Loading…
Loading…
Tender ID
Tender Value
₹24.8 L
EMD Value
₹25,000
Closing Date
25 Feb 2026, 6:00 pmClosed
Executive Engineer, P.H. Mechanical Division Himmatnagar
Supply installation testing commissioning of HSCF pumping machinery with associated mechanical electrical work for Sayra old Sathamba Khoda and Barnoli Pumping station under SK 2 RWSS,taluka Modasa Dhansura Bayad District Arvalli Year 2025 26
274397
04- 2025-2026 (3rd attempt)
Open
Mechanical - All
Works
Sabarkantha
7 documents required · 7 mandatory
₹900
Yes
Executive Engineer, P. H. Works Division, Modasa
₹25,000
Yes
9 Feb 2026
9 Feb 2026
9 Feb 2026
25 Feb 2026
9 Feb 2026
Estimated Cost: Rs.
VOLUME: IV,Price Bid ..
THIS PAGE IS LEFT INTENTIONALLY BLANK
VOLUME: IV,Price Bid ..
PRICE BID (SCHEDULES B)
Sr. No. DESCRIPTION
2 BID FORM (WITH PRICE)
4 PRICE BID (SCHEDULES – B)
Break Up Cost of Bid documents for supply, installation, testing
& commissioning of HSCF pumping machinery with
associated mechanical & electrical work for Sayra
(old),Sathamba (Khoda) and Barnoli Pumping station
under SK-2 RWSS,taluka Modasa,Dhansura & Bayad
District: Arvalli Year 2025-26
VOLUME: IV,Price Bid ..
1. This bid is lump sum bid for works of “supply, installation, testing & commissioning of HSCF
pumping machinery with associated mechanical & electrical work for Sayra (old),Sathamba
(Khoda) and Barnoli Pumping station under SK-2 RWSS,taluka Modasa,Dhansura & Bayad
District: Arvalli Year 2025-26” The Bidder shall quote his firm and fixed lump sum price for the
entire work under this Contract, defined in more details in various sections of this bid document
without considering expenses of insurances for employees & plant machineries.
2. Contractor shall have to take insurance policy for man power as well as all the equipment and furnish
copies of policies along with details of premium paid within maximum three working days from
the date of taking over pumping station. In case the contractor fails to purchase insurance policies
within the stipulated time frame, amount of Rs.500.00 (Five Hundred) per policy per day shall be
recovered from the contractor. Even after that the entire responsibility shall rest with the contractor on
3. GWSSB shall recover appropriate amount from the agency for not taking adequate insurance for the
man power as well as the equipment/machinery. Even after recovery of above amount, responsibility
of the contractor for taking insurance cover shall still continue and the agency can’t escape from the
responsibility on any that account.
4. Expenditure incurred by the contractor towards payment of premium towards insurance policy for
man power and & pumping station machinery/equipment shall be reimbursed on production of
insurance policies along with original premium payment receipt. Insurance Policy should be assigned
in favour of Executive Engineer, Public Health Mechanical Division, Modasa. The policies shall
remain valid till the contract period gets over. It is advisable to take appropriate insurance cover for a
period of currency of the contract. However, in case of annual policies, the onus of timely renewal
entirely lies with the contractor.
of all pumping machinery with associated equipments and accessories etc. located at various pumping
station(s) specified for entire period of Contract. Rates and prices received in any other formats will
be rejected and the Bids will be disqualified.
6. It will be entirely at the discretion of the Employer to accept or reject the Bidders’ proposal, without
giving any reasons whatsoever and the Bidder shall not be permitted to withdraw his bid on this
schedule only will be considered & shall form a part of the Contract Agreement.
8. Each item is to be individually priced and the amounts shall be added up to arrive at the “Total of
the item to be priced on “as applicable” basis. The item shall not be priced if it is “not applicable” to
the bidder, in which case the bidder shall add the words “NOT APPLICABLE”. The wording in the
VOLUME: IV,Price Bid ..
item description is for subject matter guidance only; clause references are indicative only and all other
relevant clauses shall also be referred to. The prices shall allow for all the works covered under the
bid and all liabilities and contractual obligations whether separately specified or not. Items against
which no prices are quoted shall not be separately paid for and the Bidder shall be deemed to have
covered the cost of execution of such items (according to the requirements of the bid document) in the
prices quoted for other items if any.
working of the system as specified, will not be separately paid for by the GWSSB when executed and
shall be deemed to be already covered by other items and rates listed in the price sheets and Lump
sum prices quoted in Schedule.
11. Bidder shall quote their price for SITC work with O & M for period of 1 Year. The Bidder
cannot quote the rates for O & M works less than the estimated amount. In this tender total
estimated amount for Comprehensive Operation and Maintenance for a period of 01 year is Rs.
13,23,504.00. If bidder quotes rates less than the above amount in O & M Schedule B -
financial evaluation shall be carried out by adding difference amount of estimated amount and
quoted rates for L1 comparison. Payment shall be made on approved price only but as per
schedule of payment.
12. The rates shall be deemed to include any works and setting out that may be required to be carried out
for carrying out of all the works involved.
13. Prices shall be entered in figures and in words. Where there is a discrepancy between the unit, rates
and the amount entered, the later shall govern.
data Sheets and other sections of these bid documents and these documents are to be taken as
mutually explanatory of one another.
15. A) Bidder shall quote the price exclusive of GST, but inclusive of all other taxes and cess or levies or
duties which shall not be paid extra. While GST will be paid for admissible part of actual work done
at the approved tender rates and tender conditions of price variation. GST shall be paid as per
prevailing rates at the time of payment. The TDS shall be deducted at source as per provision of IT
rules and GWSSB policy.
B) The rates should be quoted excusive of GST but inclusive of all other taxes as per Volume I (B),
General Conditions of Contract, Clause No.
Rates quoted are fixed and shall remain final for the entire period of Contract. No price escalation
shall be considered on any account and no extra payment on this account will be made to the
16. The Bidder shall be deemed to have allowed in his price for provision, maintenance and final removal
VOLUME: IV,Price Bid ..
of all temporary works of whatsoever nature required for SITC of pumping machinery & accessories
including temporary approach, diverting water, pumping, de watering etc. for the proper execution of
works. The rates shall also be deemed to include any works and setting out that may be required to be
carried out for smooth & uninterrupted execution all the works involved.
17. Payment Terms: Schedule of payment for various stages of works and release of retention money on
account of defect liability is tabulated below.
1 All Mechanical – Electrical – Instrumentation Works
1 On Supply of Equipment at Site 75 % of Weightage (Amount)
2 After Installation/Erection of Equipment 15 % of Weightage (Amount)
3 After Successful Testing & Commissioning of 10 % of Weightage (Amount)
Equipment (On Completion of Stipulated Trial
Note: 5 % Amount towards defect liability of all above equipment (at every stage
of payment) shall be withheld as defect liability which shall be released after a
period of three years from the date of testing & commissioning (inclusive of
completion of stipulated trial period)
18. Payment shall be made as & when funds are made available by Head Office after adherence to
department’s fund requirement & procedure thereof. The GWSSB shall not under any circumstances
relax these of terms of payment and will not consider any alternative payments terms. Bidders should
therefore in their own interest note this provision.
19. 1% of the contract value of work will be deducted from the Running bill(s) on account of
labour cess which is non-refundable.
20. Third Party Inspection and Factory Testing of the major mechanical, electrical equipment &
Instrumentation system such as HSCF Pumps, Induction Motors, Electromagnetic Flow Meters,
Sluice & Butterfly Valve, DPCV, Expansion Bellows, Drain Pump, EOT, Distribution
Transformers, 11 KV HV VCB Switchgear Panels, APFC Panel, MCC Panels, LV PDB-LDB
Panels, HV & LV Power & Control Cables shall be carried out by the designated third party
inspection agency in the presence of GWSSB's representative (i.e. jointly) at manufacturers’ works.
Inspection charges shall be initially paid to the designated TPI as per accepted rates by GWSSB. Prior
approval of rates shall be obtained by the Contractor from Executive Engineer, P. H. Mechanical
Division, Modasa. Subsequently the amount so paid shall be reimbursed to the contractor after
VOLUME: IV,Price Bid ..
providing relevant documents viz. receipt of amount(s) paid along with inspection release note etc. as
required by the Engineer-in-charge. Any expenditure incurred by inspection agency for the work
misinformed by the Contractor and charges of inspection agency without any work due to
misinformation shall not be reimbursed to the Contractor.
21. Department shall reimburse the payment made towards insurance of machinery/equipment and for
operating crew/man power engaged as narrated in clauses at serial no. 3, 4 & 5 in this section.
22. The Bidder should acquaint him with the pumping station site conditions including the access to
concerned work site.
23. Contractor has to take over all the plants & machinery of pumping station in writing from concerned
Engineer-in-charge after successful completion of trial run of pumping machinery with accessories.
Detailed handed over/taken over notes shall be duly signed by the concerned Deputy Executive
Engineer and the Contractor.
24. On completion of period of 01 year of comprehensive operation & maintenance, the Contractor shall
hand over all the equipment and machinery in proper & satisfactory working condition either directly
to the Department and/or any other Contractor authorized by the Department and as advised. In case
of any malfunctioning, the outgoing Contractor shall be intimated in writing and required repairing
and/or replacement shall have to be made by the outgoing Contractor within a period of maximum
days. Only after completion of required repairs carried out to the satisfaction of the Engineer-in–
charge the separate certificate shall be issued for satisfactory handing & taking over. Only after issue
of this certificate from the Engineer–In–charge the amount of security deposit shall be released.
25. During the process of handing over, if the Contractor fails to repair/replace the malfunctioning
equipment as intimated within 15 days or any reasonable time as decided by Engineer–in-charge, than
the repairs/replacement shall be carried out at the “Risk and Cost” of the Contractor and the
expenditure incurred for carrying out such repairs/replacements shall be deducted from the dues to the
Contractor and/or recovered from the security deposit.
26. If Department finds that man power/employees engaged in O & M work are not as per requirement
than Engineer-in-charge shall give a written notice to the Contractor for employing manpower as per
requirement. Even after issue of this notice, if the Contractor fails in providing man power as per
departmental & contractual requirements than department is at liberty to terminate the Contract and
the amount of security deposit shall be forfeited.
27. Contractor shall pay special attention towards improving the power factor as per design of fixed
power factor improvement panel. The panels provided at pumping station within the scope are
designed & constructed to improve power factor to minimum 0.99 in case of HV & 0.95 in case of
LV power connections. Care must be taken by the contractor to get maximum incentives provided by
the power utility viz. UGVCL on maintaining of power factor (exceeding 0.95) in the monthly
VOLUME: IV,Price Bid ..
electric bills. However in case of imposition of any power factor adjustment charges i. e. penalty in
the monthly bills, the same amount along with 5 % of administrative cost shall be recovered from the
bills of the contractor. No representation from the contractor in this aspect shall be entertained by the
28. Contractor shall to have to make payment to the man power/operating crew engaged by him
regularly on monthly basis preferably by NEFT/RTGS transfer directly into the bank accounts
of the concerned employees. Above payment must not be less than prevailing minimum wages fixed
by the Labour Commissioner, Government of Gujarat. The contractor has to submit Notarized
Affidavit to the Engineer-in-charge mentioning that all the employees engaged by him shall be paid
minimum wages as per labour laws & entire responsibility rests on him & him only in this regard.
Failure to adhere to this condition may result into termination of the Contract by the Department. The
Contractor has to submit certified monthly attendance sheet (muster) of employees with clear
declaration of receipt of monthly wages by the concerned employees duly signed by individual
29. The Contractor shall have to pay the labour registration fee of required applicable amount Rs
per labour as per prevailing laws and also pay annual contribution of required applicable amount Rs.
75.00 to the Labour department of the Government of Gujarat.
30. O & M period will start from date of handing over of pumping station to the Contractor by the
department and/or by the outgoing Contractor.
31. Income Tax, Labour cess and any other tax/cess as per prevailing rules of the Government resolutions
shall be deducted from bills payable to agency.
32. The rates to be quoted by the Bidder must include all kinds of taxes/levies/cess applicable to the work
contained in price bid. No extra amount shall be paid to the agency on account of any such tax/cess/
levy by the Department.
33. The Contractor has to maintain cleanliness at all times during the currency of the contract. The
Contractor must keep pumping station & the surrounding open areas clean at all times. Pumping
station must be swept regularly by the helper engaged by the Contractor without any additional cost
to the department. No amount of dirt, dust, refuge, leaves, garbage etc. shall be allowed either in the
pump house or premises & adjoining surrounding areas. The Contractor has to ensure only minimum
allowable leakages from pumps & valves. Under no circumstances leakages from expansion bellows
or delivery pipe lines within the pump house shall be allowed.
34. Record of quantity of water received to the pumping station & water pumped from the pumping
station on hourly basis along with consumption of electric power shall be maintained without fail by
the Contractor. Data of number of pumping hours and quantity of water pumped on daily basis must
be intimated provided to the Engineer–in–charge as well as control room of GWSSB as instructed &
in the required format & mode of communication viz. cellular mobile hand set and/or tab.
VOLUME: IV,Price Bid ..
35. Shutdown: Shutdown of maximum continuous 01 day will be given for dismantling of old
machinery and installation, replacement & testing of new mechanical equipment/machinery.
As existing pumping machinery provides water to several villages, city & prestigious
institutions/corporations/Government Organizations in Ahmedabad District, it will be
imprudent to take shut down for longer periods at a stretch so as to avoid disruption of water
supply. However, Contractor shall be allowed to dismantle existing pumping machinery &
install new pumping machinery etc. & allied mechanical – civil works in maximum 03 slots
(batches) to be decided in consultation with Engineer-in-charge. Similarly for installation of
electrical equipment shutdown of maximum continuous 01 day will be given for
dismantling of old transformers – panels etc. & install new electrical equipment etc. & allied
electrical – civil works in maximum 02 slots (batches) to be decided in consultation with
Engineer-in-charge. However, timings & schedules of shut down shall be decided in advance
by the Engineer-in-charge & Contractor has to strictly follow & adhere to the pre-decided
schedule. Failing which liquidated damages of Rs. 25,000.00 per day of delay shall be
recovered from the running bill (s) of the contractor.
36. During execution of the entire work, minimum 50 % system (i. e. 2 pump sets) shall
be in running condition and functional to maintain the supply of water (except scheduled shut
down as per above Sr. No. 36).
Special condition- Agency has to complete SITC work within 150 days from the date of
LOI/LOA. Agency has to handover the pumping machinery to existing o&m contractor
after 1 month trial run. Defect liability period will be three years on completion on trial
run. Any repairing work will be carried out by o&m agency but any fault in the
pumping machinery due to design problem then it is the responsibility of SITC
contractor to rectify the fault and decision of Executive Engineer will be final in the
matter and binding to the contractor.
Signature of Contractor Executive Engineer
P. H. Mechanical Division
VOLUME: IV,Price Bid ..
The Executive Engineer,
P. H. Mechanical Division,
Gujarat Water Supply & Sewerage Board,
Shankar Bhuvan,Opp.Kachchhi Samaj Vadi,
Shamalaji Road, Modasa-
Subject: Bid documents for “supply, installation, testing & commissioning of HSCF pumping
machinery with associated mechanical & electrical work for Sayra (old),Sathamba
(Khoda) and Barnoli Pumping station under SK-2 RWSS,taluka Modasa,Dhansura &
Bayad District: Arvalli Year 2025-26
Having visited Raw Water pumping station site and examined all the volumes (I To IV), technical bid, general
– commercial terms conditions & post qualification criteria, technical specifications & data sheets, conditions
Addenda/Corrigenda/Amendments to the above, for the execution of the above contract, we the undersigned
offer to carry out SITC of HSCF pumping machinery with associated mechanical and electrical equipment &
accessories of complete pumping station/plant in conformity with the Conditions of Contract, Specifications,
Nos._______________ (insert numbers) for Lump sum fixed price of Rs. _____ __________ (Rupees
2. I/We agree that
(a) If we fail to provide required facilities to the GWSSB's representative or any other
person/agency by the GWSSB to perform on his behalf for carrying out the
inspection and testing of materials and workmanship
(b) If we incorporate into the works, materials before they are tested and approved by the
Engineer’s representative
(c) If we fail to deliver raw/clear water of required quantity according to the
conditions/stipulations of the contract, the Engineer-in-charge will be at liberty to
take any action including termination of contract and impose at his absolute
discretion any liquidated damages penalties and/or reject the complete and part
portion(s) of the work (s).
3. We undertake, if our bid is accepted, to complete and deliver the works in accordance with the contract
within stipulated time limit as prescribed in notice inviting the tenders inclusive of monsoon, from the
date of issue of Letter of Acceptance issued to us by you.
4. We agree to abide by this bid for a period of 180 days from the last date of submission of bid and it
shall remain binding upon us and may be accepted at any time before the expiry of that period.
5. In the event of our bid being accepted, we agree to enter into a formal contract agreement with you
incorporating the conditions of contract thereto annexed but until such agreement is prepared this bid
together with your written acceptance thereof shall constitute a binding contract between us.
VOLUME: IV,Price Bid ..
6. We agree, if our bid is accepted, to furnish performance bond/security in the forms and of value
specified in the conditions of contract of a sum equivalent to 10 % of the contract price or estimated
amount put to tender (whichever is higher) for due performance of the contract.
7. We have independently considered the amounts of liquidated damages shown in various sections of the
bid documents and agree that they represent a fair estimate of the damages likely to be suffered by you
in the event of the work not being completed by us in time.
8. We understand that you are not bound to accept the lowest or any bid you may receive.
(Name of the person)
(In the capacity of)
Duly authorised to sign bid for and on behalf of
(Fill in block capitals)
(Bidders are required to fill up all blank spaces in this Bid Form)
VOLUME: IV,Price Bid ..
THE DECLARATION REGARDING LITIGATION AND OTHER HISTORY
on Rs. 300/- Non-Judicial Stamp Duly Notarized
I, --------------------------------------- aged, ------------------- Year occupation business, residing at --------------
------------------------------------------ do hereby state on solemn affirmation and declare on oath as under
a partner and am duly authorized person of the said -------------------------------------------------------
-------- to do present affidavit on its behalf.
2. I say that the said --------------------------------------------------------------- has submitted / uploaded
tender / e-tender floated by the Executive Engineer, P. H. Mechanical Division, GWSSB,
Ahmedabad being tender / e-tender ID –------------- for the work of -------------------------------------
3. I have read the terms & conditions of the said tender conditions and I have understood the
4. I say the details and particulars given by ----------------------------------------------------------------------
-------------------------------- are true and correct, state and declare that the said -----------------------
--------- are true and correct and complete.
5. I say that if any particulars are found to be incorrect or incomplete or misleading in any
matter, the Gujarat Water Supply and Sewerage Board shall have full authority to cancel the
------------------------- shall be liable for all the consequences that may arise out of the action of
the Gujarat Water Supply and Sewerage Board.
6. I say that I am aware that making wrong statement on affidavit is a punishable offence.
7. I say that I have not been terminated / blacklisted / debarred in any State Government /
Municipal Corporation / Central Government / Any State Government Organization / Urban
Local body and / or their undertaking companies or their Special Purpose Vehicle (SPV), Asian
Development Bank / World bank or similar international funding organizations as on the last
day of bid submission.
Dated Signature of Contractor
VOLUME: IV,Price Bid ..
Gujarat Water Supply & Sewerage Board
Public Health Mechanical Division, Modasa.
Name of Work: “supply, installation, testing & commissioning of HSCF pumping machinery
with associated mechanical & electrical work for Sayra (old),Sathamba (Khoda) and Barnoli
Pumping station under SK-2 RWSS,taluka Modasa,Dhansura & Bayad District: Arvalli Year
Sr. Particulars Quantity Rate Unit Place of delivery
➢ The persons or firm submitting the tender should see that the rates to the above schedule are filled up by
the Executive Engineer before the issue of the form prior to the submission of the Tender.
➢ Carting of above materials shall be done by the contractor at his own cost.
➢ The materials shown in above schedule will be issued at free of cost. However, the contractor shall have
to return the balance materials at department store at his own cost else recovery at double of the issue rate
for such material will be effected in view of clause 12-A of the contract.
Signature of Contractor Executive Engineer
P. H. Mechanical Division
VOLUME: IV,Price Bid ..
LIST FOR EQUIPMENTS/INSTRUMENTS REQUIRED FOR SITE OFFICE WORK.
Item Description
Agency has to Procure and must supply at site free of cost and has to hand over to Engineer in charge
within one month from date of work order given as under.
No. Description Nos Of item.
Note: - all above item must be provided by Agency at free of cost.
Signature of Executive Engineer
Contractor P. H. Mechanical Division
VOLUME: IV, Price Bid Augmentation of KOTHASANA
Gujarat Water Supply & Sewerage Board
Public Health Mechanical Division, Modasa
PRICE BID - SCHEDULE-B-1
Memorandum Showing Items of works to be carried out
Name of Work: supply, installation, testing & commissioning of HSCF pumping machinery with associated
mechanical & electrical work for Sayra (old),Sathamba (Khoda) and Barnoli Pumping station under SK-2 RWSS
taluka Modasa,Dhansura & Bayad District: Arvalli.
Sr. Description Of Item Qty Uni Estimated Rates Amount
No. t Supply ITC Total
1 Supply, installation, testing & commissioning of horizontal split
casing centrifugal pump motor set of specified duty parameters
& guaranteed efficiency of following MOC with specified
capacity, horizontal foot mounted TEFC squirrel cage induction
motor (with minimum IE-3 efficiency class), working on three
phase AC supply with 50 Hz ± 3%, 415 V ± 10%, rated speed
1450 RPM along with fabricated MS base frame, coupling,
coupling guard, foundation bolts etc. as per relevant IS.
M.O.C.: Impeller & Wearing Rings: CF8M, Casing: Cast Steel
WCB , Shaft: SS 410, Shaft Sleeve: SS 410, Mechanical Seal
(Above 30kW), Base Frame: MS. (25.28 LPS,58 mtr Head,30
KW)-03 Nos At Barnoli HW for Barnoli Local Section
VOLUME: IV, Price Bid Augmentation of KOTHASANA
2 Manufacture, Supply & Delivery of Electric Resistance Welded
(Up fo 400mm)/Submerged Arc Welded{Above 400mm)
M.S.Pipe having beveled ends plate or coil conforming to IS-
3589-2001 or its latest revision/ ammendment for following
thickness outside diameter at GWSSB store or site anywhere in
Gujarat State including all taxes, insurance, transportation,
freight charges, octroi, inspection charges, loading, unloading
conveyance to Departmental stores, stacking etc. all complete.
(Rate for MS Pipe based on the ex. works price of HR Coil as
Rs.67500.00 per MT - withouth GST (Above 3.15 mm to
mm) & Rs. 68000.00 per MT without GST (Above 10 mm) as on
Feb-22.( WPI Index of H. R Coil of Jan-22 is 155.8) and
Lowering, laying, jointing & welding in position to correct line &
level M.S. Pipe with outerside 3 LPE coating & inside solvent
free liquid epoxy lining on pedestal or chairsupon prepared
formation or prepared bedding in trenches the rates include
conveyance from store to site of work loading, unloading, heat
shrink sleéev jointing hydrotesting etc.complete. Pipe Dia.168
mm, thikness 4.5 mm-Barnoli Hw for Barnoli Local Suction and
3 Manufacture, Supply & Delivery of Electric Resistance Welded
(Up to 400mm)/Submerged Arc Welded{Above 400mm)
M.S.Pipe having beveled ends plate or coil conforming to IS-
3589-2001 or its latest revision/ amendment for following
thickness outside diameter at GWSSB store or site anywhere in
Gujarat State including all taxes, insurance, transportation,
freight charges, octroi, inspection charges, loading, unloading
conveyance to Departmental stores, stacking etc. all complete.
(Rate for MS Pipe based on the ex. works price of HR Coil as
Rs.67500.00 per MT - without GST (Above 3.15 mm to 10 mm)
& Rs. 68000.00 per MT without GST (Above 10 mm) as on Feb-
22.( WPI Index of H. R Coil of Jan-22 is 155.8) and Lowering,
laying, jointing & welding in position to correct line & level M.S.
Pipe with outerside 3 LPE coating & inside solvent free liquid
VOLUME: IV, Price Bid Augmentation of KOTHASANA
epoxy lining on pedestal or chairs upon prepared formation or
prepared bedding in trenches the rates include conveyance
from store to site of work loading, unloading, heat shrink sleéev
jointing hydrotesting etc.complete. Pipe Dia.219.1 mm, thikness
6.3 mm-Barnoli Hw for Barnoli Local Header line
4 Providing and supplying IS! mark Cl D/F Sluice Valves as per
1S:14846 (Latest Edition) of following class and diameter
including all. taxes, insurance, transportation, freight charges,
octroi, inspection charges, loading, unloading, conveyance to
departmental stores, stacking etc. complete.and Lowering, 3 No. 5857.00 585.00 6442.00
laying and jointing in position following C. |. / D/F Reflux valves,
Butterflyvalves, Sluice valves and Air valves including cost of all
labour, jointing material,including nut bolts and giving
satisfactory hydraulic testing, etc. complete. 150 mm PN
5 Providing and supplying IS! mark Cl D/F Sluice Valves as per
1S:14846 (Latest Edition) of following class and diameter
including all. taxes, insurance, transportation, freight charges,
octroi, inspection charges, loading, unloading, conveyance to
departmental stores, stacking etc. complete. and Lowering, 1 No. 10295.00
laying and jointing in position following C. |. / D/F Reflux valves,
Butterflyvalves, Sluice valves and Air valves including cost of all
labour, jointing material,including nut bolts and giving
satisfactory hydraulic testing, etc. complete. 200mm PN
6 Providing and supplying IS} mark Cl D/F Butterfly Valves as per
1S:13095 (Latest Edition) of following class and ‘diameter
including all taxes, insurance, transportation, freight charges, 3 No. 4268.00 585.00 4853.00
octroi, inspection charges, loading, unloading, conveyance to
departmental stores, stacking etc. compleie.Lowering, laying
VOLUME: IV, Price Bid Augmentation of KOTHASANA
and jointing in position following C. |. / D/F Reflux valves,
Butterflyvalves, Sluice valves and Air valves including cost of all
labour, jointing material,including nut bolts and giving
satisfactory hydraulic testing, etc. complete. 150 mm PN
7 Providing and supplying IS} mark Cl D/F Butterfly Valves as per
1S:13095 (Latest Edition) of following class and ‘diameter
including all taxes, insurance, transportation, freight charges,
octroi, inspection charges, loading, unloading, conveyance to
departmental stores, stacking etc. compleie.Lowering, laying 1 No. 6116.00 742.00 6858.00
and jointing in position following C. |. / D/F Reflux valves,
Butterflyvalves, Sluice valves and Air valves including cost of all
labour, jointing material,including nut bolts and giving
satisfactory hydraulic testing, etc. complete. 200 mm PN
8 Providing and supplying ISI mark Cl D/F Reflux Valves as per
1S:5312 (Latest Edition) of following class and diameter
including all taxes, insurance, transportation, freight charges,
octroi, inspection charges, loading, unloading, conveyance io
departmental stores, stacking etc. complete.Lowering, laying 3 No. 8348.00 585.00 8933.00
and jointing in position following C. |. / D/F Reflux valves,
Butterfly valves, Sluice valves and Air valves including cost of
all labour, jointing material, including nut bolts and giving
satisfactory hydraulic testing, etc. complete.150mm PN
9 Providing and supplying ISI mark Cl D/F Reflux Valves as per
1S:5312 (Latest Edition) of following class and diameter
including all taxes, insurance, transportation, freight charges,
octroi, inspection charges, loading, unloading, conveyance io
departmental stores, stacking etc. complete.Lowering, laying 1 No. 16571.00
and jointing in position following C. |. / D/F Reflux valves,
Butterflyvalves, Sluice valves and Air valves including cost of all
labour, jointing material,including nut bolts and giving
satisfactory hydraulic testing, etc. complete.200 mm PN
VOLUME: IV, Price Bid Augmentation of KOTHASANA
10 Supply, installation, testing & commissioning of flange ends
Expansion Bellow as per EJMA standards of overall length of
minimum 300 mm, designed for 15 mm axial compression and
5 mm axial extension with tie rods etc. of following MOC &
pressure 3 No. 4896.00 incl. 4896.00
ratings. MOC: Bellows: SA 240 Gr. 304; Internal Sleeve: SA
240 Gr. 304; Weldends: IS 2062 Gr. B; Flanges: IS 2062 Gr. B
(Drilling as per IS1538 / IS 6392 ) & Limit Rods & Nuts: CS - IS
1367. NB 150mm width 300 mm,PN-1.6
11 Supply, installation, testing & commissioning of flange ends
Expansion Bellow as per EJMA standards of overall length of
minimum 300 mm, designed for 15 mm axial compression and
5 mm axial extension with tie rods etc. of following MOC &
pressure 1 No. 6576.00 incl. 6576.00
ratings. MOC: Bellows: SA 240 Gr. 304; Internal Sleeve: SA
240 Gr. 304; Weldends: IS 2062 Gr. B; Flanges: IS 2062 Gr. B
(Drilling as per IS1538 / IS 6392 ) & Limit Rods & Nuts: CS - IS
1367. NB 200mm width 300 mm,PN-1.6
12 Design, Supply, Installation, Testing, Commissioning of
Bourdon Type Pressure Gauge, ±1% accuracy, Direct bottom
1/2" NPT (M) process connection, IP 67, Glycerine filled, SS304
Case with Bayonet Type Bezel, SS316 L Bourdon Tube, SS
316 Movement material, Aluminium dial with black graduation
on white background, Micro Zero adjustable pointer, neoprene
gasket, Blow out disc, shatter proof glass, SS tag plate etc as
per IS 3624. 150 mm Dial Size,0 to 10 Kg/cm2
VOLUME: IV, Price Bid Augmentation of KOTHASANA
13 Design, Supply, Installation, Testing, Commissioning of Full
Bore Electromagnetic flow meter with factory calibrated,
Regular Power Operated, flanged connection, Flow sensor,
Indicator, transmitter and totaliser with all accessories viz. surge
arrestor, associated cables, cabinets, hardwares, etc complete
as per following specifications: Flow Meter/ Sensor:DC pulsed
type, IP 68 Protection, Flanged process connection as per IS
1538 or equivalent standard, SS304/ Metallic AlloyFlow Tube,
SS316/ SS 316 L/ Hastelloy Sensor, SS316/ Hastelloy
Grounding Ring/ Inbuilt Grounding Electrode, Neoprene/
Polyurethane/ Hard Rubber/ Rilsan lining, SS304/ Die Cast
Aluminium/ Carbon steel with Anticorrosive Paint Coil Housing
with Junction Box, CS flanges. Flow Transmitter/ Converter (
Remote Field Mounted):Microprocessor based, Modular design,
2 line LCD for indication of actual flow rate, forward, reverse,
sum totaliser display, ±0.5% accuracy at 0.3 to 4 m/sec velocity,
4 to 20 mA with HART/Modbus output, one scalable pulse, one
status output, IP 67 protection, Die cast aluminium/
polycarbonate/ SS316 with Anticorrosive Paint/ PU finish with
glass window enclosure, Inbuilt EEPROM and Data Logger,
meters cable length for sensor to transmitter communication etc
alongwith wall mounted/ stand mounted cabinet.Full Bore
Electromagnetic Flow Meter (Regular Power Operated)- PN
10,200mm Nominal Bore
14 Supply, installation, testing & commissioning M S fittings &
specials like bends, drilled flanges, bolts & nuts etc. of up to 300 500 kg 98.00 8.520 106.52
mm size & thickness as per actual requirement.
15 PUMP FOUNDATION: Providing & casting in situ reinforced
cement concrete in grade M 20 (Ratio 1:1.5:3) using quartzite
trap metal of size 6 mm to 12 mm for RCC work including
scaffolding centering, form work, needle vibrated consolidating, 30 Cum 10964.40
curing etc. including water proofing compound and providing,
cutting and binding required size TMT steel bars of Fe
grade with binding wire as directed by Engineer-in-charge for
VOLUME: IV, Price Bid Augmentation of KOTHASANA
pump & motor foundations & pipe support / thrust blocks.
16 Supply of rubber matting of 4 mm thickness as per
IS:15652/IEC 61111 of required length and breadth with good
insulation property for 11/22 KV.
17 Manufacture, Supply & Delivery of Electric Resistance Welded
(Up fo 400mm)/Submerged Arc Welded{Above 400mm)
M.S.Pipe having beveled ends plate or coil conforming to IS-
3589-2001 or its latest revision/ ammendment for following
thickness outside diameter at GWSSB store or site anywhere in
Gujarat State including all taxes, insurance, transportation,
freight charges, octroi, inspection charges, loading, unloading
conveyance to Departmental stores, stacking etc. all complete.
(Rate for MS Pipe based on the ex. works price of HR Coil as
Rs.67500.00 per MT - withouth GST (Above 3.15 mm to 10 24 RMT 5509.00 604.00 6113.00
mm) & Rs. 68000.00 per MT without GST (Above 10 mm) as on
Feb-22.( WPI Index of H. R Coil of Jan-22 is 155.8) and
Lowering, laying, jointing & welding in position to correct line &
level M.S. Pipe with outerside 3 LPE coating & inside solvent
free liquid epoxy lining on pedestal or chairsupon prepared
formation or prepared bedding in trenches the rates include
conveyance from store to site of work loading, unloading, heat
shrink sleéev jointing hydrotesting etc.complete. Pipe Dia.508
mm, thikness 6.3 mm-Sayra old HW Header
VOLUME: IV, Price Bid Augmentation of KOTHASANA
18 SITC of outdoor type, three phase, oil immersed, distribution
transformer of 315 KVA, Eff. Level-3 & voltage ratio, copper
double wound, vector group - Dyn11, HV delta connected & LV
star connected with neutral brought out connected to provide
separate earthing terminals, bushing / cable box on HV side
and cable box on LV side suitable for cables or bus duct as per
requirement with standard fittings, conforming to IS:
(Part-1) / 2014with its latest amendment including first fill of
transformer oil & following accessories.(a) Oil conservator with
filling holes with cap and prismatic oil level gauge.(b) Silica Gel
dehydrating breather charged with silica gel(c) Oil drain cum
sampling valve with plug(d) Oil filter valve(e) Lifting Eyes /
Hooks / Lugs(f) Two earthing terminal(g) Diagram and rating
plate(h) Air release plug(i) Explosion vent with diaphragm(j)
Thermometer pocket(k) Four bi-directional plain roller with base 1 No. 767678.00
channel with hauling holes(l) Fixed / Separate type radiator
banks(m) Off circuit externally operated tapping switch (For
rating < 1000 kVA)(n) 100 mm stem type oil temperature
indicator (For rating < 500 kVA)(o) Bucholtz relay with shut off
valve (For rating ≥ 500 KVA)(p) 150 mm dial type oil
temperature indicator with Alarm / Trip contact (For rating ≥
500 kVA)(q) 150 mm dial type winding temperature indicator
with Alarm / Tip contact (For rating ≥ 1000 kVA)(r) Marshalling
box (For rating ≥ 500 kVA)(s) 150 mm dia. magnetic type oil
gauge (For rating ≥ 1600 kVA)(t) Inspection cover & Jacking
lugs (For rating ≥ 1600 kVA)For transformer having oil storage
capacity for 2000 liters and higher, nitrogen injection fire
protection system (NIFPS) is to be provided For
Sathamba(khanda) HW
VOLUME: IV, Price Bid Augmentation of KOTHASANA
In Words Rs. Twenty Four Lakhs Seventy Five Thousand Six Hundred and Fifty Five Point Forty Eight only.
I / We am / are willing to carry out the work at % (in Figures) (in Words) Above /
Below the tendered estimated rates mentioned above. (Strike out below whichever is not applicable).
OFFER FOR BELOW: OFFER FOR ABOVE:
Estimated Cost Rs: 2475654.00 Estimated Cost Rs:
Less % Deduct Rs. . Above % Add Rs. .
Net Amount (Figures) Rs. . Net Amount (Figures) Rs. .
Net Amount (In Words) Rs. Net Amount (In Words) Rs.
Signature of Contractor Executive Engineer
Public Health Mechanical Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SD EMD GR 25-26.pdf
2 Volume II GCC AR Barnoli.pdf
3 Volume III EM Specifications Data sheets AR Barnoli.pdf
1 Volume I Technical Bid AR Barnoli.pdf
4 Volume IV Price Bid AR Barnoli 09.02.26.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .