| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.7 LAccepted-Finance B 3 KRISHNA PARK SOCIETY SAI CHOKDI MANJALPUR VADODARA 390011 | VADODARA | GUJARAT | 390011 | ₹15.7 L | L1 | Accepted-Finance Quoted lowest amount. |
| 2 | L2₹15.9 L+₹20,929.10 (1.33%)Rejected-Finance | ₹15.9 L+₹20,929.10 (1.33%) | L2 | Rejected-Finance Quoted higher amount than L1. |
| 3 | L3₹16.6 L+₹92,529.47 (5.89%)Rejected-Finance | ₹16.6 L+₹92,529.47 (5.89%) | L3 | Rejected-Finance Quoted higher amount than L1. |
| Sl No | Description | Qty | Unit | OM SAI INFRASTRUCTURE L1 | ABHUJI PANAJI VANZARA L2 | RAJIVBHAI DHANSUKHBHAI SOMPURA L3 |
|---|---|---|---|---|---|---|
| 1.00Execution of work under following items | ||||||
| 1.01 | Towards Applying priming coat: With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works (Including all the materials & labour charges etc. complete as direction by site in charge) | 269.2 | Sq.mt. | 50 ₹13,460 Lowest | 74 ₹19,920.8 | 76 ₹20,459.2 |
| 1.02 | Towards painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade: Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture. (Including all the materials & labour charges etc. complete as direction by site in charge) | 737.2 | Sq.mt. | 245 ₹1,80,614 Lowest | 247 ₹1,82,088.4 | 258 ₹1,90,197.6 |
| 1.03 | Towards Carefully dismantling and removing existing wooden railing prior to VIP visit, including safely carrying and storing off-site, carrying out necessary repairs, touch-ups, and refixing/reinstalling the same in original position after the visit, complete in all respects as per directions of the Engineer-in-Charge. (Including all the materials & labour charges etc. complete as direction by site in charge) | 390 | RMT | 250 ₹97,500 Lowest | 473 ₹1,84,470 | 493 ₹1,92,270 |
| 1.04 | Towards dismantling old plaster or skirting raking out joints and cleaning the surface for plaster disposal of rubbish to the dumping ground within 50 metres lead. (Including all the materials & labour charges etc. complete as direction by site in charge) | 105.56 | Sq.mt. | 55 ₹5,805.8 Lowest | 60 ₹6,333.6 | 62 ₹6,544.72 |
| 1.05 | Towards CEMENT PLASTER (IN COARSE SAND) 20 mm cement plaster of mix: 1:6 (1 cement: 6 coarse sand). (Including all the materials & labour charges etc. complete as direction by site in charge) | 155.56 | Sq.mt. | 500 ₹77,780 Lowest | 509 ₹79,180.04 | 532 ₹82,757.92 |
| 1.06 | Towards finishing walls with Acrylic Smooth exterior paint of required shade: New work (two or more coat applied @ 1.67 ltr/10sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm) (Including all the materials & labour charges etc. complete as direction by site in charge) | 289.84 | Sq.mt. | 175 ₹50,722 Lowest | 176 ₹51,011.84 | 183 ₹53,040.72 |
| 1.07 | Towards Carefully removing of brick work manually means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) | 6.31 | Cu.mt. | 600 ₹3,786 Lowest | 696 ₹4,391.76 | 727 ₹4,587.37 |
| 1.08 | Towards the Brick work with common burnt clay F.P.S. (non-modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in Cement mortar 1:4 (1 cement: 4 coarse sand). (Including all the materials & labour charges etc. complete as direction by site in charge) | 6.31 | Cu.mt. | 8,000 ₹50,480 Lowest | 10,200 ₹64,362 | 10,670 ₹67,327.7 |
| 1.09 | Towards the stone work in plain ashlar in super structure up to floor five level in cement mortar 1:6 (1 cement: 6 coarse sand) including pointing with cement mortar 1:2 (1 white cement: 2 stone dust) with an admixture of pigment matching the stone shade. (Including all the materials & labour charges etc. complete as direction by site in charge) | 3.38 | Cu.mt. | 80,000 ₹2,70,400 | 74,550 ₹2,51,979 Lowest | 77,983 ₹2,63,582.54 |
Tender Value
₹15.3 L
EMD Value
₹38,173
Closing Date
14 Sept 2026, 9:30 amClosed
Superintending Archaeologist
Superintending Archaeologist, Archaeological Survey of India, Vadodara Circle, Vadodara
Towards painting with synthetic enamel paint of approved brand, Carefully dismantling and removing existing wooden railing prior to VIP visit, dismantling old plaster, finishing walls with Acrylic Smooth exterior paint, etc. as mentioned in BoQ.
2026_ASI_925282_1
97/UD/PM/STM/2026-27-C-2619
Open Tender
Civil Works
Works
7 days
Sun Temple, Modhera
Please refer tender documents
8 documents required · 8 mandatory
₹0
₹38,173
Yes
15 Sept 2026
8 Sept 2026
15 Sept 2026
8 Sept 2026
14 Sept 2026
8 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Execution of work under following items | |||||
| 1.01 | Towards Applying priming coat: With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works (Including all the materials & labour charges etc. complete as direction by site in charge) | 269.2 | Sq.mt. | 70.61 | ₹19,008.21 |
| 1.02 | Towards painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade: Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture. (Including all the materials & labour charges etc. complete as direction by site in charge) | 737.2 | Sq.mt. | 237.02 | ₹1,74,731.14 |
| 1.03 | Towards Carefully dismantling and removing existing wooden railing prior to VIP visit, including safely carrying and storing off-site, carrying out necessary repairs, touch-ups, and refixing/reinstalling the same in original position after the visit, complete in all respects as per directions of the Engineer-in-Charge. (Including all the materials & labour charges etc. complete as direction by site in charge) | 390 | RMT | 453.2 | ₹1,76,748 |
| 1.04 | Towards dismantling old plaster or skirting raking out joints and cleaning the surface for plaster disposal of rubbish to the dumping ground within 50 metres lead. (Including all the materials & labour charges etc. complete as direction by site in charge) | 105.56 | Sq.mt. | 57.25 | ₹6,043.31 |
| 1.05 | Towards CEMENT PLASTER (IN COARSE SAND) 20 mm cement plaster of mix: 1:6 (1 cement: 6 coarse sand). (Including all the materials & labour charges etc. complete as direction by site in charge) | 155.56 | Sq.mt. | 488.23 | ₹75,949.06 |
| 1.06 | Towards finishing walls with Acrylic Smooth exterior paint of required shade: New work (two or more coat applied @ 1.67 ltr/10sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm) (Including all the materials & labour charges etc. complete as direction by site in charge) | 289.84 | Sq.mt. | 168.24 | ₹48,762.68 |
| 1.07 | Towards Carefully removing of brick work manually means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) | 6.31 | Cu.mt. | 667.42 | ₹4,211.42 |
| 1.08 | Towards the Brick work with common burnt clay F.P.S. (non-modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in Cement mortar 1:4 (1 cement: 4 coarse sand). (Including all the materials & labour charges etc. complete as direction by site in charge) | 6.31 | Cu.mt. | 9,789.14 | ₹61,769.47 |
| 1.09 | Towards the stone work in plain ashlar in super structure up to floor five level in cement mortar 1:6 (1 cement: 6 coarse sand) including pointing with cement mortar 1:2 (1 white cement: 2 stone dust) with an admixture of pigment matching the stone shade. (Including all the materials & labour charges etc. complete as direction by site in charge) | 3.38 | Cu.mt. | 71,544.79 | ₹2,41,821.39 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.25 MB
sun.pdf
Tender Documents • 3.23 MB
BOQ_972335.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .