Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹10.0 L
EMD Value
₹9,996
Closing Date
26 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Dy.Minicipal Commissioner - West Zone
regarding leakage and pollution complaints, as well as the installation of new water pipelines, in various *chawls* (tenements) located in the , and in other areas such as Juna Vadaj, Usmanpura, and Bhimjipura. Stadium Ward of the West Zone ARC (Annual Rate Contract)
367578
3/26-27 (T.N. 68)
Open
Civil Works - Others
Works
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹900
Municipal Commissioner, Ahmedabad
₹9,996
24 Nov 2026
24 Nov 2026
24 Nov 2026
26 Nov 2026
24 Nov 2026
120 days
Item No.21:- Extra rate over item of excavation of earth for excavation of asphalt pavement of thickness up to
meter including demolishing the asphalt carpet,metal,soiling etc.comp. with stacking the material as
extra rate for excavation of asphalt pavement of any thickness including demolishing the
asphalt carpet, metal, soiling etc. complete with stacking the materials as directed. The road surface
of asphalt shall carefully be opened to full width as directed by the Engineer in charge Asphalt,
popada's souls, metals etc shall be separately deposited in such places as may be determined by the
Engineering-charge. In case above materials not being so deposited or being mixed up with the
excavated materials will not be allowed for refilling. The cost of materials shall be charged from the
contractor. The decision of the C.E. shall be final and binding to the contractor. The rate per sq. mt.
in this item shall be paid extra addition to the rate for excavation.
For detailed specification refer 5th revision of MORTH (2013) & also amendment shall be applicable
to the latest versions.
Mode of measurement
Measurement shall be given in Smt Basis.
Item No.22 :- Supplying Pneumatic Breaker Machine for RCC Slab or Asphalt Demolishing Work on site by using
Operator, fuel, power Supply etc. Complete as Directed. (No payment should be allowed for non working
condition of machinery and for pipe line excavation and M.H. work.)
SABARMATIWARD -
The Item Shall include various operation cost. Such as diesel, Driver, Salary, Electrification, etc.
The Work Shall Carried out on risk of Contractor.
The Work Shall be done as per Engg. in charge.
Mode of measurement
Measurement shall be given in Hr. Basis.
Item No.23:- Providing, Supplying JCB Breaker Machine on rental basis for demolish RCC, asphalt etc. demolition type
work and & also during unavoidable condition as per instruction of engg.in-charge. Rates included all
necessary shifting, fuel and operating charges.
The Item Shall include various operation cost. Such as diesel, Driver, Salary, Electrification, etc.
The Work Shall Carried out on risk of Contractor.
The Work Shall be done as per Engg. in charge.
Mode of measurement
Measurement shall be given in Hr. Basis.
Item No.24:- Providing & Supplying JCB Machine on rental basis in case of emergency situation and break down type
work & also during unavoidable condition as per instruction of engg.incharge , rate includes all nece.
shifting, fuel and operating charges and stacking of useful & non-useful materials separately up to store.
(No payment should be allowed for non working condition of machinery and for pipe line excavation and
laying work) ( Based on Previously approved rate by C E sir.
The Item Shall include various operation cost. Such as diesel, Driver, Salary, Electrification, etc.
The Work Shall Carried out on risk of Contractor.
The Work Shall be done as per Engg. in charge.
Mode of measurement
Measurement shall be given in Hr. Basis.
Item No.25:- Providing and operation dewatering Pump including fuel charges & operator Charges etc. as directed etc.
comp. (Shift for Eight Hour) (For Each Pump Set, No payment should be allowed for non working condition
of machinery) (Based on Previously approved rate by C E sir )
Providing and Operation Honda Pump including fuel charges & Operation as directed etc.
complete as directed by Engg. in charge.
Mode of measurement
Measurement shall be given in Shift Basis.
Item No.26 :- Providing, laying and jointing in true line and level U.P.V.C pipe (SCH - 40) of following dia. including fittings
of standard make as approved by Engineer - in - charge. Pipe shall be fixed on the wall with the help of
clamp at every 2000 mm centre to centre or shall be concealed as directed including necessary fittings etc.
including testing of pipe and joints and fixing the same with adhesive solvent, including cost of all
materials. (As per uilding SOR 2015-16)
SABARMATIWARD -
Mode of measurement
Measurement shall be given in Rmt Basis.
Item No.27:- Providing , Supplying and using size 15 to 50 mm dia. PVC pipe line up to 1 mtr length with material like
pipe, coupler, union, Elbow tee, end cap, bend, F.T, M.T, Tail piece, reducer, M-seal, solution, Excavation
per day per ward including labour and fitter to prevent leakage etc. and Fixing with existing PVC/DI/C line
per inst. of engg. in charge. Excavation including Labour and fitter.
Mode of measurement
Measurement shall be given in No. Basis.
Item No.28:- Providing , Supplying and using of up to 50 mm To 75 mm dia. Pvc Pipe line For Braking Connection Up to
1Mtr Length with material like pipe, coupler, union, Elbow tee, end cap, bend, F.T, M.T, Tail piece, reducer,
M-seal, solution, Excavation per day per ward including labour and fitter to prevent leakage etc. and Fixing
with existing PVC/DI/C line per inst. of engg. in charge. Excavation including Labour and fitter.
Mode of measurement
Measurement shall be given in No. Basis.
Item No.29:- Labour charge for cutting of existing P.V.C. pipeline for making branch connection & existing P.V.C. tee,
collar and other specials like topper etc. if required. The item including excavation dewatering of trenches
and pipe line, cutting of existing pipeline, including carting of pipe & surplus earth upto 50mt. lead etc.
comp the work is to be completed in stipulated time limit without interruption of regular water supply. The
rate include all necessary precautionary measures to prevent any lane slide in trench and P/F safety grad
board on road slide. The joint should be made water tight slide. The joint should be made water tight and
leak free etc complete as instruction given by engg in charge.
Mode of measurement
Measurement shall be given in No. Basis.
Item No.30:- Providing, Supplying and fixing PVC TEE including labour cost for leakage 6 kg/cm.smt instr of engg. in
Mode of measurement
Measurement shall be given in No. Basis.
Item No.31:- Providing, Supplying and fixing with labour cost Elbow for leakage PVC 6 kg/cm.smt instr of engg in charge
Mode of measurement
Measurement shall be given in No. Basis.
Item No.32:- Providing, Supplying and fixing with labour cost End cap for leakage PVC 6 kg/cm.smt instr of engg in
Mode of measurement
Measurement shall be given in No. Basis.
Item No.33:- Providing,Supplying and fixing with labour cost Band for leakage PVC 6 kg/cm.smt instr of engg in charge.
SABARMATIWARD -
Mode of measurement
Measurement shall be given in No. Basis.
Item No.34:- Providing,Supplying and fixing with labour cost Reducer for leakage PVC 6 kg/cm.smt instr of engg in
Mode of measurement
Measurement shall be given in No. Basis.
Item No.35:- Providing, Supplying and fixing to wall ceiling and floor 6 kg.f / cm. smt working pressure polyethylene
pipe of the following outside dia Low density complete with special flange Empression type fitting wall clips
etc incl. making good the wall ceiling and floor.
Mode of measurement
Measurement shall be given in Rmt Basis.
Item No.36:- Providing, Supplying and fixing Chek nut for Sluice valve CI/MS/GM or Brass instr of engg in charge.
Mode of measurement
Measurement shall be given in No. Basis.
Item No.37:- Providing, Supplying and fixing Spindle for Sluice valve CI/MS/GM or Brass instr of engg in charge.
Mode of measurement
Measurement shall be given in No. Basis.
Item No.38:- Providing, Supplying and Laying diff dia sluice valves Glen dory leakage repairing the excavation in any type
of soil, refilling, necessary nuts, bolts etc complete as engg in charge.
Mode of measurement
Measurement shall be given in No. Basis.
Item No.39:- Job work for checking water pressure on exiting line as per instruction of engg in charge. Rate includes
excavation of trial pit, making hole of 15 mm dia, fixing UPVC pipe up to 1.5 met height, fixing pressure
gauge. After gauging, fixing pakka butch followed by pecking & compacting the filled up soil etc completed
as directed by engg, in charge.
Mode of measurement
Measurement shall be given in No. Basis.
Item No.40:- Supplying, labour for excavation of all types of soil at any depth including excavation of asphalt pavement
of any thickness, demolition of brick work in CM of any proportion including stacking of serviceable
materials and disposal of unserviceable material etc. comp. as directed.
Supplying, labor for break down repairing work for activities like excavation, disliting, removing
debris from trench back filling etc. comp. as directed by Eng .in charge.
Mode of measurement
Measurement shall be given in No Basis.
SABARMATIWARD -
Item No.41 :- Supplying of Lead as per instruction of engg. In charge (Rate As per Microtech - Item Code-
Mode of measurement
Measurement shall be given in Kg. Basis.
Item No.42:- Supplying of jute (Spun Yarn) as per instruction of engg. In charge (Rate As per Microtech - Item Code-
Mode of measurement
Measurement shall be given in Kg. Basis.
Item No.43:- Barricading the entire break down or excavated area on rental basis using wooden ballies / M.S.angles at
max. 2.00 meter centre to centre, C.G.I. Sheet, reflective paint / Board outside to avoid accident & for
smooth traffic diversion & movement including cautionary board etc. Item also includes for making
temporary sufficient nos of lighting arrangement through-out the work with necessary required
arrangement. The same shall be removed after completion of work.
Mode of measurement
Measurement shall be given in Rmt Basis.
Item No.44:- Box cutting the road surface in all sorts of soil, murrum to proper slope & camber for making a base for
road work including removing the excavated stuff & depositing on the road side as directed up to
Mode of measurement
Measurement shall be given in cmt Basis.
Item No.45:- Labour work for reinstatement or asphalt pavement covering excavation watering consolidation resoiling
meating with the activity of teackcoat including carting the mix from the nearest store pacting it with
conveyance charge of excavation earth etc.comp as directed.
Mode of measurement
Measurement shall be given in Smt Basis.
Item No.46:- Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification
including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by
tipper to site, laying in uniform layers in sub- base / base course on well prepared surface and compacting
with vibratory roller to achieve the desired density as per Codal Provision. (RA Approved St.Com.Res
Mode of measurement
Measurement shall be given in cmt Basis.
Item No.47:- Hiring of Tractor with trolley considering 8 Hrs. As working Day hours inclu. Driver (GWSSB SOR -22-23
Section 2E- Miscellaneous Item no. 7)
Mode of measurement
Measurement shall be given in DAY Basis.
SABARMATIWARD -
And All type ON SITE Material responsibility only Labour contractor.
APPLICABLE CODES:
Various operations such as transport to work sites lowering in trenches laying jointing and field testing of cast
iron pipes and fittings shall comply with all currently applicable standards. In all cases the latest revision of the
standards shall be referred to. If requirements of this specification conflict with the requirements of the standards
this specification shall grove.
(a) IS:638Specificationforsheetrubberjointingandrubberinsertingjointing.
(b) IS:782Specificationforcaulkinglead.
(c) IS:1538SpecificationforcastionfittingsforPressurepipesforwatergasandsewage.
(d) IS:3114Codeofpracticeforlayingofcast-iron.
(e) IS:3400Methodsoftestforvulcanizedrubber(Partsto20)
(f) IS:5382SpecificationforrubbersealingringforGasmainswaterandsewers.
(g) IS:6587Specificationforspun/yarn.
CARTINGANDHANDLING:
Cast iron pipes fittings (specials) and valves with tail pieces shall be transported from the Municipal Stores or
contractor’s stack yard to the work sites at places along the alignment of pipeline as directed by Owner /Engineer.
The Contractor shall be responsible for the safety of pipesfittingandvales withtailpiecesintransit
loading/unloading.Everycare shallbeexercisedin handling pipes and fittings to avoid damage. While unloading the
pipes and fittings shall with steadying ropes of by any other means. Padding shall be provided between coated pipes
fittings and skidstoavoiddamagetothecoatingSuitablegapebetweenpipesshouldbelift at intervalsin order to permit
access from one side to the other. In case of spigot socket pipes care should be taken regarding orientations pipes
while unloading. As far as possible pipes shall be ulna addedon one side of the stretch only. Thepipesshallbe checked
for any visibledamage (suchas broken edges cracking or spelling of pipe) while undo adding and shall be sorted out
for reclamation any pipe which shows sufficient damage to preclude it from being used shall be discarded shall be
prohibited. Necessary warning boards and lamps should be provided in front and side of pipes to avoid any
accident.Pipesshouldbe stacked withsufficient packingtoprevent rollingof the same. Contractor will be fully
responsible for any accident due to pipes or other materials stacked on site of yard. Contractor will be fully
responsible for any legal formalities arising due to such accident and all legal charges there of shall be paid by
contractor of will be recovered from his running bill of the same or other AMC works.
SABARMATIWARD -
Each stack of pipes shall contain only pipes of same class and size, with consignment or batch number
marked on it with particulars of supplies wherever possible storage shall be done on film level and clean ground and
wedges shall be provided at the bottom layer to keep thestackstable. Thestackshallbe inpyramidshapeorthelaid
lengthwise andcrosswise inaltimeter layers.Thepyramidstackshallbe madeforsmallerdiameterpipesforconserving
spacein storing them.The height of the stock shall not exceed 1.5m. Fitting and sluice valves with tail piecesshall be
stacked under coverand separated frompipes. Rubberringsshallbe stored in clean coolstore away from windows
boiler electrical equipment and petrol oils or other chemicals Particularly in the field where the rubber nods are
being used it is desirable that they are left out on the ground in the sun or overmuch under heavy frost of snow
The Contractor shall visit the before tendering and get himself acquainted site condition and the regulations
regarding the laying of pipes in congested areas heavy traffics areas etc. The successful bidder shall take the
necessary permission and clearance of all the authorities like department of ads traffic water supply and the drainage
electricity broad telephone comp anyetc. Wherever necessary.
Roadreinstatementshallnotbeincludedinbackfillingunlessspecified.
To protect person from injury and to avoid damage to property adequate barricades construction signs red
lanterns and guards as required shall be placed and main lined during the progress of the construction work and unit
it is safe for the traffics to use the roadways. The relevant Indian standards and the rules and regulations of the local
authorities in regarded to safety provisions shall be observed.
General lighting for works site, warning lights, sign boards, fencing etc. shall be provided by contractor at his
Suitable fencing shall be provided along the sides of trenches and pits. The post of the fencing shall be of
timber securely fixed in the ground not more then 3m.apart and they shall be less than 75 mm in diameter of less
than 1.2 m above the surface of the ground. There shall be two rails. One near the top of the post and the other
about 450 mm. Above the ground and each shall be from 50mm to 70mm in diameter and sufficiently long to run
from post to post which they shall be bound with strong rope. The method of projecting rails beyond the posts and
tying them together where they meet will not be allowed on any account. All along the edges of the excavated
trenches a bank of earth about 1.2. m high shall be formed as required by the Owner/Engineer for further protection.
The above work shall not be paid for separately and the contractor shall take into account the costs of such works
and quote accordingly.
Whole work shall done within 24 hrs. by parts or whole work so that water supply from AMC shall not be
The excavation in the foundation shall be carried out in true and level and shall have the width and depth as
required and as directed. The Contractor shall provide necessary slopes to a
safeangleorstepsasrequiredordirectedathisowncostNoextrapaymentshallbemadefor
SABARMATIWARD -
such precautionary measures taken. The bottom of the excavated area shall be leveled both longitudinally and
transversely as directed by removing excess soil and watering as required. No earth filling will be allowed for bringing
it to level if by mistake or any other reason excavation is made deeper or wider than asdirected. The extra depth or
width shallbe made up with concrete of the same proportion as specifiedfor the foundation concrete at the cost of
the contractor.The excavation up to any required depth shall be carried out under this item as required and directed
by engineer in charge.
SurfaceExcavationforRoadWork:
Excavation exceeding 1.5 mm in width and 10 sq mm on plan but not exceeding 30 cm in depth in all kinds
of soil which are specified shall be as treated as surface excavation.
Excavationintrenchesforservicelines-WatersupplyandDrainage:
Excavation in trenches shall be carried out in any material encountered on the site to enable the service
lines to be laid to the lines and levels shown and as directed. Excavation shall be made with adequate and stable side
slopes or shoring strutting if necessary. The contractor shall provide all measures to protect adjoining properties
service limes etc. The contractor shall take necessary action to keep excavation free from water.
Trenches shall be wide enough to provide sufficient space for joining and inspection. The trench bed shall be
trimmed and rammed with sprinkling of sand or murmur so that the pipes when laid to the required levels and
gradients shall be no the bottom fully supported along the entirelengthofthepipe.Thetrenchshall
bedeepenedandwidenedlocallyto receivethesockets and to permit the joint to be made and inspected.
Before excavation is started rails shall be erected at convenient places and at all changes of direction and
gradients at a definite and as far as practicable uniform height above the proposed invert level of the pipes the
center lime being clearly marked on each horizontal rail. The depth of excavation and level of the pipe invert shall be
checked by means of benching road of appropriate lengths.
DisposaloftheExcavatedStuff:
The excavated stuff of the selected type shall be used for filling the trenches and plinth or leveling the
ground in layers including ramming and watering etc. complete. The Contractor shall remove the balance of the
excavated from the site of work to a place as directed within a lead unto 50mm and for all lift.
FilingofTrenches:
As soon as the work in foundation has been completed and measured the sides of foundation shall be
cleared of all dedans brick bats mortar dropping etc. and filled with earth in layers not exceeding 15 cm Each layer
shall be adequately watered rammed well andconsolidated before the succeeding layer is laid. The earth shall be
rammed with iron rammers where feasible and with the butt ends in layer of crowbars where rammer cannot be
used. The plinth shall be similarly filled with earth in layers not exceeding 15 cm adequately watered and
consolidated by ramming with iron or wooden rammers. When filling reaches finished level the
surfaceshallbefloodedwith waterforatleast24hoursand allowedtodryandthenrammedand consolidated. The finished
level of filing shall be kept to shape and gradient intended to receive any floor finish. The excavated stuff of the
selected type only shall be allowed to be used forfilling the trenches and plinths. Under no circumstances black
cotton soil shall be used for filling the plinths.
SABARMATIWARD -
FILLINGMATERIALS:
Filling materialsmay be either excavated stuff ofselected materialsbrought fromoutside. Excavated stuff or
selected earth to be used shall be cleared of all rubbish large size stones brick batsetc. complete andbig clodsshallbe
brokendown toasizeof50mmor less. Theselectedsoil and or murmur or any other materials shall be got approved
before filling.
Refilling shall be done in a systematic manner by the contractor before refilling starts, the contractor shall got
checked the trenches ready for refilling.
The space between foundation masonry concrete pipe line and the sides of excavation and/or bottom of
found at ion shall be refilled to the original surface or up to plinth level with earth or selected materials in layers of
15 cm to 20 cm each well watered and rammed.
Each layer shall be watered and compacted with heavy rammer before the upper layer is laid till the final level is
reached to form a thoroughly compacted base.
Refilling on top of pipe shall be carried out carefully with selected soft stuff out of the excavated stuff. The
refilling shall be raised about 5 cams. For subsequent settlements.
Thecontractorshallberesponsibleforanysettlementduringpassageoftime ofduringmonsoon and the same shall be
refilled with stuff brought from the out side if necessary.
The process of refilling brunches in plinth watering ramming shall be carried out in such a way as not to
danger to pipe line for foundation footing plinth well etc. already laid or built up.
If watering isnot done by contractor with its own arrange meant watering charges at 20% of this item rate
shall be deducted from the bill against this item.
The rubber ring shall be stored in a cool dark dry and dust free environment The storage shall not be
exposed to direct sunlight or any heat radiating appliance. The rings shall not be allowed to come in contact with any
fuels and shall be stored free of tension.
Rubber rings shall be clearly labeled in bundles to indicate the type of ring. The size of pipes for which they
are to be used the manufacturer’s name or trademark and the month and the year of manufacture.
The rings shall comply with IS 5382 regarding their material finish tolerance in dimension and physical
The rubber rings shall be such that they shall not show any signs of deterioration for any reason during the
contract period plus the defects liability period, Entire expenses associatedwith correctingdefects inthisregard
includingreplacementof rubberringsshallbefullyborneby the contractor.
In jointing cast iron spigot and socket pipes and fitting with tycoon flexible joints the contractor shall take
into account the manufacturer’s recommendations as to the methods and equipment to be used in assembling the
joints. In particular the contractor shall ensure that the
spigotendofthepipetobejointedissmoothandhasbeenproperlychamferedthattherubber
ring as per IS 5382 is correctly positioned in the socket and that the two pipes are accurately in line,beforethe joint
ismade.Therubber ringsand any recommendedlubricant shallbe obtained only through the pipe supplier or as
directed by the Engineer.
LEADCALCULATINGJOINTS
The jointing shall be done with molten lead and spun yam. Pin lead shall be of uniform quality clean and free
from foreign materials. It shall be of uniform softness capable of being easily caulked or driven. It shall conform to IS:
782 Spun yarn shall be of clean hemp and of good quality. It shall conform to IS: 6587 Its quantity shall be as follows.
QuantitiesofspunYarnforDifferentSizesofPipes
(Materialsforsinglecollarjoints)
NominalInternal SpunYarnMass
Note: Under special circumstances the Engineer-in-charge may decide the quantities of spun yarn
depending upon the site conditions. The quantity of different diameters of C.L. pipes and fittings shall
SABARMATIWARD - 31-
QUANTITIESOFLEADYARNFORDIFFERENTSIZESOFPIPES
NormalSize Lead/Joint Depthof
Note: The quantities of lead given are provisional and a variation of 20 percent is permissible either way.
Lead shall be heated in a melting pot kept in easy reach of the joint to be poured so that the molten metal
will not be chilled inbeing carried from the melting potto the joint and shallbe brought to a proper temperature so
that when stirred it will show a rapid change of color. Before pouring all scum shall be removed. Each joint shall be
one continuous pour filling of the entire joint space with solid lead. Spongy or imperfectly filled joints shall
be bunt out and repaired.
The joint runner shall fit snugly against the face of the socket and the outside of the pipe shall be dammed
with clay to from a pouring lip to provide for filling the joint flush with the face and to the top of the socket.
SABARMATIWARD - 32-
The jointed is done by first caulking in spun yam, then filling the remainder of the joint space by running in
molten lead, taking care that no dross enters the joint and then thoroughly caulking the lead. The spun yam shall be
used to center the spigot in the socket and to prevent the flow of molten lead into the bore of the pipe.
Afterthe lead hasbeen run into the joint the lead shall be thoroughly caulked. Caulking of joints shall be
done after a convenient length of the pipes has been laid and leaded. The leading ring shallfirst be removed and any
lead outsidethe socket shallbe removed with aflat chiseland then joint caulked removed with a flat chisel and then
the joint caulked around three times with caulking tools of increasing thickness and hammer of 2 kg. Weight Lead
run joints shall be preferably finished 3 mm behind the socket face. The joints shall not be covered till the pipe line
has been tested under specified hydrostatic test pressure, though the rest of the pipe line should be covered up to
prevent expansion and contraction due to variation in temperature.
Fillingavailableexcavatedearth(excludingrock)intrenchesplinthsidesoffoundationetc. in layers not exceeding
20 cams.In depth consolidating each deposited layer by ramming and watering.
The refillingwill generallyreferto refillingofpipelinetrenches,foundation trenchesupto plinth level or ground
level with excavated stuff selected soil brought from outside.
ClearingorTrenchesorGround:
The excavated trenches for foundation or ground over which filling is to be done shall be cleared off all grass
loose stones rubbish of all kinds brick bats as well as tress roots etc.
Theyshallbewellwateredbeforestuffislaid.
I HAVE ALSO GONE THROUGH TECHNICAL SPECIFICATIONS FOR THE ITEMS (AS PER STANDARD P.W.D. TECHNICAL
SPECIFICATION FOR THE ITEMS AND ALSO I HAVE THE BOOK OF THE SAME) AND AGREE TO ABIDE BY THEM.
IN CASE OF WHERE IS NO TECHNICAL SPECIFICATION FOR THE ANY ITEMS AVAILABLE, SPECIFICATION GIVEN BY THE
ENGINEER-IN-CHARGE SHALL BE FOLLOWED AND FOR THE SAME I AGREE TO ABIDE BY THEM.
SealandSignatureoftheBidder Add.CityEngineer(WestZone)
AmdavadMunicipalCorporation
SABARMATIWARD - 33-
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
bntldh muJtmœl – œrûtK vrùbÍtul
vrùb Ítul Ítulj ytuVem,
1. Wvhtuf< xuLzhtu su <u Jdobtk btLg hSMx[uNl ^htJ<t ftuLx[tfxh©eytuyu ChJt.
2. xuLzhle rlg< xuLzh Ve <&t R.yub.ze. ck^ fJhbtkk Wvh lt mhltbu ÁcÁ / hSMxh yu.ze./ MvezvtuMx/ fwhegh&e rlg< mbgbtk btufjJtlt hnuNu.
3. ftuLx[tfxh©eytuyu xuLzhle mt&u BGþrlrmvj btLg hSMx[uNlle/ dJobuLx hSMx[uNlle ftuve, (xuLzh ftuve <&t yLg vwhtJt mt&u) yawf mtbuj
fhJtle hnuNu ylu fJh Wvh xuLzh lkch <&t ftuLxufx lkch sYh MvÐ œNtoJJtltu hnuNu.ck^ fhJh Wvh xuLzh ltuxem lkch, xuLzh lkch, ftblwk ltb
<&t, ftuLx[[tfxhle mkM&tlwk ltb <&t ftuLxufx lkch yJ~g œNtoJJtlt hnuNu. ftuLx[tfxhtuyu xuuLzhbt cukfl wltb, Ft<t lkch, btRfh lkch ylu
mhltb wMvÐ yûthtubtk jFJw.
4. xuLzh Ve vu ytuzoh / zebtLz z[tVx&e aqfJJtlehnuNu. œhuf xuLzh œeX yjd xuLzh xuLzhVe ChJtle hnuNu.
5. ytuAe hfble xuLzh Ve, R.yub.ze. fu xuLzh Ve, R.yub.ze. ÂJltlt xuLzhtu hœct<j (fuLmj) dKtNu.
6. xuLzh mt&u BþfJtbtk ytJ<e yluoMxble, xuLzhle hfblt 1% «btKu cukf duhLxe / zebtLz z[tVx / vu ytuzoh / jtufj btRfh auf&e s MJefthJtbtk
ytJNu. œhuf xuLzh œeX yjd R.yub.ze. ChJtle hnuNu. R.yub.ze. hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu jtufj btRfh auf,
rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu R.yub.ze.le hfb btºt rzbtLz z[tVx, vu
ytuzoh fu ckuf duhkxelt MJYvbtk ytvJtle hnuNu.
7. cukf duhuLxe btºt ybœtJtœ Nnuhle s MJefthJtbtk ytJNu.
8. xuLzh Ve <&t R.yub.ze.le hfblt ze.ze./ aufle vtA¤ ftuLx[tfxh©eyu vtu<tle mkM&tlwk ltb <&t btuctRj lkch yJ~g jFJtltu hnuNu. ftuLx[t¾xhu
vtu<tle mkkM&tlt auf <&t ze.ze. xuLzh R~gw > <theF ctœlt s ytvJt.
9. Nh<e xuLzhtu hœ ct<j dKtNu.
10. stu xuLzhbtk MvÐ WÕjuF fhtguj ntug <tu atubtmtlu fthKu Ft<tfeg MËalt yLJgu ßgthu ßgthu ftb ck^ htFJtLþk &tg <u mbglu ftble BþÆ<btk bshu
ytvJtbtk ytJNu. vhkðþ yt yLJgu ftuE CtJ J^thtu ytvJtbtk ytJNu lne. sule ltuk^ >huf xuLzhh ujuJe.
11. xuuLzhtu ftuEvK fthK ytÃgt rmJtg MJefthJt fu lrnk MJefthJt <ule mkÃËKo m•tt BGþrlrmvj frbNlh©ele hnuNu.
12. xuLzhbtk stu ftuR mwDtht JDtht ntug <tu <u ykd xuLzh Ch<t vnujt AuÕju œJmu rlg< JucmtRx y&Jt fauheyu sYhe <vtm fhelu s xuLzh btufjJw.
13. mefgtuhexe zevtuÍex/ vVtuboLm duhuLxele hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu jtufj btRfh auf, rzbtLz z[tVx, vu ytuzoh fu cukf
duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu mefgtuhexe zevtuÍex/ vhVtuboLm duhkxele hfb btºt rzbtLz z[tVx, vu ytu zoh
fu ckufduhkxelt MJYvbtk ytvJtle hnuNu.
14. ytuljtRl yul-«tufgwh JucmtRx vh&e ChJtlt &<t xuLzhbtk ftuLx[tfxh/ yusLmeyu xuLzhle ntzo ftuvebtk CtJ Cgto Jdhle mne mefft fhe
mcbex fhJtle hnuNu. stu <ubtk CtJ Chuj nNu <tu <uJt xuLzh hœ fhJtbtk ytJNu.
15. dwsht< mhfth ©b,ftuiNÕg ylu htusdth rJCtd îtht XhtJ ¢btf:LED/WRT/e-file/11/2024/0293/M2 mraJtjg ,dtk^eldh
<t.15.02.24 lt XhtJ v{btKu yusLme/¢tuLx[fxhtulu îtht ©bgtude ftgœtle studJtR vhevqKo &tg <u mwrlµ< fhJtlwk hnNu.
16. mœh xuLzhbtk ” GST rl<e rlgb bwsc jtdw vzNu ” <u bwsc dK<he fhe xuLzhtu ChJtlt hnuNu.
zebtLz z[tVx / auf “BgwÂlÂmvj fÂb§h©e, ybœtJtœ” lt ltbltu fZtJJtu.
SABARMATIWARD - 34-
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
yu.yth.me. xuLzh- Nh<tu
1. yu.yth.me. xuLzhbtk Jfoytuzh ytÃgt ctœ ftb NY fhJtle mbgbgtoœtbtk ftuLx[tfxh îtht ftb NY fhJtle òK fgto ctœ
24 fjtflt ftb NY lrn fhJtbtk ytJu <tu yLg ftuLx[tfxh vtmu btfuox hux&e ftuLx[tfxhlt Faou ylu stuFbu ftbdehe
fhtJJtbtk ytJNu.
2. ftuLx[tfxhlu Jfoytuzoh ytÃgt ctœ yu.yth.me. «fthlkw xuLzh ntuR ftble sYhegt< bwsc xujeVtulef òK fhe su <u ftb NY
fhJt fnuJtbtk ytJNu ylu su ftble òK fgtolt 24 fjtfbtk NY fhJtbtk lrn ytJu ylu rlg< mbgbgtoœtbtk vwKo fhJtbtk
lrn ytJu <tu su <u ytRxblt SOR CtJ&e 1.5 dKe vulÕxe Jmwj juJtbtk ytJNu.
3. ºtK fu J^w Jth Wvh bwscle yLg ftuLx[tfxh vtmu&e ftbdehe fhtJJtle Vhs vzNu ylu/y&Jt ºtK fu J^w Jth vulÕxe
fhJtle Vhs vzNu <tu <u mkstudtubtk ftuLx[tfxhlu çjufjeMx fhJtbtk ytJNu sule ykr<b m•tt Bgw.frb¹lh©elu hnuNu.
SABARMATIWARD - 35-
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
Clause : 1 Contractor shall not employ any child having age 5 to 15 years as it is prohibited by Child Labour Prohibition and Regulation
Act 1986. Hon'ble Supreme Court has given certain guide lines and as per the guide lines. If child labour is employed on the site work,
the contractor shall have to deposit Rs. 20,000.00 (Rupees Tw enty thousand only) in the child labour welfare fund. If the employer
refuses to deposit then action will be taken for contempt of Supreme Court Judgement and also will be prosecuted by concerned
authority. Because of the breach of any provision of child labour prohibition and regulation Act 1986 by the Contractor & Municipal
Corporation becomes liable to pay any amount then the Municipal Corporation shall recover the said amount from the contractor.
Clause : 2 The Standing Committee has decided to deduct 1/2% amount from each running bill as per its Reso. No. 1783 Date 06--02-
97, but the Municipal Corporation Board has recently decided that the actual testing charge is taken and the remaining amount is
refundable at the time of final bill (As per Muni. Board Reso. No. 123 dated 25-02-97)
Clause : 3 Contractor has to follow prevailing Labour act and has to maintain labour register acordingly,and has to follow other
Clause : 4 Quantity taken in tender are tentative and may differ as per execution of work. No claim shall be entertain regarding
* MODIFICATION OF DOCUMENTS
Modification of specifications and correction/corrigendum in respect of the work if required will be made by A.M.C. The same shall
be placed on A.M.C website which may be downloaded by the tendrers enclosed along with the tender duly signed. These shall form
a part of tender. The tenderer shall not add or amend the text of any of the documents except in so far as may be necessary to
comply with any addendum.
* ADDENDAUM/CORRIGENDUM .
Addendum or corrigendum conveying any change or correction in respect of the work shall form the part of the contract documents.
The full consideration shall be given to such addendum or corrigendum or correction before submission tender duly filled in by the
contractor. Therefore, the contractor shall have to watch such addendum or corrigendum or correction published by A.M.C through
its website www.egovamc.com. Tenderes shall verify the number of addendum issued and enclose the same with the tender
documents,failing which the tender shall be liable for rejection and no any complaint in respect to this shall be entertained under any
Clause : 5 Schedule Of Maintanance
Contractor Should have to manage following condition for maintanance of water pipe line work as per Engineer
Sr.no. Mode Of Complaint Required machinory / Labour Remarks
Either Whatsup or Email Required as per site Condition or
3 Engineer Instruction
Complaint Received by higher
Authority / Councilor/ by Public
SABARMATIWARD - 36-
If Contractor Not Follow Schedule Of Maintanance
1. Whenever a work is allotted by Engineering staff, whether minor or major of part thereof of any amount, the
contractor shall be bound to start the works within 48 hours of intimation of work. Communication done
telephonically via SMS ,ViaWhatsapp and through letter /E-mail shall be considered legal and binding for the
2. Failure of comply to start the works in 48 hours of intimation as above by contractor the contractor shall be levied
penalty of (1) Rs.1000/-per day (for tenders amounting upto 10 Lakhs), (2) Rs.2500 per day (for tenders amounting
above 10 Lakhs and upto 30Lakhs), (3) Rs.5000 per day (for all tenders amounting above 30Lakhs).
3. Three times failures by contractor shall make contractor responsible to be blacklisted unless and otherwise justified
properly in writing/binding within 15days of last notice of penalty.
4. The Contractor shall adhere to the maintenance schedule outlined in the tender documents and comply with
the prevailing AMC circulars issued from time to time.
Contractor's Sign Addl.C.E.(westzone)
SABARMATIWARD - 37-
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 68.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .