Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.8 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹8.6 L+₹76,349.22 (9.80%)Rejected-AOC | L2 | Rejected-AOC second lowest |
| Sl No | Description | Qty | Unit | K Gopakumar L1 | A SHIBU L2 |
|---|---|---|---|---|---|
| 1.00Painting | |||||
| 1.00 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 0.6 | cum | 2,390.19 ₹1,434.11 Lowest | 2,624.32 ₹1,574.59 |
| 1.00 | 15.12.1:Dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:Of area 3 sq. metres and below | 2 | each | 360.44 ₹720.88 Lowest | 395.75 ₹791.5 |
| 1.00 | 15.13.1:Taking out doors, windows and clerestory window shutters (steel or wood ) including stacking within 50 metres lead:Of area 3 sq. metres and below | 2 | each | 140.84 ₹281.68 Lowest | 154.63 ₹309.26 |
| 1.00 | 15.23.1:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | 9 | sqm | 72.04 ₹648.36 Lowest | 79.1 ₹711.9 |
| 1.00 | 15.7.1:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In mud mortar | 1.8 | cum | 692.04 ₹1,245.67 Lowest | 759.83 ₹1,367.69 |
| 1.01 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 0.7 | cum | 2,414 ₹1,689.8 Lowest | 2,650.46 ₹1,855.32 |
| 1.01 | 13.111.2:Finishing walls with Acrylic Smooth exterior paint of required shade :Old work (One or more coat applied @ 0.90 ltr/10 sqm). | 1,460.67 | sqm | 89 ₹1,29,999.27 Lowest | 97.72 ₹1,42,736.28 |
| 1.01 | 13.98.1:Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade:One or more coats on old work | 1,317.91 | sqm | 108.2 ₹1,42,597.75 Lowest | 118.8 ₹1,56,567.59 |
| 1.01 | 13.114:Melamine polishing on wood work (one or more coat). | 358.9 | sqm | 140.91 ₹50,573.16 Lowest | 154.71 ₹55,526.04 |
Tender Value
₹8.4 L
EMD Value
₹20,975
Closing Date
18 May 2026, 5:00 pmClosed
AEE
O/o the AEE, PWD, KLC Subdivision No.1, TVPM
GENERAL Hon. Speaker Quarters Painting and Maintenance of Speaker Quarters General Civil Work
2026_PWD_849702_1
DB1/PWD/BLDG/TR/943/2026
Open Tender
Civil Works - Buildings
Item Rate
120 days
KLC, TVPM
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,850
₹20,975
24 Jun 2026
12 May 2026
20 May 2026
12 May 2026
18 May 2026
12 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Painting | |||||
| 1.001 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | - | cum | - | - |
| 1.002 | 15.12.1:Dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:Of area 3 sq. metres and below | - | each | - | - |
| 1.003 | 15.13.1:Taking out doors, windows and clerestory window shutters (steel or wood ) including stacking within 50 metres lead:Of area 3 sq. metres and below | - | each | - | - |
| 1.004 | 15.23.1:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | - | sqm | - | - |
| 1.005 | 15.7.1:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In mud mortar | - | cum | - | - |
| 1.006 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | - | cum | - | - |
| 1.007 | 13.111.2:Finishing walls with Acrylic Smooth exterior paint of required shade :Old work (One or more coat applied @ 0.90 ltr/10 sqm). | 0.4 | sqm | - | - |
| 1.008 | 13.98.1:Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade:One or more coats on old work | 0.6 | sqm | - | - |
| 1.009 | 13.114:Melamine polishing on wood work (one or more coat). | 0.6 | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1435770.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.04 MB
BOQ_1435770.xls
BOQ • 0.34 MB
viewnit.pdf
Tender Documents • 0.02 MB
GST.pdf
Tender Documents • 0.14 MB
integritypactcertificate.pdf
Tender Documents • 0.15 MB
license.pdf
Tender Documents • 0.18 MB
Requisitionforepayment.pdf
Tender Documents • 0.15 MB
viewsbd.pdf
Tender Documents • 1.63 MB
preagreement.pdf
Tender Documents • 0.09 MB
Affidavit.pdf
Tender Documents • 0.19 MB
Bidsubmissionletter.pdf
Tender Documents • 0.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .