| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 CrAdmitted-Finance | -28.90% | ₹2.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.6 Cr+₹13.3 L (5.49%)Admitted-Finance | -25.00% | ₹2.6 Cr+₹13.3 L (5.49%) | L2 | Admitted-Finance |
| 3 | L3₹2.7 Cr+₹31.9 L (13.1%)Admitted-Finance | -19.57% | ₹2.7 Cr+₹31.9 L (13.1%) | L3 | Admitted-Finance |
| 4 | L4₹3.0 Cr+₹59.7 L (24.6%)Admitted-Finance | -11.44% | ₹3.0 Cr+₹59.7 L (24.6%) | L4 | Admitted-Finance |
| 5 | L5₹3.6 Cr+₹1.2 Cr (47.7%)Admitted-Finance | +5.00% | ₹3.6 Cr+₹1.2 Cr (47.7%) | L5 | Admitted-Finance |
Tender Value
₹3.4 Cr
EMD Value
₹6.8 L
Closing Date
5 May 2026, 4:00 pmClosed
SUPERINTENDING ENGINEER PWD (RnB) CIRCLE RAJOURI
O/O SUPERINTENDING ENGINEER PWD(RnB)IRCLE RAJOURI
Construction of Tourist Guest House at Nowshera, Rajouri. (under Capex Budget)
2026_PWDJK_307555_2
e-NIT No. 02 of 2026-27 Dated 08.04.2026
Open Tender
Civil Works
Percentage
365 days
Rajouri
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
SUPERINTENDING ENGINEER PWD (RnB) CIRCLE RAJOURI
₹6.8 L
12 May 2026
9 Apr 2026
6 May 2026
9 Apr 2026
5 May 2026
9 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge in all kind of soil. | - | Cum | - | - |
| - | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil | - | Cum | - | - |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work up to plinth level in 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate) 40mm nominal size crushed. | - | Cum | - | - |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
| - | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-incharge. Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately. All works upto plinth level | - | Cum | - | - |
| - | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-incharge. Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately. All works above plinth level upto floor V level | - | Cum | - | - |
| - | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | - | Cum | - | - |
| - | Centering and shuttering including strutting, propping etc. and removal of form work for: | - | - | - | - |
| - | Foundations, footings, bases of columns etc. for mass concrete | - | Sqm | - | - |
| - | Columns, Pillars, Piers, Abutments, Posts and Struts | - | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 3.01 MB
BOQ_997667.xls
BOQ • 0.32 MB
corrigendum03.pdf
PDF • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .