Loading
Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹28.9 LAdmitted-Finance 24 B SECTOR G GOVINDPURA BHOPAL MADHYA PRADESH 462023 UDYAM MP 10 0007447 | BHOPAL | MADHYA PRADESH | 462023 | ₹28.9 L | Admitted-Finance |
| 2 | ₹29.3 LAdmitted-Finance | ₹29.3 L | Admitted-Finance |
| 3 | ₹37.9 LAdmitted-Finance 102 B F SECTOR INDUSTRIAL AREA GOVINDPURA BHOPAL INDUSTRIAL AREA GOVINDPURA INDUSTRIAL AREA GOVINDPURA BHOPAL BHOPAL MADHYA PRADESH 462023 UDYAM MP 10 0002629 23AAHFV2871R2ZH B R M MII STATUS AS NOT VERIFIED | BHOPAL | MADHYA PRADESH | 462023 | ₹37.9 L | Admitted-Finance |
| 4 | ₹1.3 CrAdmitted-Finance | ₹1.3 Cr | Admitted-Finance |
| Sl No | Description | Qty | Unit | VIKRAM ENGINEERS | MANJEET INDUSTRIES | GUPTA ENGINEERING CORPORATION | Wellbore Engineering Co. |
|---|---|---|---|---|---|---|---|
| 1.00 | MACHINING OF TOP BRACKET ARM ASSY-RATLE 205 MW AS PER
DRAWING 12560124703 REV-01 F/M WT= 3525 KG/UNIT, R/M
WT=3622 KG/UNIT, SCRAP GENERATED = 97 KG/UNIT. MATERIAL
TO BE ISSUED IN FABRICATED ASSY FORM AS PER DRAWING
12560124703 REV-00 | 48 | no | 17,28,000 ₹20.4 L | 16,80,000 ₹19.8 L | 15,84,000 ₹18.7 L | 70,56,000 ₹83.3 L |
| 2.00 | MACHINING OF TOP BRACKET ARM ASSY-RATLE 30 MW AS PER
DRAWING 12560123703 REV-01 R/M WT= 1415 KG/UNIT, F/M
WT=1285 KG/UNIT, SCRAP GENERATED = 130 KG/UNIT. MATERIAL
TO BE ISSUED IN FABRICATED ASSY FORM AS PER DRAWING
12560123703 REV-01 | 8 | no | 4,00,000 ₹4.7 L | 2,24,000 ₹2.6 L | 2,56,000 ₹3.0 L | 10,08,000 ₹11.9 L |
| 3.00 | MACHINING OF TOP BRACKET ARM -CHILLA AS PER DRAWING
22560110702 REV-01 R/M WT= 2742 KG/UNIT, F/M WT=2582 KG/UNIT
SCRAP GENERATED = 160 KG/UNIT. MATERIAL TO BE ISSUED IN
FABRICATED ASSY FORM AS PER DRAWING 22560110702 REV-01 | 18 | no | 10,80,000 ₹12.7 L | 5,76,000 ₹6.8 L | 6,12,000 ₹7.2 L | 28,08,000 ₹33.1 L |
Tender Value
Refer Docs
Closing Date
9 Dec 2025, 6:00 pmClosed
SIMA SINHA (SR MGR)
ROOM NO 4, HRDC GROUND FLOOR
MACHINING OF TOP BRACKET ARM ASSY-RATLE 205 MW
2025_BHEL_55106_1
E2853043
Limited
Miscellaneous Services
42 days
BHEL
2 documents required · 2 mandatory
₹0
Exempted
26 Dec 2025
21 Nov 2025
10 Dec 2025
21 Nov 2025
9 Dec 2025
21 Nov 2025
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid