Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.1 LAccepted-AOC AT MAEL KENDUWATAND SANDI RAJRAPPA PROJECT RAMGARH JHARKHAND 829150 | RAMGARH | RAMGARH | JHARKHAND | 829150 | ₹16.1 L | L1 | Accepted-AOC AOC |
| 2 | L2₹16.9 L+₹76,627.81 (4.75%)Rejected-Finance | ₹16.9 L+₹76,627.81 (4.75%) | L2 | Rejected-Finance As per Approved TCR |
| 3 | L3₹19.2 L+₹3.1 L (19.0%)Rejected-Finance | ₹19.2 L+₹3.1 L (19.0%) | L3 | Rejected-Finance As per Approved TCR |
| 4 | L4₹21.6 L+₹5.5 L (33.9%)Rejected-Finance | ₹21.6 L+₹5.5 L (33.9%) | L4 | Rejected-Finance As per Approved TCR |
Tender Value
₹22.7 L
EMD Value
₹28,400
Closing Date
27 Apr 2026, 5:00 pmClosed
Staff Officer (Civil) Rajrappa Area
Office of the Staff Officer (Civil)GM Unit Rajrappa Area
Cleaning of drains, hume pipe and providing hume pipes at required location of sec 1 and sec 2 under Rajrappa project Retender
2026_CCL_358426_1
CCL/Rajrappa/GM Unit/Civil/NIT/26-27/03
Open Tender
Civil Works - Others
Percentage
150 days
Rajrappa Area
As per NIT
4 documents required · 4 mandatory
₹28,400
21 May 2026
16 Apr 2026
29 Apr 2026
17 Apr 2026
27 Apr 2026
17 Apr 2026
17 Apr 2026 - 20 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with | - | cum | - | - |
| 2 | Providing and laying Non Pressure NP-4 class (Heavy duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement .1000 mm dia RCC pipes. (Laying by manual/ machanical means) | - | m | - | - |
| 3 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | - | Cum | - | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size). | - | Cum | - | - |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to
plinth level :1:2:4 (1 cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from
natural sources) | - | cum | - | - |
| 6 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | - | sqm | - | - |
| 7 | Total impact of GST for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_371306.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.25 MB
BOQ_371306.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .