| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹69.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹77.5 L+₹8.0 L (11.5%)Rejected-Finance | L2 | Rejected-Finance L2 Bidder | |
| 3 | Rejected-Technical | - | Rejected-Technical SBD not submitted |
| Sl No | Description | Qty | Unit | SKC L2 | Abdul Khalam L1 | T G SUNOJ L3 |
|---|---|---|---|---|---|---|
| 1.00APPENDIX- A detailed estimate | ||||||
| 1.00 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 5 | each | 313 ₹1,565 Lowest | 313.16 ₹1,565.8 | 425.15 ₹2,125.75 |
| 1.00 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | 5 | each | 561 ₹2,805 Lowest | 561.26 ₹2,806.3 | 561.26 ₹2,806.3 |
| 1.00 | 50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 5 | each | 764 ₹3,820 Lowest | 764.37 ₹3,821.85 | 764.4 ₹3,822 |
| 1.00 | 14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done . | 1,480 | sqm | 309 ₹4,57,320 | 280 ₹4,14,400 Lowest | 303.65 ₹4,49,402 |
| 1.00 | OD113870/2024-2025:Hire and labour charges for providing putting up view cutter with green shade net over the scaffolding which already provided etc. completed | 200 | sqm | 41 ₹8,200 Lowest | 41.25 ₹8,250 | 41.25 ₹8,250 |
| 1.01 | 15.31:Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | 1,068.96 | sqm | 179 ₹1,91,344.74 | 162 ₹1,73,172.33 Lowest | 176.54 ₹1,88,715.08 |
| 1.01 | OD128424/2024-2025:Hire and labour charges for covering roof with tarpulin / silpaulin tying with coir rope to prevent the damages of wooden roof members from bad weather etc. complete | 1,068.96 | sqm | 145 ₹1,54,999.93 | 132.25 ₹1,41,370.62 Lowest | 144.95 ₹1,54,946.48 |
| 1.01 | 15.14.1:Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:Of sectional area 40 square centimetres and above | 27 | cum | 4,000 ₹1,08,016 | 3,750 ₹1,01,265 Lowest | 4,012.48 ₹1,08,353.01 |
| 1.01 | 15.39.2:Dismantling wooden boardings in lining of walls and partitions, excluding supporting members but including stacking with in 50 metres lead:Thickness above 10mm upto 25 mm | 173.1 | sqm | 68 ₹11,770.8 Lowest | 68.72 ₹11,895.43 | 68.74 ₹11,898.89 |
Tender Value
₹72.8 L
EMD Value
₹50,000
Closing Date
27 Jun 2025, 5:00 pmClosed
Executive Engineer
Executive Engineer PWD Buildings Division Kollam
GENERAL Renovation of tiled roof in police museum Kollam repair works General Civil Work
2025_PWD_764938_2
PWD/BLDG/TR/95149/2021
Open Tender
Civil Works - Buildings
Item Rate
300 days
Kollam
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
8 Sept 2025
21 Jun 2025
30 Jun 2025
21 Jun 2025
27 Jun 2025
21 Jun 2025
Amount
APPENDIX- A detailed estimate
50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete
50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done .
OD113870/2024-2025:Hire and labour charges for providing putting up view cutter with green shade net over the scaffolding which already provided etc. completed
15.31:Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead.
OD128424/2024-2025:Hire and labour charges for covering roof with tarpulin / silpaulin tying with coir rope to prevent the damages of wooden roof members from bad weather etc. complete
15.14.1:Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:Of sectional area 40 square centimetres and above
15.39.2:Dismantling wooden boardings in lining of walls and partitions, excluding supporting members but including stacking with in 50 metres lead:Thickness above 10mm upto 25 mm
15.7.3:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In lime mortar
15.23.1:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm
50.9.1.1:Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length (hold fast lugs or dash fastener shall be paid for separately), using good quality Anjili wood /jack wood
50.9.13.4:Supplying and fixing Dept. wood wrought and put up for roof members including cost and conveyance of materials etc. complete.
12.5.1:Providing valleys of 90 cm wide overall in plain G.S. sheet fixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.I. limper and bitumen washers complete:1.60 mm thick with zinc coating not less than 350 gm/ m2
50.9.14.1:Supplying and fixing Anjily wood reapers of size 50x25 mm with wire nails including cost and conveyance of materials etc. complete.
OD129896/2024-2025:Protective coating to the wooden roof members two or more times as instructed by the departmental officer ai site with CNS ( cashew shell oil ) mixed with diesel at 1:1 ( 1 diesel & 1 CNS oil ) including all the cost of materials and labour charges etc.
12.48:Providing & fixing on roof pressed clay tile (Mangalore tile) of 20 mm nominal thickness and of approved size and as per approved pattern on steel frame work complete (steel frame work to be paid separately)
OD139555/2024-2025:Cleaning old roof tiles
OD139550/2024-2025:Roofing with departmental mangalore tiles
12.49:Providing & laying on roof pressed clay tile ridge (Mangalore tile) of 20 mm thickness and of approved pattern on steel frame work complete (steel frame work to be paid separately ).
OD139551/2024-2025:Providing and fixing false ceiling with 9 mm thick PVC TKT panel board (pure white) of approved quality in aluminium frame work with necessary screws etc complete (aluminium frame work shall be paid separately)
21.1.1.1:Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate Z sections and other sections of approved make conforming to IS : 733 and IS: 1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminnium snap beading for glazing /paneling, C.P. brass/ stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-charge.(Glazing, paneling and dash fasteners to be paid for separately): For fixed portionAnodised aluminium (anodised transparent or dyed to required shade according to IS : 1868, Minimum anodic coating of grade AC 15)
15.13.1:Taking out doors, windows and clerestory window shutters (steel or wood ) including stacking within 50 metres lead:Of area 3 sq. metes and below
50.14.1.1:Removing and refixing door shutters after necessary repairs for easy opening and closing etc complete as per the direction of site Engineer-in-charge.
50.9.3.1:Providing and fixing paneled or paneled and glazed shutters for doors, windows and clerestory windows, 30 mm thick shutters including ISI marked M.S. pressed butt hinges bright finished of required size with necessary screws, excluding paneling which will be paid for separately, all complete as per direction 0f Engineer in- charge. using Anjili/ Jack wood
50.9.4.1:Providing and fixing paneling or paneling and glazing in paneled or paneled and glazed shutters for doors, windows and clerestory windows (Area of opening for panel inserts excluding portion inside grooves or rebates to be measured) paneling for paneled or paneled and glazed shutters 25 mm to 40 mm thick using good quality Anjili/ Jack wood
15.56:Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
OD113995/2024-2025:Flooring with terracotta tiles of size 225*225mm laid on cement mortar 1:4 ( 1 Cement : 4 Coarse sand with 6mm open joints, grouted and pointed with cement mortar 1:2 ( 1 cement:2 fine sand)
14.1.2:Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead:Cement mortar 1:4 ( 1 cement: 4 coarse sand)
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
14.46:Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.
OD139553/2024-2025: Hire and Running charges of Tipper
OD139554/2024-2025:Hire and Running charges of hydraulic excavator
13.48.1:Finishing with Deluxe Multi surface paint system for interiors and exteriors using primer as per manufacturers specifications:Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of special primer applied @ 0.75 ltr /10 sqm
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
2.1.1:Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
16.91.2:Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in-Charge.80 mm thick C.C. paver block of M-30 grade with approved color design and pattern.
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for: Edges of slabs and breaks in floors and wallsUnder 20 cm wide
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
OD139558/2024-2025:Engaging Woodcutter
OD139560/2024-2025:Engaging carpenter (second class)
OD139561/2024-2025:Engaging Mancoolie
SKC (BID ID -2234413)
T G SUNOJ (BID ID -2233483)
Bidder Name
Abdul Khalam
T G SUNOJ
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1257878.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .