| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.5 CrAccepted-AOC | ₹25.5 Cr | L1 | Accepted-AOC Awarded |
| 2 | L2₹26.7 CrRejected-Finance 1 KHARASIMALU BISWANATH CHARIALI BISWANATH SONITPUR ASSAM 784176 UDYAM AS 28 0000178 | BISWANATH | ASSAM | 784176 | ₹26.7 Cr | L2 | Rejected-Finance Rejected |
| 3 | L3₹28.1 CrRejected-Finance | ₹28.1 Cr | L3 | Rejected-Finance Rejected |
| 4 | Rejected-Technical | - | - | Rejected-Technical Rejected |
| 5 | Rejected-Technical | - | - | Rejected-Technical Rejected |
Tender Value
₹21.5 Cr
EMD Value
₹14.0 L
Closing Date
20 Apr 2023, 12:00 pmClosed
Chief Engineer Project Vartak
HQ CE(P) Vartak, Tezpur, Sonitpur, Assam
PROVIDING AND LAYING OF WBM 100 MM , WBM-75 MM IN TWO LAYERS, LAYING OF (ILCB) 80MM THICK M-50, LAYING OF SAND BLANKET 30 MM THICK FOR CONC PAVEMENT WORKS ON RD ASSAM HILL - LGG FROM KM 0.00 TO KM 10.700 UNDER 763 BRTF, VARTAK IN ARUNACHAL PRADESH
2023_BRO_587832_1
CE/VTK/NIT/37 of 2022-23
Open Tender
Civil Works
270 days
Between km 0.000 to 10.700 on Assam Hill Road
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹14.0 L
Yes
HQ CE(P) Vartak, Tezpur, Sonitpur, Assam
10 Jul 2023
31 Mar 2023
21 Apr 2023
31 Mar 2023
20 Apr 2023
31 Mar 2023
31 Mar 2023 - 6 Apr 2023
7 Apr 2023
Execution Contract forPROVIDING AND LAYING OF WBM 100 MM , WBM-75 MM IN TWO LAYERS, LAYING OF INTER LINK CONCRETE BLOCKS (ILCB) 80MM THICK WITH STRENGTH OF M-50 CONCRETE, LAYING OF SAND BLANKET 30 MM THICK, LAYING OF PCC EDGE BLOCK 1:2:4 (80MM X 100MM), CENTERING/SHUTTERING (STEEL) INCLUDING STRUTTING, PROPPING AND REMOVAL OF FORMWORK (CONSIDERING 10 TIMES TO BE USED) AND FILLING OF JOINTS BY SAND PASSING 2.36 MM SIEVE BETWEEN ILC BLOCKS FOR CONC PAVEMENT WORKS ON ROAD ASSAM HILL - LGG FROM KM 0.00 TO KM 10.700 UNDER 763 BRTF, PROJECT VARTAK IN ARUNACHAL PRADESH
WBM 100 mm consolidated thickness of aggregate 45 mm, grading No.1 as per Table-400-9 and satisfying the physical requirement as per Table-400-8 of MORT&H specifications, spread, rolled, hollow s made up to form true surface , blind and compacted to gradient and camber required all as specified
WBM 75mm consolidated thickness of aggregate 45 mm, grading No.1 as per Table-400-9 and satisfying the physical requirement as per Table-400-8 of MORT&H specifications, spread, rolled, hollow s made up to form true surface , blind and compacted to gradient and camber required all as specified (in two layers)
WBM 75 mm consolidated thickness of aggregate 45 mm, grading No.1 as per Table-400-9 and satisfying the physical requirement as per Table-400-8 of MORT&H specifications, spread, rolled, hollow s made up to form true surface , blind and compacted to gradient and camber required all as specified (in two layers)
PROVIDING AND LAYING OF SAND BLANKETING THICKNESS 30 MM (COMPACTED ) SPREADINGWATERING CONSOLIDATED WITH POWER ROLLER ALL COMPLETE ALL AS SPECIFIED AND AS PER IRC SP:63-2018
Plain Cement concrete M-30 nearly corresponding to nominal mix, cement: sand: stone aggregate of size 20 mm graded downward (excluding the cost of centering/shuttering)
CENTERING /SHUTTERING (STEEL) INCLUDING STRUTTING PROPPING AND REMOVAL OF FORM WORK CONSIDERING 10 TIMES TO BE USED ALL AS SPECIFIED
SUPPLY AND STACKING OF INTER-LINKED CONCRETE BLOCKS (ILCB) OF SIZE 225 MM X 112 MM X 80 MM (M-50 GRADE) ALL AS SPECIFIED AND AS PER IRC SP:63-2018
LAYING OF INTER-LINKED CONCRETE BLOCKS (ILCB) OF SIZE 225 MM X 112 MM X 80 MM (M-50 GRADE) ALL AS SPECIFIED AND AS PER IRC SP:63-2018
FILLING OF JOINTS BY SAND PASSING 2.36 MM SIEVE BETWEEN ILC BLOCKS
M/s Shivam Pavers and concretes
SRI GIRIN CHUTIA
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid