| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.4 LAccepted-AOC V P O KATAULA TEHSIL SADAR DISTT MANDI 175005 | MANDI | MANDI | HIMACHAL PRADESH | 175005 | ₹14.4 L | L1 | Accepted-AOC As the quoted amount is well within the estimated and justified cost |
| 2 | L2₹16.4 L+₹2.0 L (14.2%)Rejected-Finance H NO 54 8 DARMYANA MUHALLA DISTT MANDI 1750051 | MANDI | MANDI | HIMACHAL PRADESH | 175005 | ₹16.4 L+₹2.0 L (14.2%) | L2 | Rejected-Finance Quoted rates are higher |
| 3 | L3₹20.7 L+₹6.3 L (43.7%)Rejected-Finance | ₹20.7 L+₹6.3 L (43.7%) | L3 | Rejected-Finance Quoted rates are higher |
| 4 | L4₹21.3 L+₹7.0 L (48.4%)Rejected-Finance | ₹21.3 L+₹7.0 L (48.4%) | L4 | Rejected-Finance Quoted rates are higher |
Tender Value
₹16.8 L
EMD Value
₹33,564
Closing Date
6 Dec 2021, 3:00 pmClosed
Superintending Engineer IIT Mandi
O/o Superintending Engineer IIT Mandi Kamand H.P.
P/L of paver blocks and construction of toe wall for Open Car Parking between ST-02 Staff Housing and Campus School and along side of the road between Hockey ground and Community centre at LP-01 North Campus of IIT Mandi.
2021_IITMD_658992_1
IIT Mandi (CW)/SE-1205/2021-22/4240-42 dt 22-11-21
Open Tender
Civil Works
Item Rate
60 days
North campus of IIT Mandi
Please refer to NIT
2 documents required · 2 mandatory
₹1,180
The Registrar IIT Mandi
₹33,564
29 Dec 2021
22 Nov 2021
7 Dec 2021
22 Nov 2021
6 Dec 2021
22 Nov 2021
22 Nov 2021 - 4 Dec 2021
Amount
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in-Charge: All kinds of soil as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts.
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts.
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : "1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 40 mm nominal size) as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts.
Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts.
Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts.
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts.
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts.
Coursed rubble masonry (second sort) with hard stone in foundation & plinth with : Cement mortar 1:6 (1 cement : 6 coarse sand) as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts.
Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) : Raised and cut pointing as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts.
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts.
Providing and laying 60mm thick faciory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved s;ze, design & shape, laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with line sand etc. all complete as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts.
Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge) as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts.
Mansih Kapoor
Anshul Gupta
Chopra Aluminium
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .