| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC 37 1A MOMINPORE ROAD KOLKATA 700 023 | KOLKATA | MURSHIDABAD | WEST BENGAL | 700023 | ₹1.0 Cr | L1 | Accepted-AOC The firm is L1. |
| 2 | L2₹1.1 Cr+₹5.7 L (5.69%)Rejected-Finance | ₹1.1 Cr+₹5.7 L (5.69%) | L2 | Rejected-Finance The bidder is L2. |
| 3 | L3₹1.1 Cr+₹10.2 L (10.2%)Rejected-Finance 77 DR ZAKIR HUSAIN WARD NEAR GAZI MASJID NAI BASTI GOHALPUR JABALPUR NAI BASTI GOHALPUR JABALPUR MADHYA PRADESH 482002 | JABALPUR | MADHYA PRADESH | 482002 | ₹1.1 Cr+₹10.2 L (10.2%) | L3 | Rejected-Finance The bidder is L3. |
| 4 | L4₹1.2 Cr+₹17.8 L (17.8%)Rejected-Finance | ₹1.2 Cr+₹17.8 L (17.8%) | L4 | Rejected-Finance The bidder is L4. |
| 5 | Rejected-Technical 11TH FLOOR ECO CENTRE BUSINESS TOWER P NO 4 EM BLOCK SECTOR V KOLKATA 91 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | - | - | Rejected-Technical The firm does not meet the NIT criterion |
Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
31 Aug 2020, 6:00 pmClosed
AGM E-E I
NSCBI Airport, Kolkata
RMO AC Equipment at NSCBI Airport Kolkata dg 2020 23 Sh Annual Maintenance contract of Window ACs, Split ACs, Ductable ACs Slim line ACs, Package AC for 3 years.
2020_AAI_54854_1
AAC/AMC/Windows Split AC/Kol/20-21
Open Tender
Electrical Works
Works
1095 days
NSCBI Airport, Kolkata
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,120
Yes
Airports Authority of India
₹3.0 L
Yes
18 Nov 2020
12 Aug 2020
4 Sept 2020
12 Aug 2020
31 Aug 2020
12 Aug 2020
12 Aug 2020 - 17 Aug 2020
Amount
To carryout Day to day maintenance of Window AC, Split AC, Ductable AC of various capacity 1 Ph/3 Ph including all accessories & attending complaints / faults / breakdown , rectification and ensuring serviceability / satisfactory working condition and maintaining all records as per PMI schedule as per the special conditions of contract , throughout a year in general basis as per the instruction of the Engineer - in - charge or his authorized representative as per the requirement of works at various installations inside/outside operational area.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Annual maintenance of 1.5 TR window type AC units including replacement of capacitors, Relays, Repairing of Compressors, & PCB , Rewinding of Motors & Gas charging etc. as and when required basis including attending breakdown calls complete as required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Annual maintenance of 1.5 TR Split type AC units including replacement of capacitors, Relays, Repairing of Compressors, PCB , Rewinding of Motors & Gas charging etc. as and when required basis including attending breakdown calls complete as required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Annual maintenance of 2 TR Split type AC units including replacement of capacitors, Relays, Repairing of Compressors, PCB , Rewinding of Motors & Gas charging etc. as and when required basis including attending breakdown calls complete as required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Annual maintenance of 2 TR Slim line Split type AC units including replacement of capacitors, Relays, Repairing of Compressors, PCB , Rewinding of Motors & Gas charging etc. as and when required basis including attending breakdown calls complete as required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Annual maintenance of 3 TR Single Split type AC units including replacement of capacitors, Relays, Repairing of Compressors, PCB , Rewinding of Motors & Gas charging etc. as and when required basis including attending breakdown calls complete as required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Annual maintenance of 3 TR Slim line Split type AC units including replacement of capacitors, Relays , 3 Ph Contractors , Repairing of 3 Ph Compressors, PCB , Rewinding of Motors & Gas charging etc. as and when required basis including attending breakdown calls complete as required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Annual maintenance of 4 TR Slim line Split type AC units including replacement of capacitors, Relays , 3 Ph Contractors , Repairing of 3 Ph Compressors, PCB , Rewinding of Motors & Gas charging etc. as and when required basis including attending breakdown calls complete as required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Annual maintenance of 5 TR Ductable Split type AC units including replacement of capacitors, Relays , 3 Ph Contractors , Repairing of 3 Ph Compressors, PCB , Rewinding of Motors & Gas charging etc. as and when required basis including attending breakdown calls complete as required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Annual maintenance of 5.5 TR Ductable Split type AC units including replacement of capacitors, Relays , 3 Ph Contractors , Repairing of 3 Ph Compressors, PCB , Rewinding of Motors & Gas charging etc. as and when required basis including attending breakdown calls complete as required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Annual maintenance of 7.5 TR Ductable Split type AC units including replacement of capacitors, Relays , 3 Ph Contractors , Repairing of 3 Ph Compressors, PCB , Rewinding of Motors & Gas charging etc. as and when required basis including attending breakdown calls complete as required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Annual maintenance of 8.5 TR Ductable Split type AC units including replacement of capacitors, Relays , 3 Ph Contractors , Repairing of 3 Ph Compressors, PCB , Rewinding of Motors & Gas charging etc. as and when required basis including attending breakdown calls complete as required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Annual maintenance of 11 TR Ductable Split type AC units including replacement of capacitors, Relays , 3 Ph Contractors , Repairing of 3 Ph Compressors, PCB , Rewinding of Motors & Gas charging etc. as and when required basis including attending breakdown calls complete as required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
SH-III
Dismantling of 1/1.5/2 TR Window AC from existing location and shifting the same in the store etc. as required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Dismantling of 1/1.5/2 TR Split AC from existing location and shifting the same in the store etc. as required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Dismantling of 3/4 TR Split AC from existing location and shifting the same in the store etc. as required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Dismantling of 5/7.5 TR Split AC from existing location and shifting the same in the store etc. as required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Installation/testing and commissioning of 1.5/2 TR window AC with suitable wooden frame i/c making opening in the wall and making opening good with sand cement plaster etc as required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Installation/testing and commissioning of 1.5/2 TR window AC including gas charging in the existing opening with suitable wooden etc as required.
a) For 1st Year
b) For 2nd Year
C) For 3rd Year
Installation/testing and commissioning of 1/ 1.5/2 TR Split AC i/c dehydration ,leak,testing,pressure testing and gas charging etc as required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Installation/testing and commissioning of 3/ 4 TR Split AC i/c dehydration ,leak,testing,pressure testing and gas charging etc as required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Installation/testing and commissioning of 5/7.5 TR ductable AC i/c dehydration ,leak,testing,pressure testing and gas charging etc as required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Supply and laying of 3x2.5 Sq.mm PVC insulated PVC sheathed unarmoured copper conductor cable on wall surface/recess etc as required and as per direction of Engineer-in-charge.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Supply and fixing of 1 "dia hard PVC pipe for drain line on wall surface/recess etc as required and as per direction of Engineer-in-charge.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Supply and fixing following refrigerant piping with superlon insulation on wall surface /recess etc as required and as per direction of Engineer-in-charge.
3/8" copper pipe with Nitrile Rubber insulation.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
5/8" copper pipe with Nitrile Rubber insulation.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
1/4" copper pipe with Nitrile Rubber insulation.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
1/2" copper pipe with Nitrile Rubber insulation.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Supply of R- 22 Refrigerant.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Supply of 7/8 Copper Pipe for 8.5 Tr.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
SUVIDHA ENGINEERS INDIA PVT LTD
ROSHAN REFRIGERATION AND ELECTRICALS
ABS AIRCON ENGINEERS PRIVATE LIMITED
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .