Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAccepted-AOC 0 2 12 SIJUA TETULMURI DHANBAD DHANBAD JHARKHAND 828121 INDIA | DHANBAD | DHANBAD | JHARKHAND | 828121 | ₹2.4 L | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical AT LOYABAD PO BANSJORA DIST DHANBAD | DHANBAD | JHARKHAND | 818142 | - | - | Rejected-Technical Reject |
| 3 | Rejected-Technical ANGAR PATHRA P O KATRASGARH DIST DHANBAD DHANBAD JHARKHAND INDIA 828113 | DHANBAD | JHARKHAND | 828113 | - | - | Rejected-Technical Reject |
Tender Value
₹2.8 L
EMD Value
₹3,600
Closing Date
25 Mar 2026, 6:00 pmClosed
AREA MANAGER (ENM) KATRAS AREA
OFFICE OF THE GENERAL MANAGER BCCL KATRAS AREA IV ENM DEPT. Post-SIJUA PIN-828121 JHARKHAND
(1) COMPLETE REPAIRING/MACHININ G BALACINE OF 3 PHASE SQURAL CAGE,KW-187,RPM 1480 VOLT-3.3 V ROTOR SHAFT,MAKE KIRLOSKAR,SL.NO.3901 207-3 OF WITH MATERIALS LABOUR CHARGE
2026_BCCL_356730_1
BCCL/KA/IV/ENM/E-TEN/25-26/134 DT.18.3.2026
Open Tender
Electrical and Maintenance Works
10 days
AKWMC KATRAS AREA IV
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,600
29 Mar 2026
18 Mar 2026
26 Mar 2026
18 Mar 2026
25 Mar 2026
18 Mar 2026
18 Mar 2026 - 21 Mar 2026
ITEM DESCRIPTION / HEADLING
TAKING OUT BROKEN ROTOR SHAFT FROM ROTOR BY MACHINING JIG & FIXTURE WITH THE HELP OF PROCESS. (02X502.44+04X434.96 = 2744.72)
MAKING EDGE CENTRE BOTH SIDE IN FIXING FOR FINISHING OF SHAFT CENTER TO CENTER. (01X502.44+04X434.96 = 2242.28)
MACHINING OF ROTOR SHAFT BEARING SIZE. (01X502.44+04X434.96 = 2242.28)
THREADING OF SHAFT FOR CHECK NUT BOTH SIDE.(01X502.44+03X434.96 = 1807.32)
MAKING SIZING & POLISHING COUPLING JOURNALS,BEARING JOURNALS ROTOR BORE.(01X502.44+04X434.96 = 2242.28)
REPAIRING OF MOTOR DALA WELDING AND MACHINING OF BEARING & KEY SIZE OF BOTH SIDE.(01X502.44+04X434.96 = 2242.28)
REPAIRING OF HOUSING BEARING SIZE BOTH SIDE WELDING & MACHINING OF BEARING SIZE.(01X502.44+04X434.96 = 2242.28)
KEY WAY CUTTING IN POSITION OF ROTOR AND COUPLING BOTH SIDE. (01X502.44+04X434.96 = 2242.28)
RUPATON BRIZING ROD AS PER MARKET RATE.
COST OF OXYGEN CYLINDER
COST OF DA CYLINDER
HIRE CHARGES OF TOOLS & TACKLES & BALANCING OF SHAFT.
TRANSPORTING UP & DOWN & MANUAL LOADING & UNLOADING.
(2) COMPLETE REPAIRING/MACHINING & BALACINE OF 3 PHASE SQURAL CAGE,KW-187,RPM-1480 VOLT-3.3 V ROTOR SHAFT,MAKE-KIRLOSKAR,SL.NO.201138/8 OF WITH MATERIALS & LABOUR CHARGE AT AKWMC,OCP,KATRAS AREA.:- TAKING OUT BROKEN ROTOR SHAFT FROM ROTOR BY MACHINING JIG & FIXTURE WITH THE HELP OF PROCESS. (02X502.44+04X434.96 = 2744.72)
'MAKING EDGE CENTRE BOTH SIDE IN FIXING FOR FINISHING OF SHAFT CENTER TO CENTER. (01X502.44+04X434.96 = 2242.28)
'MACHINING OF ROTOR SHAFT BEARING SIZE. (01X502.44+04X434.96 = 2242.28)
THREADING OF SHAFT FOR CHECK NUT BOTH SIDE.(01X502.44+03X434.96 = 1807.32)
'MAKING SIZING & POLISHING COUPLING JOURNALS,BEARING JOURNALS ROTOR BORE.(01X502.44+04X434.96 = 2242.28)
REPAIRING OF MOTOR DALA WELDING AND MACHINING OF BEARING & KEY SIZE OF BOTH SIDE.(01X502.44+04X434.96 = 2242.28)
REPAIRING OF MOTOR DALA WELDING AND MACHINING OF BEARING & KEY SIZE OF BOTH SIDE.(01X502.44+04X434.96 = 2242.28)
KEY WAY CUTTING IN POSITION OF ROTOR AND COUPLING BOTH SIDE. (01X502.44+04X434.96 = 2242.28)
RUPATON BRIZING ROD AS PER MARKET RATE.
COST OF OXYGEN CYLINDER
COST OF DA CYLINDER
HIRE CHARGES OF TOOLS & TACKLES & BALANCING OF SHAFT.
'TRANSPORTING UP & DOWN & MANUAL LOADING & UNLOADING.
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.39 MB
BOQ_369592.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid