Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC ACHANAMBALAM KANNAMANGALAM PO 676304 | MALAPPURAM | KERALA | 676304 | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.1 L+₹32,326.97 (18.6%)Rejected-AOC BENGLAVIL HOUSE KOORIYAD MALAPPURAM DIST KERALA PIN 676306 | MALAPPURAM | KERALA | 676306 | L2 | Rejected-AOC L2 |
Tender Value
₹2.5 L
EMD Value
₹6,287
Closing Date
6 Oct 2022, 6:00 pmClosed
Assistant Executive Engineer
O/O the Asst.Executive Engineer, Minor Irrigation Sub division, Parappanangadi
GENERAL ANNUAL MAINTENANCE Annual maintenance of L I Scheme Thekkepadam in Vallikkunnu LAC in Malappuram District for the year 2022 23 General Civil Work
2022_Irrig_510972_1
IRR/IA/TR/2720/2022_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
90 days
LIS Thekkepadam in Moonniyur Pt.
Please refer Tender documents.
10 documents required · 10 mandatory
₹555
Yes
₹6,287
Yes
15 Dec 2022
27 Sept 2022
11 Oct 2022
27 Sept 2022
6 Oct 2022
27 Sept 2022
Amount
Maintenance Work
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
Mohamed Fazal
Bidder Name
Mohamed Fazal
P. KOYAKUTTY
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_731958.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .