Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹66.7 LAccepted-AOC | 1 | Accepted-AOC ACCEPTED | |
| 2 | 2₹71.1 L+₹4.4 L (6.58%)Rejected-AOC | 2 | Rejected-AOC ACCEPTED | |
| 3 | 3₹73.8 L+₹7.1 L (10.7%)Rejected-AOC SAJI SEBASTIAN PO 670571 | KANNUR | KERALA | 670571 | 3 | Rejected-AOC ACCEPTED | |
| 4 | Rejected-Technical | - | Rejected-Technical Rejected |
Tender Value
₹83.1 L
EMD Value
₹50,000
Closing Date
16 Oct 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
O/O the Executive Engineer,PWD Roads Division,Kannur
One year running contract for various PWD Roads under Road section Madai
2023_PWD_610898_1
PWD/RB/TR/11879/2023_5_1_1/1
Open Tender
Civil Works - Roads
Item Rate
365 days
Various PWD Roads under Road section Madai
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹50,000
Yes
8 Dec 2023
9 Oct 2023
19 Oct 2023
9 Oct 2023
16 Oct 2023
9 Oct 2023
Amount
Appendix-A Reactive Maintenance (Initial Rectification Work)
55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface.
3.15:Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means <br>
4.2.A.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-III -For lower sub-base - Mix in Place Method
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD66546/2023-2024:MIx seal Surfacing Providing, laying and rolling of close graded premixed surfacing material of 20mm thickness composed of 11.2mm to .9mm(Type A) or 13.2mm to.9mm(Type B)aggregates using Bitumen VG-30to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a static roller 8-10 KN and finishing to required level and grades as per Technical specification. By Manual means Type A(Bitumen VG-30)
Appendix-B Pre-Monsoon Works
10.11:Removal of earth from the choked hill side drain and disposing it on the valley side manually
OD66539/2023-2024:Lifting and replacing of RCC slab from the drain for removing silt/muck causing choking of drain all complete; as per the directions of the engineer-in-charge.
OD66540/2023-2024:Engaging labour for cutting and removing trees/branches, clearing of earth-slips and providing temporary protection work for restoring traffic etc, on various roads as per the directions of the Engineer-in-charge. (Mate)
OD66541/2023-2024:Engaging labour for removing of trees/branches, clearing of earth-slips and providing temporary protection work for restoring traffic etc, on various roads as per the directions of the Engineer-in-charge. (Mazdoor)
OD66542/2023-2024:Engaging Hydraulic Excavator and Loader in order to remove and clear the earth-slip material due to land slippages all complete as per the directions of the engineer-in-charge. All kinds of soil
Appendix-C Proactive/Preventive Maintenance
2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness <br> In area of light jungle - By Mechanical Means<br>
2.3.2.B:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness <br> In area of thorny jungle - By Mechanical Means<br>
10.3:Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor
12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. <br> Ordinary Soil - Depth upto 3m - Mechanical Means <br>
2.4.4.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Rubble stone masonry in cement mortar.
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork)
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
3.11:Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305.
OD66537/2023-2024:Supplying and conveying of ready mixed bituminous compound including engaging of labour and auto-pickups required in order to carry out the laying of the bituminous compound by filling potholes occurred during monsoon times or otherwise, controlling traffic etc. all complete as per the direction of the engineer-in-charge.
OD66538/2023-2024:Conducting and reporting routine inspections for the entire length of the project road at a frequency of 7 days through out the agreement period of the running contract as directed by the departmental officer at site. Additional RI may be required in response to reports or complaints from the police, other authorities and the public as a result of major incidence, typhoon or flooding damages etc., and are not measurable/payable. A propotion of the RI should be carried out either during or immediately following a period of wet weather. (Rate for one day, inspection to be conducted for 52 numbers/1year)
OD141259/2023-2024:Replacing and fixing of non retro-reflectorized Vinyl sign on Existing Display Board for Running contract work with one year warranty (manufactured with vinyl printed sheeting fixed over 3mm thick aluminium composite panal meterial )
Appendix-D Emergency Works
OD66543/2023-2024:Engaging labour for cutting and removing trees/branches, clearing of earth-slips and providing temporary protection work for restoring traffic etc, on various roads as per the directions of the Engineer-in-charge. (Mate)
OD66544/2023-2024:Engaging labour for removing of trees/branches, clearing of earth-slips and providing temporary protection work for restoring traffic etc, on various roads as per the directions of the Engineer-in-charge. (Mazdoor)
OD66545/2023-2024:Engaging Hydraulic Excavator and Loader in order to remove and clear the earth-slip material due to land slippages all complete as per the directions of the engineer-in-charge. All kinds of soil
Arun Raveendhran V K
SAJI SEBASTIAN
P M UNNIKRISHNAN
Bidder Name
SAJI SEBASTIAN
K KRISHNAN
P M UNNIKRISHNAN
Arun Raveendhran V K
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_912961.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .