Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹15.1 LAccepted-AOC | ₹15.1 L | 1 | Accepted-AOC LOWEST |
| 2 | 2₹16.0 LRejected-AOC | ₹16.0 L | 2 | Rejected-AOC SECOND |
| 3 | 3₹17.0 LRejected-Finance | ₹17.0 L | 3 | Rejected-Finance THIRD |
| Sl No | Description | Qty | Unit | RAFEEQUE L3 | AHAMMED FANAS M A L2 | Pratheesh george L1 |
|---|---|---|---|---|---|---|
| 1.00Appendix A : SIDE PROTECTION WORKS | ||||||
| 1.00 | 3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m) | 107.5 | cum | 63 ₹6,772.50 | 63 ₹6,772.50 | 60 ₹6,450 |
| 1.00 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 6 | cum | 7,082.7 ₹42,496.20 | 7,000 ₹42,000 | 6,400 ₹38,400 |
| 1.00 | OD60665/2025-2026:Dry rubble masonry with good quality blasted rubble including packing to compactness to lines and levels cost of conveyance of all materials labour charge etc complete as per direction of deparmental officers at site. | 248.7 | cum | 3,713.4 ₹9.2 L | 3,800.7 ₹9.5 L | 3,265 ₹8.1 L |
| 1.00 | 12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer | 30.3 | cum | 8,903.7 ₹2.7 L | 9,000 ₹2.7 L | 8,000 ₹2.4 L |
| 1.00 | 12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications | 1.88 | MT | 96,976.9 ₹1.8 L | 54,000 ₹1.0 L | 87,000 ₹1.6 L |
| 1.01 | 3.16:Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. | 152.52 | cum | 546.9 ₹83,413.19 | 369 ₹56,279.88 | 495 ₹75,497.40 |
| 1.01 | 12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15 | 22.8 | cum | 8,197.6 ₹1.9 L | 7,900 ₹1.8 L | 7,360 ₹1.7 L |
Tender Value
₹16.4 L
EMD Value
₹41,064
Closing Date
7 Nov 2025, 11:00 amClosed
EXECUTIVE ENGINEER
EXECUTIVE ENGINEER PWD ROADS DIVISION WAYANAD
GENERAL-SR 2025-26-Urgent Construction of Retaining Wall between km.67/600 to 67/660 RHS of Thalassery Baveli Road-Civil Work-General Civil Work
2025_PWD_807731_2
PWD/RB/TR/11017/2025_5_1_1/1
Open Tender
Civil Works - Roads
WAYANAD
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹41,064
Yes
24 Apr 2026
31 Oct 2025
10 Nov 2025
31 Oct 2025
7 Nov 2025
31 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 1.86 MB
BOQ_1369459.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid