Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 CrAdmitted-Finance | +0.00% | ₹2.0 Cr | L1 | Admitted-Finance |
| 2 | L1₹2.0 CrAdmitted-Finance | +0.00% | ₹2.0 Cr | L1 | Admitted-Finance |
| 3 | L1₹2.0 CrAdmitted-Finance | +0.00% | ₹2.0 Cr | L1 | Admitted-Finance |
| 4 | L1₹2.0 CrAdmitted-Finance | +0.00% | ₹2.0 Cr | L1 | Admitted-Finance |
| 5 | L1₹2.0 CrAdmitted-Finance AT MADHIPUR WARD NO 10 PO PS KONARK DIST PURI PIN 752111 | PURI | ODISHA | 752111 | +0.00% | ₹2.0 Cr | L1 | Admitted-Finance |
Tender Value
₹2.0 Cr
EMD Value
₹2.0 L
Closing Date
5 May 2026, 5:00 pmClosed
Chief Construction Engineer
O/o ChiefConstructionEngineer,CentralRWCircle,BBSR
Construction of road from PWD road to Bansidharpur under MMSY-CMRL Scheme in the district of Puri for the year 2025-26
2025_CERWI_122453_6
Tender Online C.C-32 of 2025
National Competitive Bid
Civil Works - Roads
Percentage
180 days
Nimapara
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹2.0 L
Yes
15 Jul 2026
29 Apr 2026
6 May 2026
29 Apr 2026
5 May 2026
29 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Road Construction
Dismetalling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock pilling at designated locations and diposal of dismantled materials upto a lead of 1000m , stacking serviciable and unserviceable materials separately as per Technical Specification and as per direction of the Engineer-in-Charge. | 75 | Cum | 1,730.33 | ₹1,29,774.75 |
| 2 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead as per Technical Specification Clause 202 of MoRD by manual means & as per direction of the Engineer-in-Charge.
i) Stone/brick masonry | 7.2 | Cum | 1,611.74 | ₹11,604.53 |
| - | ii) Upto 600mm dia | 15 | Rmt | 291.53 | ₹4,372.95 |
| 3 | Excavation for road work in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5m and lead upto 1000m as per Technical Specification Clause 302.3 of MoRD. | 458.01 | Cum | 74.79 | ₹34,254.57 |
| 4 | Construction of embankment with approved material obtained from borrow pits with all lifts & leads, transporting to site by mechanical means, spreading, grading to required slope and compacting to meet requirement of Tables 300.2 & clause 305 of MoRT&H specification for Road & Bridge works as per direction of the Engineer-in-Charge. | 7,483.23 | Cum | 201 | ₹15,04,129.23 |
| 5 | Construction of embankment with approved materials deposited at site from road way cutting and excavation from drain & foundation of other strutures graded & compacted to meet the requirement of Tables 300.1 & 300.2 as per clause no.301of MORD specification for Rural roads and as per direction of Engineer-In-Charge. | 1,015.22 | Cum | 50.4 | ₹51,167.09 |
| 6 | Construction of granular sub-base by providing Close graded Granular subbase Grading-III material as per table 400-1, spreading in uniform layers with motor grader on repared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density complete as per Clause 401 of MoSRT&H Specifications for Road & Bridge works (4th Revision) and as per direction of Engineer in Charge | - | Cum | 2,768.78 | - |
| 7 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/ base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per Clause 406 of MoSRT&H Specifications for Road & Bridge works (4th Revision) and as per direction of Engineer in Charge | - | Cum | 3,260.91 | - |
| 8 | Earthwork in excavation for foundation of structures in all kinds of soil upto 3 m depth as per drawing and technical specification Clause 305 of MORD specification for Rural roads includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, and disposal up to a lead of 50m, dressing of sides and bottom and backfilling with excavated suitable materials and as per direction of Engineer-in-charge. | - | Cum | 241.48 | - |
| 9 | Filling in foundation trenches with approved quality of sand as per drawing and technical specification clause 1108, 305.3.9 & 1200 of MORD and as per direction of Engineer in charge. | - | Cum | 528.7 | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.01 MB
Tendernotice_2.pdf
PDF • 2.86 MB
BOQ_569999.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .