Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 30B GEETA ENCLAVE KRISHNA NAGAR MATHURA UTTAR PRADESH 281004 | MATHURA | UTTAR PRADESH | 281004 | Admitted-Finance |
| 2 | Admitted-Finance 41 2 2ND FLOOR SANGATHAN SOCIETY OPP SUN RISE PARK DRIVE IN ROAD AHMEDABAD GUJARAT 380052 | AHMEDABAD | AHMADABAD | GUJARAT | 380052 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Rejected-Technical | Rejected-Technical Non Responsive |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
24 Jun 2021, 6:00 pmClosed
Commissioner
Office of Commissioner, Municipal Board, Nathdwara, Sukhadia Nagar, Nathdwara, Rajasthan 313301
1. Consultancy Services and Supervision Work for Interpretation Theme in Tourism Interpretation Center Under Krishna Circuit Scheme, Nathdwara.
2021_DLB_227198_1
NIB No. e-Bid 14/2021-22
Open Tender
Consultancy
Item Rate
60 days
MUNICIPALITY NATHDWARA
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
As Per Mentioned in NIB
₹10,000
Yes
30 Jun 2021
15 Jun 2021
25 Jun 2021
15 Jun 2021
24 Jun 2021
15 Jun 2021
Amount
1. Scope of Work 1) Preparation of Conceptual drawing for Krishna interpretation centre. The theme ideas for visualizing Krishna Leelas. Identification of theme for each room and gallery and prepare theme interior drawing. I) Implements a “bubble diagram,” which accounts for the visualizing Krishna Leelas. Interpretation centre typically have Spiritual themed “zones,” and detail what style of architecture will be utilized in each one as well as the Spiritual attractions that will inhabit them. II) Colours distributed throughout the interpretation centre and Spiritual themed architecture intends to create a fantastical sense of place. Scope of work can be change by Municipal board Nathdwara officers as per site requirement 2) Consultant shall have to prepare his plans, their preliminary drawings and for provisional approval from municipality. After getting provisional approval consultant shall submit their final plan along with 3D modules in three copies at his own cost. Cost estimation to be done by consultant. Consultant shall have to facilitate the engineers to calculate the quantities, their material suggestions, market rate for Non-SoR items. During execution of work all working drawings to be submitted by consultant as per requirement of site. Any delay/hindrance caused due to late supply of working drawings shall be recovered from consultant. 3) Supervision work:- All interior, Spiritual and Interpretation theme related work will be in supervision of consultant. 4) Preparation of Development and Management Plan of interpretation centre. 5) Visit charges: - If municipal engineers need any expert help or have any query related to consultancy, during execution of work than the consultant shall facilitate the same and site visit charges shall be borne by consultant.
Dera Consultants Private Limited
R Tech Infra Associates
THE FORMS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .