Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | I₹13.8 LAccepted-AOC | I | Accepted-AOC accepted | |
| 2 | II₹16.3 LRejected-AOC | II | Rejected-AOC rejected | |
| 3 | III₹26.8 LRejected-AOC | III | Rejected-AOC rejected | |
| 4 | IV₹28.6 LRejected-AOC | IV | Rejected-AOC rejected | |
| 5 | V₹29.5 LRejected-AOC | V | Rejected-AOC rejected |
Tender Value
₹19.2 L
EMD Value
₹36,240
Closing Date
23 Dec 2019, 11:00 amClosed
Executive Engineer
IPH Division Dharampur Bharari
Preparation of detailed project report including field survey, related studies, estimation, detailed structural design including detailed drawings of all components and getting the same approved from competent authority of the department
2019_HPIPH_33235_1
11086-11136 dated 09.12.2019
Open Tender
Consultancy
Lump-sum
60 days
Sandhole
Please refer Tender documents.
8 documents required · 8 mandatory
₹400
EE Dharampur Bharari
₹36,240
Yes
9 Jan 2020
9 Dec 2019
23 Dec 2019
9 Dec 2019
23 Dec 2019
9 Dec 2019
Amount
Carrying of reconnaissance & topographical survey for preparation of DPR, cost estimation, hydraulic design, sizing of units of STP component layout plan on the site contour and design of sewage network system as per CPHEEO manual and latest ammendments. Latest software may be used for design root zone treatment of effluent may also be proposed.
C AND E CONSULTANCY
Dogra Construction Company Pvt Ltd
CivilMantra Infracon Pvt. Ltd
G-Eng Advisory Services Pvt Ltd
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .