Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹75.0 LAccepted-Finance V P O LOTE TEHSIL DISTT LAHAUL DISTT LAHAUL SPITI H P 175133 | LAHUL AND SPITI | HIMACHAL PRADESH | 175133 | ₹75.0 L | L1 | Accepted-Finance L1 |
| 2 | L2₹75.1 L+₹8,640 (0.12%)Accepted-Finance | ₹75.1 L+₹8,640 (0.12%) | L2 | Accepted-Finance L2 |
| 3 | L3₹75.2 L+₹21,960 (0.29%)Accepted-Finance | ₹75.2 L+₹21,960 (0.29%) | L3 | Accepted-Finance L3 |
| Sl No | Description | Qty | Unit | JOGINDER SINGH L1 | RAM GOPAL L3 | Mangni Ram L2 |
|---|---|---|---|---|---|---|
| 1.00Operation, running and maintenance of lift water supply scheme i.e. centrifugal pumps, mono submersible pumps 5HP/10HP and electrical slippring/induction motor 150 HP including replacement/repair of any spare parts, panel boards and rewiring as required for smooth running of the scheme and any other unforeseen items not covered regarding repair, maintenance and operation of the scheme, terms and condition is also appended. The Three nos. skilled labour (two pump operator & one fitter), two nos. semiskilled labour( Asstt. Pump operator) and two Nos. Unskilled labour( watch & ward) for smooth running of the scheme for 16 hours/day . The service provider will also be responsible for payment of statutory liabilities such as EPF, ESI, Sundays and Holidays as notified by the HP Govt. as well as labour law and the same will be deposited / paid to the persons deputed in the University for this job.. Only labour escalation will be applicable as per revision of labour wages by the HP Govt. during the contract period except material/ repair of machinery. In case the scheme remains out of order more than 48 hours, penalty @ 0.5% of the awarded amount will be deducted per day. The whole expenditure on repair of four Nos. mono submersible pumps with allied accessories along with electronic control panel and starter of motors will be borne by the contractor himself .And repair of two Nos. 150 HP pump with motor along with allied accessories, up to Rs. One Lakh per year will be borne by the contractor & above Rs. One lakh expenditure per annum will be borne by the University with the approval of Engineer-in-Charge on the recommendation of the Assistant Engineer (PH). The detailed components of the said scheme are as under :- | ||||||
| 1.10 | a). One pump in operation and one No. standby)
One No. pump in operation
Pump make : Mather and Platt, Model : CI pluro 3”x3” 12 stage
Total head : 346 Mtr. , Discharge : 64 M3/hr.
RPM : 1460
One No. pump Standby
Pump make : KSB , Model : WL-80 7 stage
Total head : 375 Mtr. ,Discharge : 18 LPS
b). Monosub pump 5 HP / 10 HP for lifting raw water from the stream (One No. 5 HP – KSB make, one No. 10 HP- Kirlosker make and Two Nos. 10 HP – KSB make i.e. four Nos.).
c). (One motor in operation and one No. standby)
One no. motor in operation
i) Make : Kirloskar (Induction) in operation
ii) HP : 150 HP
iii) RPM : 2900
Modal : SPDF
One no. motor in standby
i) Make : Crompton Greaves (Slippring)
ii) HP : 150 HP
iii) RPM : 1460 | 36 | months | 2,08,300 ₹74,98,800 Lowest | 2,08,910 ₹75,20,760 | 2,08,540 ₹75,07,440 |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
27 Mar 2026, 10:00 amClosed
Executive Engineer
o/o Estate organization UHF Nauni Solan
Operation running repair and maintence of lift water supply scheme at Khaltoo under at UHF Nauni Solan
2026_YSPU_131776_1
No.UHF/Const-1/Partfile/2025/ 3696dated 16.03.2026
Open Tender
Repair and Maintenance Services
Item Rate
1096 days
Nauni Solan
Please refer Tender documents.
4 documents required · 4 mandatory
₹4,000
EE(D)
₹1.5 L
27 Mar 2026
17 Mar 2026
27 Mar 2026
17 Mar 2026
27 Mar 2026
17 Mar 2026
Operation, running and maintenance of lift water supply scheme i.e. centrifugal pumps, mono submersible pumps 5HP/10HP and electrical slippring/induction motor 150 HP including replacement/repair of any spare parts, panel boards and rewiring as required for smooth running of the scheme and any other unforeseen items not covered regarding repair, maintenance and operation of the scheme, terms and condition is also appended. The Three nos. skilled labour (two pump operator & one fitter), two nos. semiskilled labour( Asstt. Pump operator) and two Nos. Unskilled labour( watch & ward) for smooth running of the scheme for 16 hours/day . The service provider will also be responsible for payment of statutory liabilities such as EPF, ESI, Sundays and Holidays as notified by the HP Govt. as well as labour law and the same will be deposited / paid to the persons deputed in the University for this job.. Only labour escalation will be applicable as per revision of labour wages by the HP Govt. during the contract period except material/ repair of machinery. In case the scheme remains out of order more than 48 hours, penalty @ 0.5% of the awarded amount will be deducted per day. The whole expenditure on repair of four Nos. mono submersible pumps with allied accessories along with electronic control panel and starter of motors will be borne by the contractor himself .And repair of two Nos. 150 HP pump with motor along with allied accessories, up to Rs. One Lakh per year will be borne by the contractor & above Rs. One lakh expenditure per annum will be borne by the University with the approval of Engineer-in-Charge on the recommendation of the Assistant Engineer (PH). The detailed components of the said scheme are as under :-
a). One pump in operation and one No. standby) One No. pump in operation Pump make : Mather and Platt, Model : CI pluro 3”x3” 12 stage Total head : 346 Mtr. , Discharge : 64 M3/hr. RPM : 1460 One No. pump Standby Pump make : KSB , Model : WL-80 7 stage Total head : 375 Mtr. ,Discharge : 18 LPS b). Monosub pump 5 HP / 10 HP for lifting raw water from the stream (One No. 5 HP – KSB make, one No. 10 HP- Kirlosker make and Two Nos. 10 HP – KSB make i.e. four Nos.). c). (One motor in operation and one No. standby) One no. motor in operation i) Make : Kirloskar (Induction) in operation ii) HP : 150 HP iii) RPM : 2900 Modal : SPDF One no. motor in standby i) Make : Crompton Greaves (Slippring) ii) HP : 150 HP iii) RPM : 1460
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.20 MB
tenderdocccc.pdf
Tender Documents • 5.21 MB
termscondition.pdf
Additional Documents • 3.69 MB
BOQ_194873.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .