form antiskid surface on the treads
of stairs, in any type of stone, including forming straight deep curved groove,
mm wide & 4 mm deep on two sides of the roughened strip, etching/blasting/
hammering/chiselling between two grooves, polishing the edges, sides and
bottom of grooves etc., complete, as per the approved sample. Only one time
length of tread shall be measured for payment. All processes for the roughening
of the strips shall be carried out at the process unit/work shop only.
91 7.15 SOR RA -7.15 18 mm thick granite vanity/washbasin counters and facias: Sqm 5.00 4,877.69
Providing and fixing 18 mm thick gang saw cut, mirror polished, premoulded and
pre-polished, machine cut granite of any size, any shape, any shade, for vanity/
wash basin counters and fascias, and similar locations, of required size,
approved shade, colour and texture, laid over 20 mm thick cement mortar 1:2 (1
cement : 2 coarse sand) base, joints treated with white cement, mixed with a
matching pigment, epoxy touch ups, including making all holes & cutouts for SS
sink, wash basin, Piller tap/ bib cocks, rubbing, curing, rounding edges,
champhering and polishing to edges, to give a high gloss finish etc., complete,
at all levels, as directed by the Engineer-in-Charge. The plan area of the
counter and the elevation area of the facia shall be measured for payment.
If required, metal framing/supports shall be paid in relevant Tender items..
92 7.16 SOR RA -7.16 Sandwich platform with granite top: Sqm 27.00 8,445.32
Providing & laying sandwich platform comprising of a) a sandwich of 18 mm
thick single side polished granite of an approved size, shade and sample on top
and 30 mm thick polished Kota stone at the bottom, with 25mm thick cement
mortar (1:4) in between. b) At the centre, vertical sandwich supports of 30 mm
thick two Kota stones on their sides and 20mm CM (1:4) in between and at both
end walls vertical supports of 18 mm thick double side granite. c) 75 mm raised
platform at the bottom with Kota on top and 50mm CM (1:4) at bottom, Kota
stone skirting as per the design and approved sample. The rate includes
rounding, champhering and mirror polishing of edges, facias of granite, MS
supports including necessary bonding adhesive (if required). The rate shall be
inclusive of making all holes & cutouts for SS sink, wash basin, Piller tap/bib
cock etc., as directed by the Engineer-in-Charge. Fixtures shall be paid in
relevant Tender items. The plan area of installed platform shall be measured for
payment without considering any wastage.
TOTAL CARRIED OVER TO SUMMARY
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
1) The stones shall be free from cracks, lines, stains, white efflorescence spots
and be even in shade for all kind of stone work.
2) The stones shall be selected and sorted for uniform colour, figure and
thickness and as approved by the Engineer-in-Charge prior to procurement.
The stones shall be from the same lot and/or source (stone quarry) for the same
kind of work and as approved by the Engineer-in-Charge.
3) All type of stone samples shall be approved by the Engineer-in-Charge
before mock-up.
4) The Contractor shall apply an approved stone impregnation primer/sealer
coat on both sides and on all edges of stones (after cutting and finishing of the
stones as per their size). Stone impregnation primer/ sealer coat shall be water
based, with pH value of 7 to 10, in minimum two coats as per the manufacturer's
specifications and as directed by the Engineer-in-Charge. No extra shall be paid
5) The Contractor shall submit wall lining/cladding (for all type of stone cladding/
wall lining) shop drawings with framing work and clamps. Shop drawings shall
be approved by the Engineer-in-Charge. . Mock ups shall be prepared as per
the approved shop drawings and approved by the Engineer-in-Charge before
execution of work.
6) All visible surfaces of the stones shall be in the same finish and texture.
7) Contractor shall provide grooves, drip moulds, etc. as per the design.
8) All adhesives and sealants shall be with low VOC and lead free with
acceptable VOC content as per the Green Building requirements.
9) Stone work shall be carried out for all floors, all levels, all heights, all places,
including loading, unloading, stacking, transporting, hoisting, erecting by any
means (mechanical or manual).
10) Structural stability of stone work shall be the responsibility of the Contractor.
11) The Contractor shall make necessary provisions for any services
cutouts/other required provisions, co-ordinate with all services work and making
good, etc., complete.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
93 7.17 MRA -7.17 Wet sandstone cladding: sqm 795.00 4,760.23
Providing and fixing machine cut, polished or any type of textured finish, uniform
50mm thick sandstone of any shade, in any size, for cladding work, wall lining
work, dado, jambs of doors windows, dado, skirting etc., in required design and
pattern as per the drawing.
Stones shall be laid on a levelled surface (gypsum/ cement plaster/ concrete or
any), fixed with high performance, polymer modified, non-slip, compatible
adhesive (IS-15477) in minimum 6mm thickness of an approved make and as
per the manufacturer's specifications.
The cladding shall be secured at the back and sides of the stone (additional
strengthening) by means of SS 316 cramps/pins (at minimum 300mm centres
along the length of the stone) as per requirement, etc., complete for all levels, all
heights and as directed by the Engineer-in-Charge. Structural stability of stone
work shall be the responsibility of the Contractor. Structural stability of stone
work shall be the responsibility of the Contractor.
The Contractor shall prepare shop drawings based on the concept design/
drawing and get approval from the Engineer-in-Charge. The Architect and the
Engineer-in-charge reserves the right to reject part or all of the work if it is
substandard not as per the approved sample or per mock-up or does not
confirm to the approved sample/mock-up.
The rate shall be inclusive of all material (stones, sealer coat on the internal
sides and edges, adhesive, SS 316 cramps/ pins etc), labour for fixing,
moulding, champhering, rubbing, curing, finishing, cleaning, protection,
scaffolding, wastage etc. all, complete, as per the approved shop drawings, and
as directed by the Engineer-in-Charge. Backing coat plaster, angular wire cut
stones and water repellent coating shall be paid under relevant Tender items.
For angular shape wire cut stone if any required to execute in wet cladding,
stone shall be paid in solid stone item, however fixing charges for wet cladding
is included in this item.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
94 7.18 MRA -7.18 Ornamental/plain Solid stone work with carving: cum 216.00 1,92,647.45
Designing, providing, supplying, fabricating, hoisting and fixing in position good
quality, durable, machine cut solid sand stone (i.e Balesar/Chunar or similar
as per design intent) work (with/without carving and with/without wire cut stone)
made out of any type of sandstone, of any shade, with any type of
polish/textured finish, in any size, in various types of stone elements, i.e. solid
stone bands, column caps, column pedestals, cutouts, water spouts, coping,
steps, cornices in stone cladding, stone work for temple, chatri, stone bracket,
stone plank, stone chajja, pergolas, pavilion, gazebo, stone gate structure,
drains or other similar elements in required size, shape, texture as per the
approved drawing and approved sample, fixed on concrete/masonry/steel
structure. Stone shall be free from cracks, lines, stains, white spots of
efflorescence and even in shade for each elements. The stone shall be fine
grained and reddish or buff-colored (locally available).The work shall be carried
out as per attached drawings with differant process of i.e carving (manual/ by
machine), ornamental work, traditional temple work, figure work (any type, any
size), CNC cutting, moulding. The drawings provided are vary preliminary and
amount of carving will be more then what is shown on the drawings. The carving
and molding work shall be of very good quality. The stones to be fixed in line,
level and plumb in all respect with the use of brass clamps, pins, dowels,
cement slurry with matching pigment and Epoxy of approved make as required
and as approved by the Architects.
The stones shall be fixed to metal frames by using system of SS 316 undercut
anchor fasteners (ETA approved), adjustable aluminium brackets (fixed with
under cut anchors), other approved fixing system, SS316 clamps and pins, SS
316 anchor fasteners for concrete, masonry work and steel structure, SS
nuts, bolts, and washers, required accessories, fasteners and fixtures etc as
recommended by the manufacturer and design calculations. The aluminium
quality shall be as per grade 6063 T6 and BS 1474. If required, the stones shall
be fixed with white cement mortar with a matching pigment/stone fixing
adhesive/epoxy with mechanical strengthening, as suggested by the Engineer-in-
Charge and as per the design.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
In case of solid stone work in cladding works, The undercut anchors/any type of
anchoring system shall be fixed to the stones with special tools, tackle,
equipment and as recommended by the manufacturer. Installation, testing and
setting instructions shall be strictly followed as per the approved manufacturer’s
The Contractor shall prepare shop drawings based on the concept
drawing/design intent/3D view, along with design calculations (design to
withstand wind pressure as per IS 875 (part - 3) and as per the category of
seismic zone) of the supporting arrangement and its fixing to any type of
surface. All mortar dropping or other stains shall be cleaned by wet jute brush
immediately after completing masonry work to show clean stones in elevation
before closing day's work.
Mock-ups shall be carried out as per the approved material and shop drawings
and as directed by the Engineer-in-Charge before execution of the work. The
Architect and the Engineer-in-charge reserves the right to reject part or all of the
work if it is substandard not as per the approved sample or per mock-up or does
not confirm to the approved sample/mock-up. Structural stability of stone work
shall be the responsibility of the Contractor.
The rate quoted shall be inclusive of materials (stone, SS 316 under cut
anchors/ any other type of anchors/other anchoring system as approved for
fixing, adjustable aluminium brackets, anchor fasteners, clamps, pins, nuts and
bolts, washers, mortar, adhesive, etc., and any other approved framing system
for stones), labour, machinery, tools, tackle, special equipment, scaffolding,
sealer coat on all sides and edges, wastage of all materials etc., complete, for
all levels, all heights, as per the specifications and as directed by the Engineer-
If required any Metal framing system and water repellent coating shall be paid
under relevant Tender items.
The volume of installed stones shall be measured for payment without any
wastage. In the case of hollow elements or stone panel enclosures, the volume
of the panels shall be measured instead of the outermost dimensions of the
finished product and, Hollow portion shall not be measured for payment
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
Sandstone Jali work:
Providing, fabricating, transporting, hoisting, and fixing in position, good quality
with specified thickness 2D/3D jali made of any type of sandstone (i.e
Balesar/Chunar or similar as per design intent) of any shade, any finish in
any shape, any pattern for all levels and all heights. The Jali shall be made as
per the design, with different processes, i.e. carving (manual/by machine),
ornamental work, traditional work, CNC cutting, water jet cutting, machine
moulding, etc. The drawings for the Jali shown are indicative/tentative and may
vary from the pattern/design/carving etc. as shown in the drawings.
The Contractor shall prepare a shop drawing based on the concept design/
drawing/3D view and get it approved from the Engineer-in-Charge. All mortar
dropping or other stains shall be cleaned by wet jute brush immediately after
completing masonry work to show clean stones in elevation before closing day's
Mock-ups shall be carried out as per the approved material and shop drawings
and as directed by the Engineer-in-Charge before execution of the work. The
Architect and the Engineer-in-charge reserves the right to reject part or all of the
work if it is substandard not as per the approved sample or per mock-up or does
not confirm to the approved sample/mock-up.
The stone Jali is to be fixed any elements on any surface in line, level, and
plumb, with the use of metal framing, SS 316 undercut anchors/other types of
the anchors as approved, adjustable aluminium brackets, clamps, SS
anchor fasteners of required capacity, nuts, bolts, washers, dowels, pins, with
the use of white cement mortar with a matching pigment, toungue and groove
system, epoxy and/or stain-proof, waterproof cementitious grout of an approved
make and shade as required and as approved by the Engineer-in-Charge.
Structural stability of stone work/stone jali work shall be the responsibility of the
The Jali shall be secured at the back and sides of the stone (additional
strengthening) using SS 316 cramps, pins, as per requirement and as directed
by the Engineer-in-Charge.
The rate quoted shall be inclusive of materials (stone, white cement mortar,
epoxy, grout, SS 316 cramps, pins etc, labour, machinery, tools, tackle,
scaffolding, sealer coat on the internal side and edges, wastage of all material,
etc., complete, for all levels and all heights as per the specifications. Water-
repellent coating and metal framing (if required) shall be paid under the relevant
95 7.19 MRA -7.19 a) Sandstone Jali work 40 to 50 mm thick Sqm 416.00 16,071.68
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
96 7.20 MRA -7.2 Carving work on any type of stone elements Sqm 100.00 78,349.44
Extra for carving work/engraving for motif/carving/signage i.e. text in hindi,
English, sanskrit or other language, numbers, grafics, letter, symbol, logo etc of
any size any shape for all floor all height etc as per drawing and as directed by
engineer in charge up to 50 mm depth on any type of stone elements i.e. for
paving, cladding, coping, steps, band/Patta in stone cladding, solid seating,
benches, any type of poles, planter boxes, bollards, or other similar elements,
solid stone base, as per the Concept design for any type of stone by manual or
with CNC or water jet machine as per drawing. Contractor shall prepare shop
drawing (scale 1:1) base on concept design and get approved. Sample shall be
approved by Engineer in charge. Mock-up shall be carried out as per approved
shop drawing and sample. Actual area of carving on stone shall be measured
Cost of plain stone, cladding system with anchor and framing shall be paid in
relevant tender item.
TOTAL CARRIED OVER TO SUMMARY
9.00 FALSE CEILING WORK
Notes for False ceiling work:
1. Points to be taken care of by the Contractor before selecting a manufacturer
from an approved make list
• Boards/tiles/panels, grid system, suspension system and all accessories shall
be from a single vendor and from the same make unless otherwise approved by
Engineer-in-charge.
2. Points to be taken care of by the Contractor before installation:
• Contractor shall correlate all services drawings from different installers and
prepare a clash free shop drawing as per the architectural drawings for RCP,
with all services integrated, vis a vis HVAC, FFTG, PLUMBING, ELE, ELV &
any other services planned and part of the design.
• The method statement for execution of all services coordinated with the ceiling
execution shall be submitted by the Contractor for approval of the Engineer-in-
charge before commencing execution work at site.
• Quality check and sequence of execution along with relevant documentation to
be ensured by the site project team for inspection and quality checks.
• Installation to be carried out by an approved and certified installer of the
manufacturer. The Contractor to submit manufacturers' approved certificate of
installer to the Engineer-in-charge before commencing work.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
3. Points to be taken care of during installation :
• The false ceiling work to be strictly supervised for alignment, line & level and
overall quality of installation and the Contractor to strictly follow the approved
methodology statement.
• The false ceiling suspension work shall be strictly from the mother slab or
secondary supports installed for the false ceiling and not from any suspension
members of other services.
• Trap doors to be fixed in line & level with the false ceiling, with a separate
suspension system from the mother slab and not with the false ceiling members.
Groves around the trap doors should be uniform on all sides.
• All services equipment & light fixtures, curtains etc. to be fixed with a separate
suspension system from the mother slab, not on the false ceiling tiles or false
ceiling members.
• For gypsum ceilings, the Contractor shall provide perimeter channels at the
periphery of all services cutouts for strengthening the system. All cutouts in the
boards shall be finished with tape, angle skimming coat etc. as per the
manufacturer's specifications.
• If required, additional supports to be provided for fixing the false ceiling (in
case of special shape, more height etc).
• In case the height of suspension system is more than what is recommended
by the manufacturer, separate MS supports to be provided from the mother slab
and the false ceiling to be suspended from the MS supports. Design and shop
drawing for the MS fabrication work and connections with the structure
members shall be submitted by the Contractor for approval by the Engineer-in-
charge. MS framework to be designed to accommodate other services, if
required. Such MS frame work shall be paid under relevant Tender items.
• The sequence of execution of the different services to be aligned with the RCP
to avoid any rework.
• Movement joints/groove to be provided in the boards or grid ceiling system in
large span areas.
4. Points to be taken care of post execution:
• Warranty for the false ceiling system to be provided by the installer &
manufacturer to ensure that the work is completed as per the specifications
(material and workmanship) and methodology statement.
• Completion certificate to be provided by the installer & to be signed and
verified by the manufacturer with respect to the Tender specifications and
approved shop drawing.
• All test reports are to be submitted by the Contractor for performance.
5. General Notes:
• Contractor to quote the rate considering all points mentioned in the
specifications.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
Gypsum False ceiling:
Providing and installing a gypsum false ceiling at all heights, including a
framework made from special sections, power-pressed from M.S. sheets, and
galvanized with a zinc coating of 150 gms/sqm (both sides) in accordance with
IS: 277. The framework shall consist of angle cleats, 25 mm wide x 1.6 mm
thick, with flanges of 27 mm and 37 mm, spaced at 1200 mm centre-to-centre.
One flange shall be fixed to the ceiling with dash fasteners, 12.5 mm Dia x
mm long and 6 mm Dia bolts, while the other flange shall be attached to angle
hangers of 25x10x0.50 mm, of required length, with nuts and bolts. The opposite
end of the angle hanger shall be secured to intermediate G.I. channels
(45x15x0.9 mm), spaced 1200 mm centre-to-centre. The ceiling sections, made
from 0.5 mm thick bottom wedge sections (80 mm with 26 mm tapered flanges
and 10.5 mm lips), shall be positioned perpendicular to the intermediate G.I.
channels at 450 mm intervals using connecting clips made of 2.64 mm Dia x
230 mm long G.I. wire at each junction.
Perimeter channels, 0.5 mm thick and 27 mm high with 20 mm and 30 mm
flanges, shall be fixed to the wall or partition using rawlplugs at 450 mm
intervals, with 25 mm long drywall screws spaced at 230 mm. Gypsum boards
shall be attached to the ceiling sections and perimeter channels with 3.5 x
mm drywall screws at 230 mm intervals. Jointing and finishing shall include a
flush finish of tapered and square edges using recommended jointing
compound, jointing tapes, and three layers of jointing compound covering up to
150 mm on both sides of the joint, followed by two coats of primer suitable for
the board. All work will be executed as per the manufacturer’s specifications.
In the false ceiling work, vertical drops (drop-down Patta) more than 300 mm
shall be measured and paid. The rate shall also include the cost of making
openings for light fittings, grills, diffusers, and cut-outs made with frames of
perimeter channels suitably fixed, all complete, as per the drawings,
specifications, and direction of the Engineer in Charge, but excluding the cost of
putty and painting. The installation shall be carried out by an approved installer
and the material of the suspension system shall be as per the manufacturer's
specifications.
The Contractor shall prepare shop drawings with coordination of all services and
openings/accesses. The sample, shop drawings, and mock-ups shall be
approved by the Engineer-in-Charge. The actual installed area in plan and area
for vertical drop down more than height/width of 300 mm shall be measured for
payment without considering any wastage and without deductions of area for
lights, diffusers, columns, etc. Nothing extra shall be paid for making provisions
for providing lights, diffusers, AC grills, fire alarm systems, sprinkler systems,
and other such fittings/services. All work shall be carried out as per the
approved sample, mock-up, and shop drawings including all material and
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
98 9.01 MRA -9.01 b) 12.5 mm thick fire resistant glass reinforced gypsum (GRG) boards Sqm 47.00 1,211.85
(Confirming to BS476) complying to IS: 2095 :
99 9.02 MRA -9.02 c) 12.5 mm thick perforated gypsum boards size 1200 x 2400 x12.5 mm having Sqm 100.00 2,158.52
approximately 15 % perforated area with any perforation size and any pattern as
approved by the Engineer-in-Charge and as per the manufacturer's
specifications, with all 4 sides tapered and backed by acoustical tissue with
NRC value not less than
100 9.03 MRA -9.03 Mold resistance paperless Gypsum Ceiling Sqm 30.00 1,812.45
Providing and fixing a suspended ceiling system using a minimum 12.5 mm
thick paperless, modified glass fibre reinforced gypsum core board with
enhanced moisture and mould resistance as per EN 15283 Part-1. The board
shall have a thermal conductivity of 0.3 W/mºK, thermal resistance of
m²K/W, and conform to ASTM D3273 for mould resistance and EN520 Type H1
for water resistance. The board shall have square or tapered edges on all four
The suspension and grid system will be constructed from GI (IS-513), with a
yield strength of 260 MPa, finished with a 150 GSM galvanized coating as per IS-
277. The sections will feature a serrated, knurled, chequered, or ribbed pattern.
A 0.5 mm perimeter channel will be fixed along the perimeter of existing walls
using 6x40 mm impact anchors of an approved make at 600 mm centres. A
mm ceiling angle will be suspended by attaching it to a soffit cleat, made of CR1
grade (IS-513) material, with a zinc coating of 7 to 8 microns and a pull-out load
capacity of 6.8 kN. This setup will create a 1200 mm x 1200 mm grid.
The intermediate channel, 0.9 mm thick, will be secured to the ceiling angle
using an M6 x 12 mm hex nut and bolt arrangement (material as per EN
finish: zinc plating) or with 2 no. Ø4.2x13 metal-to-metal screws made of carbon
steel as per EN-ISO 7049/50 with a minimum 4-micron zinc coating. The ceiling
section will then be fixed to the intermediate channel using connecting clips
made from high carbon spring steel wire (BS970 Gr. En 42, 46-48 HRC, finish:
zinc plating 4-6 microns) and positioned perpendicularly to the intermediate
channel at 600 mm centre-to-centre spacing.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
Single-layer gypsum boards shall be secured to the ceiling section using 25 mm
drywall screws made of carbon steel (EN-ISO 7049/50). The joints shall be
finished with a jointing compound, recommended filler, jointing tapes, and
finisher conforming to ASTM C475, to achieve a flush appearance. The finishing
process shall include two coats of primer suitable for the board, as per the
manufacturer’s specifications. The cost shall include making openings for light
fittings, grills, diffusers, and other cut-outs, framed with perimeter channels and
fixed as per the drawings, specifications, and directions of the Engineer in
Charge, but excluding the cost of putty and painting.
For false ceilings with drop-down pattas (vertical elements) exceeding a height
or width of 300 mm, measurements and payment will be based on the actual
installed area. The rate shall include the cost of creating openings for light
fittings, grills, diffusers, and other fixtures, framed with perimeter channels and
installed according to the drawings and specifications and as directed by the
Engineer in Charge. The cost excludes putty and painting.
The Contractor shall prepare shop drawings in coordination with all services,
including provisions for openings and access. Samples, shop drawings, and
mock-ups must be approved by the Engineer in Charge. Payment will be made
based on the actual installed area, including vertical drop-downs exceeding
mm, without accounting for any wastage or deductions for lights, diffusers,
columns, etc. No additional payment shall be made for making provisions for
providing lights, diffusers, AC grills, fire alarm systems, sprinkler systems, and
other fittings/services.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
101 9.04 MRA -9.04 Providing and fixing a suspended vertical linear baffle ceiling at all heights, Sqm 140.00 4,457.84
constructed from a minimum 0.6 mm powder-coated, roll-formed aluminium U-
shaped baffle. The baffle shall be made of aluminium alloy grade AA 3105 and
shall have dimensions of 100 x 50 x minimum 3000 mm (except at openable
portions and residues). The baffles will have a plain finish in an approved shade,
with a centre-to-centre spacing of 150 mm. The baffles shall be electrostatically
polyester powder-coated to a thickness of 60-80 microns.
The baffle blades shall be suspended using slotted U-profiles of appropriate
size and length (as per the baffle length), equipped with slots, torsion springs,
baffle hangers, splices, and threaded rods. Longer baffle sections will be joined
using baffle joiners, with the ends capped using end caps. Each hanger shall be
secured in position with locking clips or another approved method. For sections
that need to be opened, locking clips or torsion springs will be provided as per
the manufacturer’s specifications.
The baffle blades shall be connected at the ends with baffle joiners, inserted into
the top and bottom slots of the baffle closed profile for alignment only. The entire
suspension system and installation method shall be approved by the Engineer-
in-Charge. Installation will be carried out by an approved installer following the
manufacturer’s recommended procedures.
The baffles, along with the suspension system used together, shall carry a
year warranty against manufacturing defects and the manufacturer shall provide
a warranty certificate. The supply shall be backed by a Manufacturing Test
The Contractor shall prepare shop drawings with coordination of all services and
opening/access for the baffles. Sample, shop drawings and mock-up shall be
approved by the Engineer-in-Charge. Measurements shall be wall to wall without
any deductions for lights, diffusers, columns etc., of areas less than 0.36 sqm.
Nothing extra shall be paid for making provisions for providing light, diffusers,
AC grill, fire alarm, sprinkler system and other such fittings. The Out to out plan
area of aluminium Baffle ceiling system shall be measured for payment without
considering any wastage and without any deductions for lights, diffusers,
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
102 9.04 MRA -9.04 Access panel/ trap door: Sqm 25.00 4,119.99
Providing, supplying, and fixing ready-made, powder-coated access panels or
trap doors (single shutter/ double shutter) (Inner Frame - minimum 1.5 mm,
Outer Frame - minimum 2mm MS sheet) of an approved make and size, as per
the drawings. The installation shall include an aluminium outer and inner frame,
door, push latch, safety cable and hook, removable hinge, intermediate and
perimeter channels, and other necessary components for all floors, all heights
etc., complete, as directed by the Engineer-in-Charge. The tile or board of the
access panel shall match the false ceiling board.
The Contractor shall submit the technical data sheet of the product, detailing its
loading capacity, to the Engineer-in-Charge. A loose and fixed sample or mock-
up of the access panel must be approved by the Engineer-in-Charge.
The Contractor shall prepare a shop drawing based on the concept drawings,
including fixing arrangements and services, and prepare a mock-up of the
required area. Work shall commence only after approval of the shop drawings
The access panel system shall be fixed to any type of surface (e.g., RCC,
metalwork, etc.) with the necessary anchorage capacity, following the
manufacturer’s specifications. The Contractor shall ensure that the access panel
system is securely fixed, including appropriate arrangements with the adjoining
false ceiling and the bottom of the slab. The stability of the access panel system
shall be the Contractor’s responsibility.
TOTAL CARRIED OVER TO SUMMARY
10.00 WALL PANELLING WORK
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
1) The The Contractor shall prepare shop drawings based on concept
drawing/design for all false ceiling, panelling and partition work in coordination
with all services and get approval from the Engineer-in-Charge before execution
2) All veneer and wood shall be FSC (Forest Stewardship Council) & Green
Guard certified.
3) All Manufactured products shall be with at least 5% recycled content.
4) Samples of all loose material and mock-ups shall be approved by the
Engineer-in-Charge.
5) Any wood/wood based material/plywood/MDF board shall be treated with anti-
termite treatment as per relevant IS code before use. Rates are inclusive of anti-
termite treatment of all such members.
6) The The Contractor shall co-ordinate for all services in wall panelling/ceiling
work i.e. making openings for light fittings, switch boards, electrical points, grills,
diffusers, cut-outs for any services, provision of addition framing members for
strengthening, making good, as per the satisfaction of the Engineer-in-Charge.
7) All elements shall be factory fabricated and finished, only final finishing to be
carried out on site with all necessary precautions.
8) The The Contractor shall co-ordinate for all services (cutouts and provisions)
in all type of wall panelling, false ceiling, partitions, pelmets and other interior
work. All cutouts and services provisions shall be finished at the factory/ work
103 10.01 MRA -10.01 Mirror with aluminium frame: Sqm 18.00 3,848.10
Providing and fixing 6mm thick superior quality wall hung mirror with modular
aluminium frame. Mirror shall be extra clear, decorative type, best quality,
bevelled edge at the periphery and of an approved make, in any shape and
The aluminium frame shall be up to 100mm wide, extruded type, with anodized
finish of an approved make in any shape and shade.
The backing of the mirror shall be 8mm thick cement bonded particle board/fibre
cement board and fixed with silicon sealant/double sided tape to the mirror.
The mirror assembly shall be with a floating hanging system with required
hanger, Z bar or French cleat etc., complete, in proper plumb and level etc. for
all floors, all levels, all heights as directed by the Engineer-in-Charge. The rate
shall include the mirror, cement fibreboard, anodised aluminium framing,
including adhesive, double sided tape, screws, fasteners and all required
accessories. Out to out area of the mirror with the aluminium frame shall be
considered for payment without any wastage.
TOTAL CARRIED OVER TO SUMMARY
11.00 PAINTING/POLISHING WORKS
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
1) All adhesives, sealants, and paints shall be water-based, with low VOC
content and lead-free, meeting Green Building Norms and standards for
acceptable VOC levels.
2) The paint shall be applied only after thoroughly brushing the surfaces to
remove mortar dropping and other foreign matter, preparing the surface to be
even and smooth with sandpaper, after applying each coat of putty and primer.
3) The Contractor shall provide a warranty certificate where applicable.
4) Additional coats shall be applied as necessary until the surface presents a
uniform appearance at no extra cost.
5) The paint shall be applied using any method (e.g., brush, roller, spray).
6) The Contractor shall prepare and submit samples of a minimum of three
shades, as suggested by the Engineer-in-Charge, for approval.
7) The rate shall be applicable for all floors, all levels, all heights and by any
means, including scaffolding.
104 11.01 19032 White cement-based putty Sqm 1,583.00 40.59
Providing and applying white cement-based putty of average thickness 1 mm, of
an approved make and manufacturer, over any surface, to prepare the surface
even and smooth, complete, for all floors, all heights and all levels. .
The single time applied area of putty shall be measured for payment without
considering any wastage.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
105 11.02 MRA -11.02 Acrylic emulsion paint - interior grade Sqm 1,583.00 200.08
Providing and applying two coats of superior quality, interior-grade premium
acrylic emulsion paint and required number of coats of primer from an approved
make and shade. The paint must be highly washable, anti-fungal, anti-bacterial,
scratch-resistant, and scrub-resistant, with a VOC (Volatile Organic Compound)
content of less than 50 grams per litre of an approved brand and manufacturer.
The primer shall have low VOC (Volatile Organic Compound) content, modified
acrylic, water-based alkali-resistant primer as per manufactuers specification
and the same make of the paint. This application will be carried out over any
surfaces, on walls, ceilings, false ceilings, partitions, or any elements and
Interior works (Masonry/plywood/wood/RCC etc.) etc., including any additional
coats required to achieve an even shade and colour across all floors, all levels,
all heights, complete up to satisfaction of the engineer incharge.
This includes applying two or more coats of paint and the necessary number of
primer coats as per the manufacturer’s specifications on any surface, complete,
for all floors, all heights, all levels.
The single time applied area of paint shall be measured for payment without
considering any wastage. The Contractor shall prepare the required number of
mock-ups in the specified sizes with different shades or colours for approval
from the Architect and the Engineer-in-Charge before proceeding with the full
execution, at no additional cost. The final paint shall be done as per final
selection pallet of the colour/shade/accent paint for respective elements.
106 11.03 MRA -11.03 Acrylic emulsion paint with primer - Exterior grade Sqm 8,609.00 162.21
Providing and applying 100% acrylic smooth exterior paint with an exterior
primer from an approved make and shade. The paint shall have a VOC (Volatile
Organic Compound) content of less than 50 grams per litre. This includes
applying two or more coats of paint and the necessary number of primer coats
as per the manufacturer’s specifications on any surface, complete, for all floors,
all heights, all levels. The primer and Paint shall be of the single make.
The exterior paint and primer shall come with a minimum 7-year warranty. The
Contractor shall prepare the required number of mock-ups in specified sizes
with different shades or colours for approval from the Architect and the Engineer-
in-Charge before proceeding with the full execution, at no additional cost. The
final paint shall be done as per final selection pallet of the colour/shade/accent
paint for respective elements. The single time applied area of paint shall be
measured for payment without considering any wastage.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
107 11.04 MRA -11.04 PU polish - for external/internal wooden & veneered surfaces: Sqm 17.00 2,118.83
Providing and applying interior/exterior grade water-based polyurethane (PU)
polish of any shade and finish (matt, glossy, or semi-glossy) of an approved
make on new or existing external and internal wooden and veneered surfaces at
all levels and heights. The polish work shall be carried out as follows:
1) Surface Preparation: Sandpapering with various grades, up to 220 macro grit,
to the satisfaction of the Engineer-in-Charge.
2) Sealer Application: Applying two coats of sealer using a spray gun or other
suitable means, allowing sufficient drying time as per the manufacturer’s
specifications.
3) Wet Rubbing: Once the sealer coat has dried, wet rubbing with fine emery
cloth using ample water to remove the excess sealer layer and smooth the
surface. After wet rubbing, apply special grade PU fillers to fill any small or large
holes/grooves. Allow the filler coat to dry as per the manufacturer’s
specifications.
4) First Coat of PU Polish: Apply the first coat of PU polish with a spray gun or
suitable means. Once dry, sandpaper the surface using fine sandpaper up to
400 micro-grit. This process shall be repeated three times, ensuring a smooth
5) Stainer Coat Application: Apply a stainer coat of the approved shade, if
required. Sandpaper the wood surface using fine sandpaper up to 600 micro-grit
as per step wise requirement for polishing, to achieve a smooth finish, to the
satisfaction of the Engineer-in-Charge.
The polish application shall be conducted according to the manufacturer’s
specifications and as directed by the Engineer-in-Charge. A sample must be
approved by the Architect before the full execution of the work. The single time
applied area of polish shall be measured for payment without considering any
108 11.05 MRA -11.05 Stain-repellent transparent coating - for natural stone, exposed concrete Sqm 5,985.00 240.48
work, exposed brickwork
Providing and applying Hydrophobic Silane - Siloxane coating of approved
make, to exposed concrete surfaces at all heights & leads and wherever
instructed by Engineer-In-Charge. The treatment shall be in two coats wet-on-
wet or as recommended by approved manufacturer including preparation of
surfaces by cleaning, curing, protecting, independent double legged scaffolding
etc complete. The rate includes the cost of all materials, its application by
specialized applicators by spray coating with airless sprayer, cleaning the
substrate of all laitance, construction dust, contaminants, double scaffolding,
labour etc., all complete and at all levels, leads and heights as per particular
specification & directions of engineer in charge. Guarantee Bond in the
prescribed proforma shall be executed by the contractor for the satisfactory
performance of the application for 5 years. The single time applied area of
paint shall be measured for payment without considering any wastage.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
109 11.06 MRA -11.06 Providing and applying external finish of average 2 to 2.5mm thick acrylic based Sqm 1,398.00 399.46
texture coating of approved make and pattern with standard tool to give even
shades and applicator as specified by manufacturer on exterior surfaces at all
heights including scaffolding etc including thoroughly brushing the surfaces free
from mortar dropping and other foreign matter and sand paper smoothed,
necessary primer etc. complete as per the manufacture specifications and up to
the satisfaction of Engineer in-charge. The rate includes making of grooves,
pattas and finishing as directed by engineer in charge. External paint on texture
coating shall be measured and paid in relevant tender item. (Item should be
executed by approved applicator only.)
110 11.07 MRA -11.07 Natural stone type Exterior Texture Sqm 1,729.00 1,654.08
Providing and applying external finish of average 2 to 2.5mm thick acrylic resin
texture body coat incorporating natural and unique texture of natural sand stone
texture coating (without pigment) of approved make, approved shade (Match to
exisiting stone cladding) and approved pattern and as per following for all level,
1) Surface preparation - thoroughly brushing the surfaces free from mortar
dropping and other foreign matter and smoothening with sand paper up to the
requirement. Surface shall be dry and free from dirt, dust, oil, grease and foreign
matter. Surface unevenness, cracks etc. shall
be made good with cementitious filler without any extra cost.
2) Under coat application/primer in One or two coats shall be done by any
means (Roller/brush/sprey) as per manufacturer's specification and undercoat
material shall be as per approved manufacturers specifications and compatible
with selected texture.
3) Texture application - Texture shall be of One or two coats with overall
average thickness 2 to 2.5 mm thickness having UV resistant, anti-fungal, anti-
mold, anti-algal, and water permeable properties with/ without groove as per
design. Texture shall be made of natural stone dust (pink sand stone/match to
existing sandstone) as strainers and acrylic or resin based. Texture shall be
applied with standard tools to achieve even shade and finish as per
manufacturers specifications.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
4) Finish/Protection coat - Texture surface shall be protected with one or two
coat water base clear coat having low VOC content, which incorporates high-
tech fluorocarbon resin emulsion and silicone resin emulsion.
Final product having minimum 5 years warranty. also, Final texture shall a)
Creates an elegant sandtone effect , b) Elegant and Durable c) Excellent colour
retention due to usage of natural stone d) Excellent weather resistance e) Light-
The rate includes surface preparation, primer application, texture coating,
protection coating, making of grooves, pattas, finishing and scaffolding as
directed by engineer in charge. Texture shall be applied on any surface.
The item shall be executed by an approved applicator only. Sample (shade and
patterns as suggested by EIC) shall be prepared for review and approval. Work
shall be carried out as per the final approved sample.
The sample shall be approved before starting the work. The Mock-up shall be
carried out as per the approved sample. Minimum 3 mock up (No of mock up
shall be as per satisfaction of the engineer incharge) shall be done at site for
texture to match the final shade and finish including overall look and fill with the
existing sand stone claddinhg without any extra cost. The architect and Engineer
in charge reserve the right to reject part or all work of substandard or not in
confirmation to the approved sample as per mock-up. The total execution
method shall be as per the manufacturer's specification and approved by the
Architect and Engineer in charge. Actual applied area of the texture eshall be
paid without considering any wastage.
TOTAL CARRIED OVER TO SUMMARY
12.00 ROOFING WORK
110 12.01 SOR RA - Sandwich panels for roofing Sqm 100.00 3,329.97
12.01 Providing and installing prepainted "Sandwich panels" for roofing, as per
approved make. Panel skins shall be PPGL type, 35/250 profile sheet of SMP
coated of 0.5 mm thickness (TCT) for external and internal, light profiled, at the
bottom with guard film on both sides. The insulation core shall be rigid PIR
insulation of minimum density 40 Kgs/Cum and thickness of 50 mm minimum
at the valley. The rate to include the cost of all necessary accessories like
fasteners, washers, stitch rivets, laps sealant and fillers, gable and eaves
flashing,ridge, using the same material as the panel skins, sealing laps with
sealant and exposed ends protected, as directed by Engineer-in-charge.
Approved colour and brand to be procured. Measurements shall be considered
as per installed area.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
111 12.02 SOR RA - Roofing accessories - gutter/flashing/ridge (600 mm over all girth) Rmt 10.00 336.78
12.02 Providing and fixing precoated galvanised steel sheet roofing accessories
mm (+0.05 %) total coated thickness(base metal thickness of 0.45 mm and
coating thickness of 0.05 mm), Zinc coating 120 grams per sqm as per IS:
in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and
polyester top coat 15- 18 microns polyester top coat. using self drilling/ self
tapping screws complete :
The accessories shall be fixed using self-drilling/self-tapping screws, as directed
by the Engineer-in-Charge, for all floors, levels, and heights.
TOTAL CARRIED OVER TO SUMMARY
13.00 METAL WORK
1. All adhesives, sealants & paint shall be with low VOC with acceptable VOC
content as per GRIHA requirements and lead free.
2. The Contractor shall prepare shop drawings based on the concept design/
drawings for any type of fabrication work and get them approved. The
Contractor shall prepare mock-ups/prototypes (as suggested) as per the
approved shop drawings for approval. Work shall be carried out as per the
approved shop drawings, approved mock-ups/prototypes and as suggested by
the Engineer-in-Charge.
3. The rate shall be for all floors, all levels and for all heights.
4. The rate shall include the cost of all types of fasteners (ETA approved) to be
used for fixing.
5. Structural stability shall be responsibility of the Contractor for all kinds of
6. All elements shall be factory fabricated and finished, only final finishing to be
carried out on site with all precautions.
7. The Contractor shall coordinate all services related work (cut-outs and
provisions) in the metal work. All cut-out and services provisions shall be
finished at the factory/work shop.
8. The Contractor shall provide PVC/nylon separators, where two different
metals connect, to avoid galvanic reactions.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
112 13.01 SOR RA - Structural steel work - Fabrication works - with PU paint: Kg 63,430.00 148.77
13.01 Providing, fabricating, assembling, hoisting, erecting and fixing in position,
structural steel work, at all heights, all levels, all shapes & sizes with all leads &
lifts, using any type of MS sections like rolled steel sections, hollow sections,
plates, chequered plates, bars, sheets, rods, threaded bolts etc. all conforming
to the latest relevant IS codes for the metal elements, i.e. railings, signage
poles, gates, bus shelters, screen walls, commercial poles, gantry structure,
grills, bracings, foundation plates & bolts, platforms, brackets, fencing poles,
framing for advertisement boxes on lighting poles, electrical elements etc.
including straightening, cutting, bending, bolting and welding the members, all
as per the structural drawings and as per detailed specifications (for materials &
workmanship) including profile cutting, smooth grinding, machining of
edges/faces, all necessary welding (electric arc welding) for the required weld
lengths and sizes, machine drilling of holes for joining/anchoring, all necessary
arrangements for templates to keep the foundation bolts in position, dry sanding,
degreasing (wet cleaning) & preparation of rust-free surfaces manually or
mechanically, metal putty to make the surfaces even and smooth, necessary
scaffolding/staging, anchor fasteners for fixing, etc., complete, for all floors, all
heights and all level as directed by the Engineer-in-Charge.
Additionally, the fabricated steel work will be finished with PU paint to ensure
durability and aesthetic quality.
The Contractor shall prepare coordinated fabrication/shop drawings and obtain
approval before commencing any fabrication work along with design calculations
to ensure the stability of the elements. All fabrication work must be executed
with precise architectural workmanship and in accordance with Sections V and
VI of IS 800 and IS
The rate shall include the application of two or more coats of PU paint (DFT min
40 micron per coat) on all surfaces of MS members of approved make and
shade. This shall be applied over two coats of anti-corrosive epoxy base primer
(DFT minimum 50 microns per coat), as per the manufacturer’s specifications,
anchor fasteners, etc., all complete. The weight (by theoretical means) of MS
members/structure/element shall be measured for payment without considering
wastage, fixing accessories such as nuts, bolts, fasteners etc.
113 13.02 SOR RA - Extra for providing hydraulic bending to MS member (i.e. hollow sections, Kg. 559.00 46.91
13.02 rolled steel sections, any type of plates, sheet, bar etc) of any thickness any
size as per drawing, for any type of steel structures like railing, bus shelter,
signage structure, gantry structure etc. including straightening, profile cutting,
bending (precision bending), etc all as per approved shop drawings and as
directed by Engineer in charge.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
114 13.03 SOR RA - Extra for providing Hot dip galvanizing work confirming to IS 4759/ 2629/ Kg 55,790.00 52.77
13.03 2633 with zinc of 610 GSM thickness on any type of MS section for any
elements etc. for all the places, all heights, all level as per the drawing and as
instructed by Engineer in charge. The rate shall include preparing the surface by
shot blasting/ acid washing prior to hot deep galvanizing, labour, tools,
machinery etc complete (Sample to be approved). The weight of steel sections
before galvanization shall be measured for payment. The cost of steel sections
shall be paid for separately under relevant item.
115 13.04 SOR RA - Extra for providing and making CNC cutting on Any metal surface of any type, Sqm 50.00 938.49
13.04 any size, any shape etc as per design and drawing.
Contractor shall provide shop drawing based on design for approval. Work shall
be carried out as per approved shop drawing.
For payment purpose, out to out dimension of metal elements before CNC
cutting shall be consider for payment.
116 13.05 SOR RA - Stainless steel (304 grade) - Fabrication works Kg 1,479.00 755.33
13.05 Providing and fixing stainless steel (Grade 304) gratings, bollards, frames, guard
bars, ladders, brackets, corner guards, skirtings, kick plates, manhole covers,
floor raceway covers, thresholds, signages, and similar works made of hollow
tubes, channels, angles, flats, plates, etc. This includes welding, bending,
grinding, buffing, polishing, and forming curvature where required. The
installation shall include necessary stainless-steel nuts and bolts, complete, with
all necessary accessories, SS 304-grade dash fasteners, castor wheel, and
adhesive of an approved make, with stainless steel bolts of the required size.
These elements will be fixed on the top of the floor or the side of the waist slab
with suitable arrangements as per the approval of the Engineer-in-Charge,
applicable to all floors, heights, and levels.
The Contractor shall submit shop drawings based on the intent drawings for all
structural elements, along with design calculations to ensure the stability of the
elements. Approval of the shop drawings must be obtained before the execution
of work. This item excludes SS modular railing systems. The weight (by
theoretical means) of SS members/structure/element shall be considered for
payment without considering wastage, fixing accessories such as nuts, bolts,
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
117 13.06 MRA -13.06 SS modular system railing Kg 420.00 788.36
Providing and fixing a stainless steel (Grade 304) modular knock down railing
(threaded system) and baluster system of an approved make for stair railings,
handrails, bump rails, guard rails, or similar applications. The system shall
consist of a knock-down design in linear or curved shapes, made from hollow or
solid sections such as tubes, squares, flats, plates, bars, etc., with base plates,
cover caps, finishing accessories, infilled holding brackets, and other necessary
fixing accessories. The design can accommodate any type of configuration,
shape (plain/curved), size, and finish as per the approved drawings, etc.,
complete, for all floors, all heights, all levels, as directed by the Engineer-in-
The railing can be top-mounted or side/wall-mounted and shall be fixed with SS
304 grade anchor fasteners of the required size, based on the approved fixing
position. On-site welding or fabrication shall not be permitted. Samples shall be
approved prior to execution. The Contractor shall submit shop drawings based
on the concept drawings and site measurements. Upon approval of the shop
drawings, the Contractor shall arrange a mock-up of the railing system (2 or
nos.) of the required length as directed by the Engineer-in-Charge. The
Contractor shall protect the railing system until the Project is handed over.
The rate includes all fixing accessories and types of fasteners. However, for
payment purposes, only the theoretical weight of the stainless-steel members
shall be considered, excluding fixing accessories such as nuts, bolts, fasteners,
etc. The SS modular railing system shall be installed by an approved fabricator
as specified in the preferred make list in the agreement.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
118 13.07 MRA -13.07 Providing and fixing Brass fabrication work/casting work for jyot, dhaja dand, Kg 500.00 3,051.31
kalash, railing, gate, grill, Q-manager post, skirting, temple pole, kick plate, mop
plate, inlay strip for flooring and wall panelling work or similar elements (factory
fabricated/ casting and finished only fixing at site) of any shape, any size, any
finish, including ornamentle work made of Hollow sections, channels, plates,
bar, flat, angle, chain etc., including cutting, bending, welding, grinding, buffing,
polishing and making curvature (wherever required) and fitting the same with
necessary brass nuts and bolts complete, i/c fixing the elements with necessary
accessories & Brass/ SS316 dash fasteners, brass bolts etc., of required size
with suitable arrangement as per approval of Engineer in charge for all level, all
height. Contractor shall prepare and submit the shop drawing base on concept
drawing and as per site measurement. As per approved shop drawing,
contractor shall arrange mock up of brass element (2 or 3 no) in required size as
directed by Engineer in charge. Architect reserves the right to reject part of full
work if it is non compliance of the design intent. Brass shall be heavy and good
quality clear satin finish with PVD Coating. (for payment purpose only weight of
brass members shall be considered excluding fixing accessories such as nuts,
bolts fasteners etc.). Any visible surface of fastner, screws or bolt of other
material than brasss shall be finished with brass PVD coting (matched with
The joineries of brass fabrication work shall be executed with slip joint, threaded
connections, alen key type fixing etc. No welding shall be permitted on site, and
if required it shall be approved prior to execution. the contractor shall protect all
brass work properly uptill handeling over the project by any means.
TOTAL CARRIED OVER TO SUMMARY
14.00 EXTERNAL DEVELOPMENT WORK
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
1) All stones shall be free from cracks, lines, stains, white efflorescence spots
and even in shade for all kind of stonework.
2) All stones shall be selected and sorted for uniform colour, figure and
thickness and approved by the Engineer-in-Charge prior to procurement.
3) All stones shall be from the same lot and/or source (stone quarry) for the
same kind of work and as approved by the Engineer-in-Charge.
4) The Contractor shall apply Stone impregnation primer/sealer coat on back
side and all edges (after cutting and finishing of the stones as per size) of the
stones of an approved make. Stone impregnation primer/sealer coat shall be
water based with a pH value of 7 to 10, in minimum of two coats as per the
manufacturer's specifications and as directed by the Engineer-in-Charge. No
extra shall be paid for the same.
5) The Contractor shall prepare and submit shop drawings for all kinds of
stonework with sub base/framing work/fixing arrangement/joinery, with all
required fasteners and get approval from the Engineer-in-Charge.
6) Mock ups/samples shall be prepared as per the approved shop drawings and
shall get approved by the Engineer-in-Charge before execution of work.
7) All adhesives and sealants shall be with low VOC and lead free with
acceptable VOC content as per the Green Building requirements.
8) Stonework shall be carried out for all floors, all levels, all heights, all places
including loading, unloading, stacking, transporting, hoisting, erecting by any
means (mechanical or manual).
9) All type of stones shall be cut to size with water jet cutting/laser cutting/CNC
machines according to the design and shape for achieving the best
workmanship as per the shop drawings.
10) Granite shall be mirror polished/flame finished/sand blasted/ river washed
or any other as per the specifications.
11) All type of stone/stone elements shall be factory cut and factory finished.
The finish on any stonework shall be as per the satisfaction of the Engineer-in-
Charge. If required, final finish/touch-up shall be executed at site as per the
direction of the Engineer-in-Charge.
12) Structural stability of the solid stonework shall be the responsibility of the
13) The Contractor shall make necessary provision for any services cut-
outs/other required provisions, co-ordinate with all services and making good
etc., complete.
14) All visible surfaces of the stonework shall have the same finish.
118 14.01 SOR RA - Sub grade preparation and consolidation Sqm 24,948.00 118.68
14.01 Preparation and consolidation of sub grade with power road roller of 8 to
tonne capacity after excavating earth to an average of 22.5 cm depth, dressing
to camber and consolidating with road roller including making good the
undulations etc. and re-rolling the sub grade and disposal of surplus earth with
lead up to 50 metres.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
Box cutting for making a base for road work, pavement works walkway, etc in all
kind of soil, or any other material to give proper slop and camber by any means
including getting out the excavated material, and stacking material, dressing of
the sides, and disposal of excavated earth for all lead within site area/ plot
boundary, etc complete as directed by engineer-in-charge.
120 14.03 SOR RA - Embankment construction with selected approved good soil from any source Cum 5,789.00 1,106.35
14.03 outside the site area at OMC to min. 95% proctor density by using vibratory roller
for compaction. The rate includes royalty charges for material, transportation to
site for all lead and lift, laying in max. 300 mm layers, watering, rolling &
compacting the same as per the specifications, drawings and as directed by the
Engineer-in-charge. Method statement shall be prepared and submit to engineer
incharge for confirmation before starting of execution work.
14.04 Construction of granular sub-base by providing close graded Material
conforming to Grade-I, II or III (size range 26.5 mm to 0.075 mm - respective as
per grade) having CBR Value-30 to 20 as per respective grade specifications,
mixing in a mechanical mix plant at the optimum moisture content (OMC),
carriage of mixed material by tippers to work site, for all leads & lifts, spreading
in uniform layers of specified thickness with motor grader on prepared surface
and compacting with vibratory power roller to achieve the desired density, The
work shall be completed in accordance with the specifications and as directed
by the Engineer-in-Charge.
14.05 Providing, laying, spreading and compacting graded stone aggregate (size
range 53 mm to 0.075 mm) to wet mix macadam (WMM) specification including
premixing the material with water at optimum moisture content (OMC) in for all
leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base
/ base course on well prepared surface and compacting with vibratory roller of
to 10 tonne capacity to achieve the desired density, complete, in accordance
with the specifications and as directed by the Engineer-in-Charge.
123 14.06 SOR RA - Primer Coat: Sqm 9,646.00 51.71
14.06 Providing and applying primer coat using hot straight run bitumen of
grade VG - 10, including heating the bitumen, spraying the bitumen
with mechanically operated spray unit fitted on bitumen boiler,
cleaning and preparing the existing road surface as per
specifications :
On W.B.M./GSB surface @ 0.75 Kg I sqm
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
14.07 Providing and laying dense graded bituminous macadam with 100-120 TPH
batch type HMP of grade VG30 producing an average output of 75 tonnes per
hour using crushed aggregates of required grading, premixed with bituminous
binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to
work site for all lead and lift, laying with a hydrostatic paver finisher with sensor
control to the required grade, level and alignment, rolling with smooth wheeled,
vibratory and tandem rollers to achieve the desired compaction etc complete as
per MoRTH 5th Revision complete in all respects. and as directed by Engineer
125 14.08 SOR RA - Tack Coat: Sqm 17,016.00 11.87
14.08 Providing and applying a tack coat with bitumen emulsion using emulsion
pressure distributor at the rate of 0.25 kg per sqm on a prepared
bituminous/granular surface cleaned with a mechanical broom.
126 14.09 SOR RA - Bituminous Concrete (Asphaltic Concrete) - Providing and laying bituminous Cum 853.00 9,263.16
14.09 concrete with 100-120 TPH batch type hot mix plant of grade VG30 producing
an average output of 75 tonnes per hour using crushed aggregates of the
specified grading, premixed with a bituminous binder @ 5.5 per cent of the total
mix, along with filler, transporting the hot mix to the work site, laying with a
hydrostatic paver finisher with sensor control to the required grade, level and
alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve
the desired compaction and grading, in accordance with MoRTH 5th Revision
specifications, and completed in all respects.
127 14.10 SOR RA -14.1 Scarifying/Milling - Road surface Sqm 7,375.00 93.17
Milling the existing bituminous pavement up to a depth of 100 mm by milling
machine in a single cutting depth to make a uniform surface without disturbing
the base, cleaning the milled surface as to avoid slippery including all other
incidential charges and other unforeseen charges etc. disposing of all materials
for at non objectionable place etc. complete as directed by Engineer-in-charge.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
128 14.11 SOR RA - CC Pavement/CC driveway - M 30: Cum 606.00 6,941.33
14.11 Providing and laying cement concrete pavement of mix M-30 with ready mixed
concrete from a batching plant. The ready mixed concrete shall be laid and
finished with vacuum dewatering process and power floater treatment in roads,
pavements, platforms, floors etc, well compacted, mechanically vibrated with a
screed vibrator, finished to required levels, floated with neat cement and power
trowelled to get the desired smooth finish/ broom finish as per the design, over a
levelling course, including cast in panel, MS channel or box shuttering, curing
etc as directed by the Engineer-in-Charge.
Contraction joints to be formed at every 5m distances, by creating grooves with
a mechanical saw within 48 hrs. Grooves/sawed joints/ longitudinal joints shall
be 6mm width and 40 mm depth min (1/3 rd depth of the pavement) as shown in
the drawings. LDPE sheets (min 125 gsm) shall be laid below the pavement.
The rate shall be inclusive of labour, making the grooves, filling the groves with
an approved sealant and backer rods, provision of expansion joints, LDPE
sheets and machinery cost etc., complete, and as directed by the Engineer-in-
Charge. Reinforcement, if required, shall be paid under the relevant Tender
item. Mock ups for the concrete pavement work (for brooming pattern and joints
as per the drawing) shall be prepared by the Contractor and shall be approved
by the Engineer-in-Charge in all respects prior to mass execution works. The
Engineer-in-Charge reserves the right to reject a part or all sub-standard work or
work that is not as per the approved sample or as per the mock up. Actual
volume of laid concrete shall be measured for payment without considering
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
129 14.12 MRA -14.12 Kota stone - 25mm thick - textured finish - for paving/flooring etc.: Sqm 50.00 1,314.92
Providing and laying 25 mm thick Kota stones of any type, with any finish—such
as river washed, flamed, leather, linen, sandblasted, or similar—in any uniform
shade, size, and shape for flooring, platforms, pavements, stair treads, and
similar works, in the required design and patterns as per the drawings. The
stones shall be laid over an average 40 mm thick cement mortar bedding of 1:4
(1 cement: 4 sand), with cement mortar of 1:2 (1 cement: 2 sand) applied to the
sides of the stones. Grooves of a minimum 5mm size shall be provided, and
pointing, finishing, and filling of grooves with cement mortar and matching
pigment shall be done as per the approved sample. The work includes curing
and cleaning with a wire brush to remove excess cement from the sides of the
stones, to the satisfaction of the Engineer-in-Charge. For stair treads, Kota
stones shall be used in single, continuous lengths. No mortar should be visible
on the surface.
Loose samples of the Kota stones and the laid mock-up shall be approved by
the Engineer-in-Charge before mass execution. The exposed edges of the
stones shall have rounded corner treatment with even thickness and a finish
matching the stone finish, as per the drawing and as directed by the Engineer-in-
The rate shall include the cost of Kota stones (as per the approved sample),
cement mortar bedding, cement slurry, matching pigment, and all labour costs.
The Contractor shall prepare samples and patterns and obtain approval from the
Engineer-in-Charge before executing the work. The architect and Engineer-in-
Charge reserves the right to reject any part or all of the work if it is substandard
or does not conform to the approved sample as per the mock-up. The area of
laid Kota stone flooring shall be measured for payment without considering any
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
130 14.13 MRA -14.13 Kota stone - 40 mm thick - textured finish - for coping/tread/seating etc.: Sqm 66.00 1,537.27
Providing and laying 40 mm thick Kota stones of any type, with any finish—such
as polished, river washed, flamed, leather, linen, sandblasted, or similar—in any
uniform shade, size, and shape for stair treads, coping, seating on bench and
similar works, in the required design and patterns as per the drawings. The
stones shall be laid over an average 40 mm thick cement mortar bedding of 1:4
(1 cement: 4 sand), with cement mortar of 1:2 (1 cement: 2 sand) applied to the
sides of the stones. Grooves of a size as per drawing shall be provided, and
pointing, finishing, and filling of grooves with cement mortar and matching
pigment shall be done as per the approved sample. The work includes curing
and cleaning with a wire brush to remove excess cement from the sides of the
stones, to the satisfaction of the Engineer-in-Charge. For stair treads, coping,
and seating on a bench, Kota stones shall be used in single, continuous lengths.
No mortar should be visible on the surface.
Loose samples of the Kota stones and the laid mock-up shall be approved by
the Engineer-in-Charge before mass execution. The exposed edges of the
stones shall have rounded corner treatment with even thickness and a finish
matching the stone finish, as per the drawing and as directed by the Engineer-in-
The rate shall include the cost of Kota stones (as per the approved sample),
cement mortar bedding, cement slurry, matching pigment, and all labour costs.
The Contractor shall prepare samples and patterns and obtain approval from the
Engineer-in-Charge before executing the work. The architect and Engineer-in-
Charge reserves the right to reject any part or all of the work if it is substandard
or does not conform to the approved sample as per the mock-up. The area of
laid Kota stone flooring shall be measured for payment without considering any
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
Granite - textured finish - external flooring:
Providing and laying textured finish granite stone flooring of required size,
shape, of an approved type, shade and finish for driveways, plazas, drop off
points, stair treads, coping, etc. with even thickness at the exposed edges, over
40 mm (average) thick base of cement mortar 1:4 (1 cement : 4 sand), sides
covered with cement mortar 1:2 (1 cement : 2 sand), including cutting grooves of
minimum 5mm size, pointing, finishing and filling the grooves with cement
mortar and matching pigment as per the approved sample, including curing and
cleaning with a wire brush to remove excess cement on the sides of the stones,
up to the satisfaction of the Engineer-in-charges etc., as per the drawings and
as directed by the Engineer-in-Charge. No mortar is to be visible on the surface.
Exposed edges of the stones shall have rounded corners in even thickness and
finished the same as the stone finish, as per the drawings and as approved and
directed by the Engineer-in-Charge. Granite stones shall be used in single
pieces for staircase treads. The loose sample of granite and laid mock-up shall
be approved by the Engineer-in-charge before mass execution. The architect
and the Engineer-in-charge reserves the right to reject part or all of the work if it
is substandard not as per the approved sample or per mock-up. The area of
laid granite flooring shall be measured for payment without considering any
131 14.14 MRA -14.14 A) 50 mm thick textured finish granite stone flooring Sqm 5,656.00 8,284.83
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
132 14.15 MRA -14.15 Solid granite stonework: Cum 39.00 1,10,950.87
Providing and fixing machine cut plain solid granite stonework (without carving),
made out of any type of granite stone in various types of stone elements, e.g.
kerbs, bollards, coping, solid steps, benches, solid seating, flooring, etc. in the
required size and thickness as per the approved drawings and approved
samples. The exposed surface of the stones shall be with machine cut
finished/polished/flamed finish/sand blasted/river washed, as per the drawing
and as approved by the Engineer-in-Charge. The stones shall be chamfered at
the edges as per the drawings (if required). Any type of stone elements shall be
fixed with cement mortar 1:3 (1 cement: 3 coarse sand)/ready mix mortar/stone
fixing adhesives, including making joints with or without grooves and joined with
cement mortar and matching pigment, mechanical systems, if required (like
stone dowels, SS 316 anchor fasteners, cramps and pins), including pointing
with resin based cementitious grout of a matching shade/white cement mortar
1:2 (1 white cement : 2 stone dust of same stone), with an admixture of pigment
matching the stone shade.
The rate shall be inclusive of all materials, labour, transportation, hoisting in
position (by any means), all type of fixing materials and fixing systems, pointing,
scaffolding, etc., complete, for all floors, all levels and as directed by the
Engineer-in-Charge. Civil work (i.e. excavation, base PCC) for the base shall be
paid under the relevant Tender item.
For payment, the dimensions of the circumscribing rectangles of the dressed
solid stones as used in the work shall be measured correct to a cm and cubical
content shall be calculated correct to two decimal places in cum. The Contractor
shall prepare samples and get approval from the Engineer-in-Charge before
execution of the work. The architect and the Engineer-in-Charge reserves the
right to reject part or all of the work if found substandard or not as per the
approved sample/mock-up.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
Mandana stones - for flooring - fixing with adhesive
Providing and laying machine-cut Mandana stones of specified thickness,
specified finish, any shade (uniform), any size, and any shape for flooring, Otta,
platform, sill, trades of steps, copping, seating or other similar elements in
required design and patterns as per the drawings, over 40 mm (average) thick
base of cement mortar 1:4 (1 cement : 4 sand), sides covered with cement
mortar 1:2 (1 cement : 2 sand), including cutting grooves of minimum 5mm size,
pointing, finishing and filling the grooves with cement mortar and matching
pigment as per the approved sample, including finishing, rubbing, curing,
polishing, cleaning, protection, scaffolding, wastage, etc. all complete, for all
levels, all floors, all heights, as directed by the Engineer-in-Charge.
The rate shall be inclusive of Mandana stones (as per the approved sample),
mortar for fixing, cement slurry, matching pigment, all labour, etc complete. The
Contractor shall arrange loose samples for approval from the Engineer-in-
Charge before mass execution. The architect and the Engineer-in-charge
reserves the right to reject part or all of the work if it is substandard not as per
the approved sample or per mock-up. The joints between the treads and the
risers shall be finished as per the drawing. the Mandana stone shall be in single
peice for any size (up to 1.5 m length, width as per design intent) as per design
intent. Mandana stone slabs to have pencil corners/rounded edge, bull nose
edge or other approved edge and polished at the all exposed edges in even and
uniform thickness. No mortar shall be visable on the surface of laid stone.
The actual laid area of the Mandana stones shall be measured for payment
without considering any wastage.
132 14.15 MRA -14.15 A) 40 mm thick Mandana stone flooring Sqm 50.00 2,261.29
133 14.16 MRA -14.16 Kota stone Cobble Stone - Approx. 60mm thick - Textured Finish Sqm 1,744.00 6,894.71
Providing and laying 60mm thick Rajula cobble stones of the required size
(approx. 100mm ) machine cut (box cut) Kota stone cobble stone (in any pattern
with any shade ) of any finish, i.e. river wash, flamed finish, leather finish, linen
finish, sandblasted finish or similar finish in any shade (uniform), for flooring,
pavement, etc in required design and patterns as per the drawings, laid over
average 40 mm thick (average) cement mortar 1:4 (1 cement: 4 sand) bedding.
The joints between cobble stones shall be filled and flush-pointed with 10 mm
wide cementitious grout of approved make as per manufacturer's specification,
pre-pigmented to match the required shade as per design intent and as per
approved sample and direction of Engineer-in-charge. Sample and mockup
shall be approved by Engineer-in-charge before mass production. Rate shall be
inclusive of kota cobble stone (as per approved sample), fixed with cement
mortar bedding, cement slurry, matching pigment, Cementition grout, all labour,
pointing, curing, rubbing, finishing and cleaning up to the satisfaction of the
Engineer-in-charge. The area of laid kota cobble flooring shall be measured for
payment without considering any wastage.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
134 14.17 MRA -14.17 Precast cement concrete paver blocks - 60mm thick, M-35 Grade Sqm 2,149.00 959.20
Providing and laying factory-made, chamfered edged, shot blasted/sand blasted
finished, non-interlocking square or rectangular paver blocks of an approved
make, in any size, any shade, any pattern, or any colour. The paver blocks shall
have a thickness of 60 mm and a minimum M-35 grade, machine-made and
factory-finished, suitable for footpaths, parking areas, service lanes, and similar
applications as specified in the drawings.
This includes providing and laying a 50 to 80 mm thick average bedding layer of
coarse sand below the paver blocks as per the required grading and
specifications. The paver blocks shall be laid in line and level, then mechanically
compacted. Cutting of the paver blocks, if required, shall be done by mechanical
means only. Any necessary re-laying shall be performed to ensure proper
compaction. Payment will be based on the actual area laid, with no allowance
for wastage. Samples and mock-ups must be approved before execution.
Damaged blocks shall not be used, and any rejected samples and mock-ups will
not be payable.
135 14.18 MRA -14.18 Precast cement concrete paver blocks - 80mm thick, M-40 Grade Sqm 1,756.00 1,082.06
Providing and laying factory-made, chamfered edged, shot blasted/sand blasted
finished, non-interlocking square or rectangular paver blocks of an approved
make, in any size, any shade, any pattern, or any colour. The paver blocks shall
have a thickness of 80 mm and a minimum M-40 grade, machine-made and
factory-finished, suitable for footpaths, parking areas, service lanes, and similar
applications as specified in the drawings.
This includes providing and laying a 50 to 80 mm thick average bedding layer of
coarse sand below the paver blocks as per the required grading and
specifications. The paver blocks shall be laid in line and level, then mechanically
compacted. Cutting of the paver blocks, if required, shall be done by mechanical
means only. Any necessary re-laying shall be performed to ensure proper
compaction. Payment will be based on the actual area laid, with no allowance
for wastage. Samples and mock-ups must be approved before execution.
Damaged blocks shall not be used, and any rejected samples and mock-ups will
not be payable.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
136 14.19 MRA -14.19 Pre-cast concrete kerb Cum 623.00 16,743.98
Providing & fixing Minimum M25 grade of customized, factory-made precast
concrete exposed finish/ fair finish kerb stones as per design intent of approved
make and as per sample approved of any sizes, any shape. Kerb shall have
chamfered type/ pencil corner edges. Kerbs shall be fixed on the base PCC with
cement mortar 1:2 including flush pointing in CM (1:2) for all joints of the
kerbstones, curing, etc. complete. The rate shall also include erecting and fixing
in position all varieties/ shapes of kerbs (i.e. radius kerbs, corner kerb, quadrant
kerbs, drain out kerb, flat kerb, parking edge kerb, ramp kerb etc) as per
drawing. Precast kerb shall be protected with good quality plastic sheet for
protection against bituminous/ concrete work. The rate shall include the joining,
curing, finishing, protection etc complete as directed by the engineer in charge.
Actual installed kerb volume shall be measured in payment.
Sample and Mock-up shall be carried out as suggested by the Architect and as
directed by the Engineer in charge. The loose sample of kerb and laid mockup
shall be approved by the Engineer-in-charge before mass execution. Architect
reserves right to reject part or all work of sub standard or not in confirmation to
approved sample as per mock up. Sample and mock shall not be payable if
rejected. The actual laid volume shall be measured for payment without any
Base PCC, excavation (if required) and other required civil work shall be paid in
relevant items. damaged block shall not be used in laying.
137 14.20 MRA -14.20 Precast RCC bench: No. 54.00 9,384.92
Providing, hoisting, stacking and arranging in position precast, exposed fair
finished bench, made of minimum M-25 grade RCC, of an approximate size
1500mm x 450mm x 380mm (final size and shape as per the drawing) with
40mm thick top polished Kota stones, laid on cement mortar, with the provision
of up to 10mm groove as per the drawing and as per the approved sample. All
exposed edges of the Kota stones shall be uniform, with rounded corners, even
and polished as directed by the Engineer-in-charge. The Contractor shall submit
a methodology for the erection of the precast bench and get approval from the
Engineer-in-Charge. Installed precast bench shall not be damaged in any way.
The sample shall be approved by the Engineer-in-charge before mass
production. The rate shall include for erecting and fixing the precast bench in
position as per drawing, finishing, necessary TMT reinforcement bars etc.,
complete, as directed by the Engineer-in-Charge. The location and type of each
lifting hook for erecting the bench shall be as per the design intent and approved
by the Engineer-in-Charge.
The Architect and The Engineer-in-Charge reserves the right to reject part or all
the work found to be sub standard or not as per the approved sample or the
mock up. The cost of the sample and mock-up shall not be payable if rejected or
cast in aother location (not in scope of work area).
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
138 14.21 MRA -14.21 Pre cast concrete cylindrical bollards: No. 319.00 1,978.34
Providing, hoisting, and arranging in position, exposed fair finished, factory
made pre-cast bollard of size approximately 800mm high and 280mm Dia, as
per the design intent, of an approved make, made of minimum M-30 grade
reinforced cement concrete.
The rate shall include curing, finishing, cost of excavation, M15 grade base
PCC, reinforcement, rendering (if required), transportation, loading and
unloading charges, etc., complete, as directed by the Engineer-in-Charge.
Precast bollards shall have MS hooks & safety chain between two bollards as
per the design intent if required. The weight of the hooks and chain shall be paid
under the relevant Tender items.
The Contractor shall submit a methodology for the erection of the bollards and
get approval from the Engineer-in-Charge. Installed precast bollards shall not
be damaged in any way.
Sample shall be approved by Architect and the Engineer-in-Charge before mass
production. The Architect and the Engineer-in-Charge reserves right to reject
part or all of the work if found to be sub standard or not as per the approved
sample and mock up. The samples and mock-up shall not be payable if rejected
or cast in another location (not in scope of work area).
139 14.22 MRA -14.22 Precast concrete planter: No. 117.00 6,632.77
Providing, hoisting, and arranging in position, precast exposed/fair finished,
factory made concrete planter, of approximate size 800mm x 600mm x 580mm
(final size, shape, and type as per the drawing and the design intent), of an
approved make, made of minimum M-25 grade reinforced cement concrete.
The rate shall include for erecting and fixing the planter in position as per the
drawing, curing, finishing, necessary TMT reinforcement bars etc., complete, as
directed by the Engineer-in-Charge.
The Contractor shall submit their methodology for erection of the planter and get
approval from the Engineer-in-Charge. The installed planter shall not be
damaged in any way.
A sample shall be approved by the architect and the Engineer-in-Charge before
mass production. The architect and the Engineer-in-Charge reserves right to
reject part or all of the work which is found to be sub standard or not as per the
approved sample and the mock up. The sample and mock shall not be payable
if rejected or cast in another location (not in scope of work area).
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
140 14.23 MRA -14.23 Precast elements for miscellaneous items: i.e. light pole cover, base of Cum 94.00 38,636.59
dustbin, saucer drain, etc
Providing, hoisting and fixing fair finished precast concrete of M 25 grade in
items such as light pole covers, bases of dustbins, saucer drains, coping etc of
an approved make and as per the sample, including the cost of required
centring and shuttering and arranging the precast members in position with
required joining arrangements, MS studs or anchor/bolting with grouting etc.
complete, all materials, loading, transportation, unloading, tools, tackle,
scaffolding, machinery, equipment, for all levels, for all heights/depths, and as
directed by the Engineer-in-Charge. The Contractor shall provide loosed
samples of each element at locations suggested by the Engineer-in-Charge for
review and approval from the Engineer-in-Charge before mass production/
execution. The architect and the Engineer-in-Charge reserves the right to reject
part or all of the work found to be sub standard or not as per the approved
sample and mock up. The Contractor shall prepare coordinated shop drawings
for all the elements with all members including provisions for all services/other
allied civil works and get approval from the architect and the Engineer-in-
If required, excavation and base preparation work shall be paid under relevant
Actual volume of installed precast elements shall be measured for payment.
Sample and mock shall not be payable if rejected or casted in other location (not
in scope of work area).
141 14.24 MRA -14.24 MS Cylindrical Bollard/ delineators Kg. 1,140.00 158.82
Providing and placing in position MS Bollard / delineators of any size, any
shape, in required thickness as per drawing (factory made). Bollard/delineators
shall be made of MS section with base plate and bolts. Bollard/delineators shall
be finished with two or more coats of PU paint (min 60 DFT) of approved make
and shade over two coat of anti-corrosive epoxy base primer, as per
manufacturer's specification. Retro reflective strips of approved make shall be
fixed on bollard/delineators after painting work as per drawing.
Bollard /delineators shall be fixed on concrete base with required anchor
fastener, bolts, other accessories etc with required civil work.
Rate shall be inclusive of all material (MS work, PU paint, reflective tape,
fastener, accessories etc) but excluding the cost of required civil work (i.e.
excavation, filling, concrete base etc) as suggested by Engineer in charge.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
Providing and fixing in position metal dustbin (readymade factory product) for (dry + wet
external use, having capacity approximate (40+40) Litre (dry + wet) dustbin set bin)
of approved make and as per approved sample. Dustbin shall be separate for
Dry and wet waste with logo of client. Both bin of dustbin shall have swing type
arrangement for functioning of dustbin.
sample shall be approved by Architect and Engineer in charge before mass
production. Architect reserves right to reject part or all work of sub standard or
not in confirmation to approved sample as per mock up. Sample and mock shall
not be payble if rejected or casted in other location (not in scope of work area).
142 14.25 MRA -14.25 FRP Recessed Manhole cover: No. 143.00 9,232.41
Supply and installation of a heavy-duty double-sealed FRP manhole cover with
a frame, having a capacity of 25MT, matching the shade and design of the
surrounding pavement. The design shall conform to EN - 124:1994 as per
approved make, with a clear opening size of 600mm x 600mm and a recess
depth of 60mm, with the Client’s logo, etc., complete, as approved and directed
by the Engineer-in-Charge.
The frame shall be embedded in M25 grade concrete, with the top level of the
frame flush with the road surface. The frame and cover shall include four lifting
keys, with a suitable lifting arrangement. The rate shall be inclusive of the cover,
frame, and concrete work necessary for fixing the frame. A sample and mock-up
shall be submitted for approval by The Architect and The Engineer-in-Charge
prior to execution.
143 14.26 MRA -14.26 Perforated precast concrete drain cover: Sqm 164.00 3,753.97
Supply and installation of 100 mm thick factory-made, machine-batched, and
machine-mixed perforated precast fair-finish RCC covers with frames for
drains/catch pits on footpaths of various sizes. The covers shall be made of M-
25 grade cement concrete and reinforced with 8 mm Dia TMT bars of Fe
grade, placed at a maximum of 100 mm c/c in both directions. The finished
surface shall be treated with neat cement punning.
All edges of the covers shall be properly encased with a 1.6 mm thick, 100 mm
wide MS sheet, painted with a priming coat. The reinforcement bars shall be
welded at the edges to the MS sheet. Two 12 mm Dia bars shall be provided for
hooks, etc., including the cost of, cartage, all leads and lifts, and handling at the
site etc., all complete, as per the directions of The Architect and The Engineer-in-
Charge. A sample and mock-up shall be submitted to the Architect and The
Engineer-in-Charge for approved prior to execution.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
144 14.27 MRA-206 Heavy duty FRC (HD35) manhole cover with frame: No. 126.00 4,809.77
Supply and installation of heavy duty FRC (HD35) manhole cover with frame,
featuring a clear opening of either 600mm x 600mm or 600mm in diameter as
per approved make. The frame shall include a 100 x 2mm MS flat all around,
with a 16mm diameter plain round bar for lifting the cover, fitted with approved
The upper periphery of the frame shall be protected with a 25 x 3 mm wide MS
flat, hot dip galvanized, and well embedded in concrete to protect the edges.
The frame shall be fixed with cement mortar or cement concrete, depending on
the site conditions, as per the approved drawings and under the direction of the
Engineer-in-Charge. A sample and mock-up shall be submitted to the Architect
and The Engineer-in-Charge for approved prior to execution.
145 14.28 26163 Supplying and fixing Cat Eye (Stimsonite) made out from Acrilo beautile sterine No. 2,424.00 375.72
injuction high compressed molding with reflector made of MMC (prismatic type
of size as per design intent ) with each unit for foxing. (High intensity grade)
146 14.29 26161 Road marking strips: Sqm 3,581.00 367.72
Supply and application of 2.5 mm thick road marking strips (retro-reflective) or
graphics/letters/arrows etc. in specified shades/colours, using hot thermoplastic
materials. The application shall be carried out with a fully or semi-automatic
thermoplastic paint applicator machine, equipped with a profile shoe, glass
beads dispenser, propane tank heater, and profile shoe heater, operated by a
skilled technician.
The work includes preparing the road surface by cleaning it of all dirt, seals, oil,
grease, and foreign materials, as well as all associated costs for materials,
labour, tools, and plant. The application shall be done on concrete or tar road
surfaces in accordance with the applicable specifications and as directed by the
Engineer-in-Charge.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
147 14.30 MRA-206 Terrazzo on precast bench 35.00 6,038.89
Providing, applying and polishing of self levelling type factory pre-mixed terrazzo
of an approved make, for horizontal, vertical, inclined, or any shape, with all
exposed edges rounded, 10 to 12 mm thick, in an approved base colour and
with selected and approved coloured natural stone aggregates including
densification and sealing as per following:
1) Surface preparation - The surface shall be without any pot holes, cracks or
any other defects. If any defects found, proper repair work shall be carried out,
i.e. grouting etc. The surface shall be in proper level
2) Provision of aluminium divider strips for joints as required as per the drawing.
3) Primer application as per the manufacturer's specifications
4) Application of terrazzo ready-mix in the required thickness in proper level and
with the provision of grooves
5) Proper curing as per manufacturer's specifications
6) Use of suitable terrazzo grout of a matching colour as the terrazzo and
densifier as per the manufacturer's specifications Sqm
7) Carrying out polishing on the terrazzo, to provide a mirror polish finish, as per
the approved sample and as per the manufacturer's specifications.
8) Application of a water resistant non film forming sealer of the same
manufacturer as the terrazzo pre-mix, as a sealer for the polished surface.
9) Manufacturer's application method shall be required to be followed at each
stage to get the desired finish.
10) Cleaning off and protection after each stage of works as required.
The Contractor shall submit their construction methodology for approval by the
Engineer-in-Charge. Terrazzo applied area shall be measured for payment.
Loose sample for material and required number of mock-ups for the terrazzo
work shall be prepared by the Contractor and get approved from the Architect
and The Engineer-in-Charge prior to mass execution works. The Engineer-in-
Charge reserves right to reject part or all of the work if found to be sub-standard
or not as per the approved sample and the mock-up.
148 14.31 (GWSSB base) Hume pipe for Tree Pit Rmt 304.00 3,731.65
RA Providing and fixing RCC NP3 class hume pipe of 900mm internal dia. and
required length in single piece or two circular half for tree pit shall be placed in
excavated pit as per drawing and as directed by engineer in charge. Rate shall
be inclusive of material, labour for cutting,excavation, placing in position etc
complete. After Execution of Tree pit, If it is filled with debries or C&D waste due
to any reason, It shall be removed without any extra cost before filling garden
soil in tree pit. Tree pit shall be filled with garden soil only however garden soil
filling shall be paid in relevant tender item.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
149 14.32 MRA-206 FRP tree-pit cover: No. 581.00 15,737.32
Providing and fixing a solid tree pit cover around the tree pit, made of FRP, of
approximate up to 1200mm Dia and 40-70 mm thickness with fixing
arrangement, with the base structure of an approved make and shade, as per
the design intent, including fixing, as per the drawing etc., complete, as directed
by the Engineer-in-Charge. The sample and the mock-up shall be approved by
the Engineer-in-Charge before execution.
TOTAL CARRIED OVER TO SUMMARY
15.00 MISCELLANEOUS ITEM
97 7.21 MRA -7.21 Cleaning with Chemicals Sqm 3,802.00 191.45
Cleaning any surface/any element, and removing dirt, dust, bird droppings,
grease, oil, algae, fungus, monkey beats, vegetable growth, etc. or similar, up to
the satisfaction of the engineer in charge including washing the surface with a
chemical cleaning agent (if required) as approved by Engineer-in-charge, of
approved make and manufacturer, filling chemical in gaps of structure (where
vegetable roots to be removed) to stop the vegetable growth again, cleaning
with a machine operated water jet or other any means, without causing any
damage to the surface/ element/ surrounding and finally washing the surface
with clean water with the help of pressure jet machine or any other means,
complete in all respect, including taking all precautions to safeguard any
elements of structure, etc. by suitable covering so as to avoid any damage to the
building/ structure, all as per direction of Engineer-in-charge. Item shall be
executed only after prior approval of the Engineer incharge regarding where it
shall be required to execute for all floor, all levels, all depth etc. complete.the
Elevation area of the element shall be measured for the payment. contractor
shall get approval of area of cleaning for payment from the engineer in charge
before executing the work.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
98 7.22 MRA -7.22 Scaffolding system Sqm 3,526.00 278.91
Providing and fixing double scaffolding system (cup lock type) on the exterior
side of building/ structure, any height, above ground level, including additional
rows of scaffolding in stepped manner as per requirement of site, made with
40mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical
tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S.
clamps and staircase system in the scaffolding for working platform etc. and
maintaining it in a serviceable condition for execution of work of cleaning and/ or
pointing and/ or applying chemical and removing it thereafter. The scaffolding
system shall be stiffened with bracings, runners, connecting with the building
etc, wherever required, if feasible, for inspection of work at required locations
with essential safety features for the workmen etc., complete as per directions
and approval of Engineer-in-charge. Note:- (1) The elevational area of the
scaffolding shall be measured for payment purpose. (2) The payment will be
made once only for execution of all items for such works.
TOTAL CARRIED OVER TO SUMMARY
16.00 DISMANTLING WORKS
150 16.01 20001B Dismantling of existing plain concrete work of any grade and any type, using Cum 113.00 639.72
either mechanical or manual methods, as advised by the Engineer-in-Charge.
This includes providing necessary tools, plant, and scaffolding where required.
The work involves sorting the dismantled material, disposing of unserviceable
material at an approved location, and stacking serviceable material with all
necessary all lifts and all leads, as directed by the Engineer-in-Charge.
The volume of the existing plain concrete work shall be measured for payment
before the dismantling commences. The method for calculating the volume for
payment shall be approved by the Engineer-in-Charge.
151 16.02 20002 Dismantling of existing reinforced cement concrete (RCC) work of any grade Cum 150.00 1,110.75
and any type, using mechanical or manual methods as advised by the Engineer-
in-Charge. This includes cutting reinforcement, and providing necessary tools,
plant, and scaffolding. The work also involves sorting the dismantled material,
disposing of unserviceable material at an approved location, and stacking the
serviceable material with all necessary all lifts and all leads, as directed by the
Engineer-in-Charge.
The volume of the existing RCC work shall be measured for payment before the
dismantling begins. The method for calculating the volume for payment shall be
approved by the Engineer-in-Charge.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
152 16.03 20003B Dismantling of existing masonry work of any type, while preserving the Cum 750.00 577.92
integrity of any existing brickwork, regardless of thickness, plaster, or wall lining,
using the necessary tools, plant, and scaffolding. The work includes sorting the
dismantled material, disposing of unserviceable material at an approved
location, and stacking the serviceable material with all required all lifts and all
leads, as directed by the Engineer-in-Charge.
The volume of the existing masonry work shall be measured for payment before
dismantling begins. The method for calculating the volume for payment shall be
approved by the Engineer-in-Charge.
153 16.04 IC-20012 Dismantling of existing metalworks, roofing work at all levels, including Kg 75,000.00 3.85
+ dismantling, cutting, and dismembering all structural elements by any means, as
satement 5 - suggested by the Engineer-in-Charge. This includes earthwork, base concrete,
030202B and reinstating the disturbed ground. The work involves stacking useful
materials and disposing of unserviceable materials at an approved location,
including all necessary leads and all lifts, as directed by the Engineer-in-Charge.
The weight of the dismantled steel members shall be measured for payment.
The method for calculating the weight of the steel for payment shall be approved
by the Engineer-in-Charge.
154 16.05 20005 Dismantling or removal of tiled, paved floors, stone floors, including all Sqm 4,633.00 50.11
required sub-layers and stones from door jambs, windows, ventilation openings,
wall tiles, dado, etc. This includes any necessary earthwork and backing coat
mortar. The work involves disposing of unserviceable material at an approved
location with all necessary lifts and all leads, and stacking serviceable material,
including loading and unloading for all required leads and lifts, as directed by the
Engineer-in-Charge.
The area of the existing flooring/dado shall be measured for payment before the
dismantling begins. The method for calculating the area for payment shall be
approved by the Engineer-in-Charge.
155 16.06 MRA-206 Removal of existing kerb stones of any type, any size, any thickness in Rmt 2,896.00 46.11
required depth including removing kerb with base PCC including excavation etc,
disposal unserviceable material with all lifts and up to any lead at non
objectional place and stacking the serviceable material including loading,
unloading for all lead and lift and as directed by Engineer-in-charge.
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
156 16.06 MRA-206 Dismantling and demolishing of existing temporary/ permanent buildings Sqm 0.00
made of RCC, brick, stone, wood, metal, steel including mud faska, wooden
curries, water proofing, support system, sand stone work, false ceiling, flooring,
water tank, roofing etc. of all size, thickness & height including demolition of
services and foundation of the structure up to all depths & height as per
direction of the Engineer-in-charge (Blasting prohibited). All serviceable
including buy back items like fixed/ movable furniture, door, windows,
ventilators, partitions, soft furnishing/ accessories, E & M fittings & fixtures,
equipments, machinery if any "as is where basis" & non-serviceable materials,
obtained from the demolition shall be property of the contractor and he shall be
responsible for the carriage and disposal of the same (Material will not be
allowed to dumped within the premise of work). Contractor will demolish the
structure in safest manner and he will take all precautions to prevent the
surrounding structures, trees, services from any damage. Rate is inclusive of all
cost incurred in the demolishing work, T&Ps, manpower, segregation of
serviceable/ non-serviceable materials, disposal of same with all lead and lifts
etc. and credit to the Department for the value of serviceable materials all
complete. The Non serviceable dismantled material shall be disposed off by the
contractor with designated C&D Waste recycler units. Plinth area (sqm) of
Building shall be measured for payment. The method of calculation of plinth
area shall be as per CPWD Plinth Area (PAR) latest document.
1) Processing charges paid to the C&D waste plant shall be reimbursed to the
contractor on production of the original invoices and after verification by the
2) Demolition of all old buildings and disposal of the dismantled material shall be
completed within 30 days of start of work. Penalty of Rs.10,000/- (Rs. Ten
Thousand only) per day shall be imposed on non-compliance of the same.
TOTAL CARRIED OVER TO SUMMARY
NO/RA RATE WITH 1%
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
SR NO SOR 24-25 ITEM DESCRIPTION UNIT TOTAL QUANTITY TOTAL AMOUNT
NO./REFE LABOUR CESS
157 15.01 MRA-206 ACP sheet signage on any type of Pole : Sqm 100.00 8,974.36
Providing, Making and fixing 4 mm thick ACP sign of any shape and size and of
approved make to be cut on CNC router cutting and smoothen all corners and
edges. Matter shall be cut in 3M High intensity prismatic Reflective vinyl ASTM
Type 4 and paste on it as per design and detail and as per manufacturer's
specifications. UV stabilized lamination (exterior grade) shall be done on it. The
ACP sheet shall be fixed with clamp and angle on new or any type of Pole as
per drawing. Content of sign shall be letters (in any language), number,
graphics/ maps, signs, arrows, etc. in any colour as per design, drawing and
approved by Architect and Engineer. All side of box shall be covered with ACP
sheet, but only one side elevation area shall be measured and paid in sqm. Cost
of MS Pole, MS framing and civil works shall be paid as per relevant tender
items. The rate shall also include cost of scaffolding, drilling, fabrication,
finishing, adhesive material, back and sides plain cap sheet, fixing charges, etc
at all height and all lead. The contractor shall submit the drawings with as per
concept design and do the sampling and get it approved before execution.
158 15.02 MRA-206 Vinyl Stickers: Sqm 11.00 3,812.65
Providing, Cutting & pasting of vinyl stickers of approved make and shade with
digitally printed graphic/ letter as per design and as directed by engineer in
charge. Pasting of vinyl must be accurate as per the design on the approved
size ACP without any kind of bubbles. The rate shall also include cost of
scaffolding, drilling, fabrication, finishing, adhesive material etc at all height and
all lead. For the any type of content for signage, design intent to be provided by
the engineer incharge, however final shop drawing in context to legibility, copy
right, types/size of font in any language etc shall be prepared by the contractor
and its sole responsibility is on the contractor. Only out to out area elevation
vinyl stickers shall be measured and paid in sqmt. The contractor should submit
the drawings based on concept design and do the sampling and get it approval
before execution.
TOTAL CARRIED OVER TO SUMMARY
TOTAL CIVIL AMOUNT
Name of Project : Panchdev Temple, Gandhinagar
Document Name: Measuremenr Sheet_Civil Works
It. No. Item Description Unit Nos. Length Width Height Quantity
Street - with Side length road 1 44.00
Existing Asphalt Surface To Be Resurfaced 1 432.60 Sqm
New Asphalt Surface To Be Laid 1 185.40 Sqm
Existing Asphalt Surface To Be demolition 1 61.80 Sqm
K Central verge - Kerb 2 44.00 0.15
B Central verge Broom finish 1 44.00 0.30
R Central verge - Railing 1 44.00 40 kg/ rmt
K Carriage way Kerb 4 44.00 0.15
Bituminous Concrete
Cat eye 3 Nos. @ 4.5 mt. c/c 2 30 60.00 No.
Cat eye 3 Nos. @ 4.5 mt. c/c - For Crossing 0 160 0.00 No.
K MUZ Kerb 2 44.00 0.15
B MUZ - Broom finish 1 44.00 1.20
K Foothpath - 60 mm paver Block Kerb 2 44.00 0.15
Foothpath - 60 mm paver Block 2 44.00
Street Furniture
Dustbin 3.00 Pair
Precast Planter 8.00 No
Precast bench 5.00 No
MS Bollard 0.00 No.
Precast Bollard - Entry 0.00 No
Precast Bollard - Junction 0.00 No
Proposed Tree 18.00 No
Existing Tree 10.00 No
K Existing Tree Pit Kerb - 10 4.80 0.15
Junction - Traingular 4 0.16 Sqm 0.64 Sqm
Junction - circular 5 0.28 Sqm 1.41 Sqm
Parking and vending 0 0.60 0.60 0.00 Sqm
Directional + Bus stop 4 1.50 1.00 6.00 Sqm
Total Signage No of
Signage Pole Foundation
It. No. Item Description Unit Nos. Length Width Height Quantity
MS Delineator 2.00 No.
Brick Toe Wall - 1c & type 2c 2
Brick Toe Wall - 1c 2
Brick Toe Wall - 2c 2
Brick Toe Wall - 1b & type 2a, 2b 2
Brick Toe Wall - 1b 2
Brick Toe Wall - 2a 2
Brick Toe Wall - 2b 2
1 Clearing and grubbing Sqm
Total qty.and grubbing of topsoil, up-rooting rank
Street 1 44.00 20.00
2 Excavation for all kinds of soil Cum
Earthwork in excavation
Total qty. of Excavationfor all kinds of soil by any
Brick Toe Wall - 1c 2.00 8.80 1.61 1.30
Brick Toe Wall - 2c 2.00 8.80 1.61 2.05
Brick Toe Wall - 1b 2.00 8.80 1.16 1.10
Brick Toe Wall - 2a 2.00 8.80 1.05 1.20
Brick Toe Wall - 2b 2.00 8.80 1.41 1.65
Signage Pole Foundation
Qty as per Manhole Sheet 1.00 422.00 Cum
Qty as per services counsaltant 1.00 23.00 1.00 1.00
3 Excavation for all kinds of soil Cum
Earthwork in excavation
Total qty. of Excavationfor1.5alltokinds
3.0 of soil by any
Qty as per services counsaltant 1.00 58.00 1.00 0.50
4 Excavation for all kinds of soil Cum
Earthwork in excavation
Total qty. of Excavationfor3.0alltokinds
5.0 of soil by any
Qty as per services counsaltant 1.00 5.00 1.00 0.50
5 Excavation of asphalt pavement Cum
Total qty. ofofExcavation
asphalt pavement/ concrete pavement
It. No. Item Description Unit Nos. Length Width Height Quantity
Existing Asphalt Surface To Be demolition 1 61.80 Sqm 0.60
Qty as per Manhole Sheet 1.00 412.00 sqm 0.30
6 Filling available excavated earth (excluding rock) Cum
Filling available
Total qty. excavated earth (excluding rock) in
Total Excavation
Total Less PCC -59.14
Total Less RCC -42.85
Total Less Brick work up to Existing level -14.18
Less tree pit soil -9.00
Qty as per manhole sheet -52.00
7 Filling of good earth/ murrum Cum Provisonal qty
8 Excavating, supplying, and filling of good earth/ murrum
Filling of sand Cum
Total qty. and fillingfilling
of sand in plinth, underfloor, sunk, subbase
Qty as per services counsaltant 1 131.00 0.70
9 Carriage of excavated earth/gravel by mechanical Cum
Carting ofincluding loading,
excavated transporting,
material lead unloading,
Total Excavation
Total Less filling -723.13
10 Carriage of excavated earth/gravel by mechanical Per km
Carting ofincluding loading,
excavated transporting,
material lead unloading,
Carting 1 177.16
11 Anti-termite treatment Sqm
12 Providing (PCC)
Concrete and injecting
of gradeChemical
- M15 emulsion for PRE- Cum
Total qty. and laying
of M15 PCCin position Ready mix concrete/
Central verge - Kerb 2 44.00 0.30 0.10
Carriage way Kerb 4 44.00 0.30 0.10
Foothpath - 60 mm paver Block Kerb 2 44.00 0.30 0.10
Existing Tree Pit Kerb - 10 4.80 0.17 0.10
Railing Foundation
Central verge - Railing 18 0.30 0.30 0.10
Broom Finish concrete
Central verge Broom finish 1 44.00 0.30 0.10
MUZ - Broom finish 1 44.00 1.20 0.10
Street furniture
MS bollard foundation PCC 0 3.00 1.20 0.10
Precast Bollard 280 dia & 900 depth foundation PCC 0 0.40 0.40 0.15
It. No. Item Description Unit Nos. Length Width Height Quantity
Footpath - Toe wall PCC
Brick Toe Wall - 1c 2.00 8.80 1.01 0.10
Brick Toe Wall - 2c 2.00 8.80 1.01 0.10
Brick Toe Wall - 1b 2.00 8.80 0.56 0.10
Brick Toe Wall - 2a 2.00 8.80 0.45 0.10
Brick Toe Wall - 2b 2.00 8.80 0.81 0.10
Signage Pole Foundation
Busstand Pole Foundation
junction islands 0 1.66 sqm 0.10
60 mm paver block 1 132.00 Sqm 0.10
Qty as per manhole sheet 1 22.00 cum
13 Concrete of M 25 grade Cum
Total qty. of M25 Concrete
Signage Pole Foundation
Pole - Pedstal 20 0.60 0.60 1.20
Footpath - Toe wall RCC Base
Brick Toe Wall - 1c 2.00 8.80 0.91 0.20
Brick Toe Wall - 1c 0.5 2.00 8.80 0.91 0.15
Brick Toe Wall - 2c 2.00 8.80 0.91 0.10
Brick Toe Wall - 2c 0.5 2.00 8.80 0.91 0.15
Brick Toe Wall - 2b 2.00 8.80 0.71 0.10
Brick Toe Wall - 2b 0.5 2.00 8.80 0.71 0.15
Footpath - Toe wall RCC Wall Up NGL
Brick Toe Wall - 1c 2.00 8.80 0.26 1.20
Brick Toe Wall - 2c 2.00 8.80 0.26 1.65
Brick Toe Wall - 2b 2.00 8.80 0.26 1.25
Footpath - Toe wall RCC Wall Above NGL
Brick Toe Wall - 1c 2.00 8.80 0.26 0.45
Footpath - Toe wall RCC Coping
Brick Toe Wall - 1b 2.00 8.80 0.35 0.10
Brick Toe Wall - 2a 2.00 8.80 0.35 0.10
Street furniture
MS bollard foundation 0 3.00 1.20 0.15
Precast Bollard 280 dia & 900 depth foundation 0 0.30 0.30 0.30
14 Concrete of M 30 grade Cum
Total qty. of M30 Concrete
Railing Foundation
Central verge - Railing 18 0.30 0.30 0.30
junction islands 0 1.20 sqm 0.25
Qty as per manhole sheet 1 48.00 Cum
It. No. Item Description Unit Nos. Length Width Height Quantity
15 Thermo-Mechanically Treated bars Fe 500 D Kg
Total qty. of TMT
Signage Pole Foundation 1 14.69 cum 100.00
MS bollard foundation 1 0.00 cum 80.00
Railing foundation 1 0.48 cum 80.00
Brick Toe Wall - 1 31.45 cum 110.00
junction islands 1 0.00 cum 80.00
Broom finish concrete 1 10.00 cum 40.00
As per Manhole Sheet 1 4675.00 KG
0 CENTERING AND SHUTTERING
0 Formwork using any type of suitable material and/ or
a) systemfor foundations, footings, bases of
Total qty.sides of the raft,shuttering
of foundation base PCC, Pile cap etc.
Signage Pole Foundation
Pole - Base 4 20 1.10 0.25
Railing foundation 4 18 0.30 0.30
Footpath - Toe wall RCC Base
Brick Toe Wall - 1c 2 2.00 8.80 0.35
Brick Toe Wall - 2c 2 2.00 8.80 0.35
Brick Toe Wall - 2b 2 2.00 8.80 0.35
MS bollard foundation 2 0 3 0.15
Precast Bollard Foundation 4 0 0.30 0.30
junction islands 0 4.20 P line 0.25
Qty as per manhole sheet 1 72.00 Sqm
17 b) Formwork for Columns, Pillars, Piers, Abutments, Sqm
Formwork and Struts
Total walls of wall
qty. of any thickness
formworkincluding attached pilasters,
Qty as per manhole sheet 1 20.00 Sqm
19 d) Formwork for slabs including edges of slab, sloping Sqm
qty. ofsuspended floors, roofs, landings,
Qty as per manhole sheet 1 99.00 Sqm
20 e) Formwork for beams, lintels, sill, runner, copping, Sqm
girders, plinth
Total qty. beams,
of beam andinvert beam,
lintel tie beams,
Footpath - Toe wall RCC Coping side
Brick Toe Wall - 1b 2.00 8.80 2.00 0.10
Brick Toe Wall - 2a 2.00 8.80 2.00 0.10
It. No. Item Description Unit Nos. Length Width Height Quantity
21 f) Formwork for stairs (excluding landings) except spiral- Sqm
Exposed concrete formwork Sqm
0 Extra for providing
Mock-ups and fixingwork
for all exposed formwork
to be for exposedby the
39 Contractorand
Providing andlaying
in thebefore mass
substructure, Cum
foundation & Brick
Total qty. of below Work
the plinth using common burnt clay
Footpath brick toe wall work up to NGL
Brick Toe Wall - 2c 2.00 8.80 0.23 0.30
Brick Toe Wall - 1b 2.00 8.80 0.46 0.25
Brick Toe Wall - 1b 2.00 8.80 0.35 0.75
Brick Toe Wall - 2a 2.00 8.80 0.35 0.50
Brick Toe Wall - 2a 2.00 8.80 0.23 0.50
Brick Toe Wall - 2b 2.00 8.80 0.23 0.30
Footpath brick toe wall work above NGL
Brick Toe Wall - 1c 2.00 8.80 0.23 0.30
Brick Toe Wall - 1b 2.00 8.80 0.23 0.30
Brick Toe Wall - 2a 2.00 8.80 0.23 0.10
Qty as per manhole sheet 1 69.00 cum
40 Providing and laying brick masonry in the superstructure Cum
41 using common
Providing andburnt clay half
laying bricksbrick
conforming to IS 1077-
masonry in the Sqm
42 superstructure
08 using common
mm thick Cement burnt clay building bricks,
mortar plaster Sqm
12 - 15 mm and applying
thick plasteran- cement
08mm mm thick Sqm
Total qty. and applying
of 12-15 mm12 to 15 mm thick plaster
Brick Toe Wall - 1c 2.00 8.80 2.00 0.30
Brick Toe Wall - 2c 2.00 8.80 2.00 0.30
Brick Toe Wall - 1b 2.00 8.80 2.00 1.45
Brick Toe Wall - 2a 2.00 8.80 2.00 1.10
Brick Toe Wall - 2b 2.00 8.80 2.00 0.30
44 Average 20 mm thick plaster - cement mortar Sqm
15 mm thickandwaterproof
applying an average 20 mm thick double
Total qty. and applying
of 20 an average 15 mm thick
Qty as per manhole sheet 1 564.00 Sqm
104 White cement-based putty Sqm
Acrylic and applying
emulsion paint - white cement-based
interior grade putty of Sqm
Acrylic and applying
emulsion two primer
paint with coats of superiorgrade
- Exterior quality, Sqm
Total qty. and applyingpaint
of external 100% acrylic smooth exterior
Brick Toe Wall - 1c 2.00 8.80 2.00 0.30
Brick Toe Wall - 2c 2.00 8.80 2.00 0.30
Brick Toe Wall - 1b 2.00 8.80 2.00 1.45
Brick Toe Wall - 2a 2.00 8.80 2.00 1.10
Brick Toe Wall - 2b 2.00 8.80 2.00 0.30
It. No. Item Description Unit Nos. Length Width Height Quantity
107 PU polish - for external/internal wooden & veneered Sqm
108 Stain-repellent transparent coating - for natural stone, Sqm
109 exposed concrete
Providing work, exposed
and applying external brickwork
finish of average 2 to Sqm
0 thick acrylic based texture coating of approved
0 TOTAL CARRIED OVER TO SUMMARY
110 Sandwich panels for roofing Sqm
111 Providingaccessories
Roofing and installing- prepainted "Sandwich panels"
gutter/flashing/ridge (600 mm Rmt
TOTALall girth)
CARRIED OVER TO SUMMARY
112 1. All adhesives,
Structural steel sealants & paint shall works
work - Fabrication be with- low VOC
paint: qty. of MS Work
Central verge railing 1 44 40 Kg/rmt
Signage @ Framining -6 kg/Sqm - each side 1 12.08 Kg/Sqm 6.00
Signage @ Pole -35 kg/No. 20 35.00
Hand Rail (for Handicap) ( (5.5+(6*0.5) = 8.5 x 6.42 kg 1 1.00 kg/No. 55.00
per rmt 6.42 = 55 kg
113 Extra for providing hydraulic bending to MS member Kg.
Totalhollow sections,
extra for steel sections, any type of
Qty as per MS work 1% 1 2587.48 Kg
114 Extra for providing Hot dip galvanizing work confirming Kg
Hot dip GIwith zinc of 610 GSM thickness
Qty as per MS work 1 2587.48 Kg
115 Extra for providing and making CNC cutting on Any Sqm
Total qty. of any
of CNC type, any size, any shape etc as
Provisonal qty 1 10.00 sqm
116 Stainless steel (304 grade) - Fabrication works Kg
modular fixing railing
system stainless steel (Grade 304) Kg
Providing and fixing a stainless steel (Grade 304)
0 TOTAL CARRIED OVER TO SUMMARY
0 EXTERNAL DEVELOPMENT WORK
type ofshall be free
stones shallfrom cracks,
to size stains,
118 cutting/laser cutting/CNC
Sub grade preparation andmachines according to the
consolidation Sqm
Total qty. ofand
Subconsolidation
grade of sub grade with power
New Asphalt Surface To Be Laid 1 185.40 Sqm
Foothpath - 60 mm paver Block 2 44.00 1.50
Broom finish concrete 1 66.67 Sqm
119 Box cutting Cum
qty. offor making
Box a base for road work, pavement
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD (3).pdf
Specification (2).pdf
BOQ (1).pdf
MEPF Drawings.pdf
Structural Drawings.pdf
Street-SHEET-3.pdf
Street-SHEET-4.pdf
Street-SHEET-1.pdf
Street-SHEET-2.pdf
Architectural Drawings_compressed (1).pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .