| 1 | L1₹8.0 CrAccepted-AOC | ₹8.0 Cr | L1 | Accepted-AOC L1.Hence accepted |
| 2 | L2₹8.2 Cr+₹18.6 L (2.31%)Rejected-AOC | ₹8.2 Cr+₹18.6 L (2.31%) | L2 | Rejected-AOC L2.Hence rejected |
| 3 | L3₹8.3 Cr+₹26.2 L (3.26%)Rejected-AOC | ₹8.3 Cr+₹26.2 L (3.26%) | L3 | Rejected-AOC L3.Hence Rejected |
| 4 | L4₹8.3 Cr+₹30.7 L (3.82%)Rejected-Finance | ₹8.3 Cr+₹30.7 L (3.82%) | L4 | Rejected-Finance L4.Hence rejected |
| 5 | L5₹8.5 Cr+₹44.2 L (5.50%)Rejected-Finance | ₹8.5 Cr+₹44.2 L (5.50%) | L5 | Rejected-Finance L5.Hence rejected |
Tender Value
₹8.9 Cr
EMD Value
₹2 L
Closing Date
25 Aug 2020, 4:00 pmClosed
SE, Judicial Buildings Circle, EKM
Office of the SE, Judicial Buildings Circle, EKM
Six storied R.C.C building
2020_PWD_374819_1
PWD/PQ-2020-2021/9399/Judicial Circle
Open Tender
Civil Works - Buildings
Item Rate
545 days
Chalakkudy
Please refer Tender documents.
8 documents required · 8 mandatory
₹13,010
Yes
online
₹2 L
Yes
25 Feb 2021
4 Aug 2020
3 Sept 2020
12 Aug 2020
25 Aug 2020
12 Aug 2020
12 Aug 2020 - 25 Aug 2020
Amount
1 Appendix A Building
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area clearedClearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
od65770/2019_2020 : Boring, providing and installing bored cast-in-situ reinforced cement concrete piles of grade M-30 of specified diameter and length below the pile cap to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring, with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. all complete, including removal of excavated earth with all lifts and leads (Length of pile for payment shall be measured upto bottom of pile cap).Note:- 1)Excess or less cement used as per design mix is not payable/recoverable separately 2) Minimum cement content considered is 340kg/cum. 600mm dia piles
od65774/2019_2020 : Boring, providing and installing bored cast-in-situ reinforced cement concrete piles of grade M-30 of specified diameter and length below the pile cap to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring, with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. all complete, including removal of excavated earth with all lifts and leads (Length of pile for payment shall be measured upto bottom of pile cap).Note:-1)Excess or less cement used as per design mix is not payable/recoverable seperately 2) Minimum cement content considered is 340kg/cum. 700mm dia piles.
od65734/2019_2020 : Steel reinforcement for bored cast in situ R.C.C piles including straightening, cutting, bending, placing in position and binding all complete including cost of lap welding at three points each of 15cm length for overlaps and spot welding at 2 points at joint of main reinforcement using 8 guage welding rods including all cost of materials, labour charges and hire charges of welding plant etc.complete. Thermo - Mechanically Treated bars of grade Fe-500D or more
od18849/2020_2021 : Vertical load testing of piles in accordance with IS 2911( Part IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of engineer -in-Charge. Single pile above 100 and upto 150 tonne capacity Initial test
od18850/2020_2021 : Vertical load testing of piles in accordance with IS 2911( Part IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of engineer -in-Charge. Single pile above 100 tonne and upto 150 tonne capacity Routine test
15.3 : Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
2.26.1 : Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
od65733/2019_2020 : Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work,using cement content as per approved design mix including pumping of concrete to site of laying but excluding the cost of centering ,shuttering,finishing and reinforcement,including admixtures in recommended proportions as per IS: 9103 to Accelerate,retard setting of concrete, include workablity without impairing strength and durability as per direction of engineer in charge,note:minimum cement content to be adopted is 340kg/cum.There will be no additional payments for the excess cement used as per mix design.All work up to plinth level.
5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.2 : Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.9.6 : Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.9.7 : Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases)
5.9.3 : Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.16.1 : Edges of slabs and breaks in floors and wallsUnder 20 cm wide
5.9.19 : Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges
5.11.1 : Extra additional height in centering, shuttering where ever required with adequate bracing, propping etc. including cost of de-shuttering and decentering at all levels, over a height of 3.5m, for every additional height of 1 metre or part thereof (Plan area to be measured).Suspended floors, roofs, landing, beams and balconies (Plan area to be measured)
2.25 : Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
5.22A.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
od66821/2019_2020 : Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but , excluding the cost of centering, shuttering, finishing and reinforcement ,including cost of admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in -charge. Note:- minimum cement content to be adopted is 340kg/cum. There will be no additional payment for the excess Cement used as per mix design . All work above plinth level.
50.6.2.1 : Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement :6 coarse sand) etc complete
50.6.2.2 : Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete
50.6.2.3 : Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure above floor two level upto floor five level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete
od19340/2020_2021 : Supplying and fixing Neoprene Pad of 300 mm wide and 25mm thick for slip joint as per the specification in the drawing and the direction of Departmental officers etc.complete
22.23.1 : Providing and applying integral crystalline slurry of hydrophilic in nature for waterproofing treatment to the RCC structures like retaining walls of the basement, water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels / subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 parts integral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 parts integral crystalline slurry : 1 part water) for horizontal surfaces and applying the same from negative (internal) side with the help of synthetic fiber brush. The material shall meet the requirements as specified in ACI-212-3R-2010 i.e by reducing permeability of concrete by more than 90% compared with control concrete as per DIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalline slurry shall be capable of self-healing of cracks up to a width of 0.50mm. The work shall be carried out all complete as per specification and the direction of the engineerin- charge. The product performance shall carry guarantee for 10 years against any leakage.For vertical surface two coats @0.70 kg per sqm
22.23.2 : Providing and applying integral crystalline slurry of hydrophilic in nature for waterproofing treatment to the RCC structures like retaining walls of the basement, water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels / subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 parts integral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 parts integral crystalline slurry : 1 part water) for horizontal surfaces and applying the same from negative (internal) side with the help of synthetic fiber brush. The material shall meet the requirements as specified in ACI-212-3R-2010 i.e by reducing permeability of concrete by more than 90% compared with control concrete as per DIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalline slurry shall be capable of self-healing of cracks up to a width of 0.50mm. The work shall be carried out all complete as per specification and the direction of the engineerin- charge. The product performance shall carry guarantee for 10 years against any leakage.For horizontal surface one coat @1.10 kg per sqm.
2 Appendix B Septic Tank
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
2.26.1 : Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.2 : Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
Kuriekal Projects And Contractors PVT Ltd
RFSCO INFRASTRUCTURES PRIVATE LIMITED.
K J Varghese
A.M.MOHAMMED ALI
SyamaDynamic Project Developers Pvt Ltd
Ammuconstructions
SPAN CONSTRUCTIONS
TRANSCONS CORPORATION
GKV ASSOCIATES
PALAL CORPORATION
THERUVATH BUILDERS
Bidder Name
Kuriekal Projects And Contractors PVT Ltd
PALAL CORPORATION
THERUVATH BUILDERS
K J Varghese
Ammuconstructions
A.M.MOHAMMED ALI
SPAN CONSTRUCTIONS
Prathiba Developers (P) Ltd.
TRANSCONS CORPORATION
GKV ASSOCIATES
SyamaDynamic Project Developers Pvt Ltd
RFSCO INFRASTRUCTURES PRIVATE LIMITED.
stage.html
html • 0.09 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .