Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹5.0 LAccepted-AOC VATTAMTHALA VEEDU THATHIYOOR MANCHAVILAKOM P O | 1st | Accepted-AOC Agreement Executed EMD may be released |
Tender Value
Refer Docs
EMD Value
₹7,600
Closing Date
27 Apr 2022, 3:30 pmClosed
Assistant Executive Enginner
Assistant Executive Enginner NIP Channel dub division Neyyattinkara
MLA SDF Construction of bridge across poovar west branch channel ch 17058m in karumkulan ppt
2022_Irrig_486800_1
49/ET/AEE/CHL/2022-23
Open Tender
Civil Works - Canal
Item Rate
150 days
karumkulam
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,200
Yes
₹7,600
Yes
22 Aug 2022
18 Apr 2022
3 May 2022
18 Apr 2022
27 Apr 2022
19 Apr 2022
Amount
Detailed estimate
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.6 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
4.3.2 : Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
5.9.3 : Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
od33018/2020_2021/IA : Cement plastering 1:3, 9mm (1 cement:3 fine sand) and using 4.3Kg cement/m2 of plastering including cost and conveyance of all materials and labour charges etc. complete as per the dorection of Engineer - in-charge at site.
od35791/2021_2022/IA : Name board of size 75X60 cm installed in the appropriate place visible to the public made of brick work with granite plaque should be inserted and engraving letters etc complete as per the departmental officers at site.
Bidder Name
DHARMARAJAN N
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_699375.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .