| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹22.1 LAdmitted-Fee/PreQual/Technical/Finance | -43.22% | ₹22.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹22.5 L+₹37,793.02 (1.71%)Admitted-Fee/PreQual/Technical/Finance | -42.25% | ₹22.5 L+₹37,793.02 (1.71%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹23.8 L+₹1.6 L (7.41%)Admitted-Fee/PreQual/Technical/Finance | -39.01% | ₹23.8 L+₹1.6 L (7.41%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹24.2 L+₹2.0 L (9.23%)Admitted-Fee/PreQual/Technical/Finance | -37.98% | ₹24.2 L+₹2.0 L (9.23%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹25.3 L+₹3.2 L (14.3%)Admitted-Fee/PreQual/Technical/Finance | -35.12% | ₹25.3 L+₹3.2 L (14.3%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹39.0 L
EMD Value
₹77,924
Closing Date
17 Aug 2026, 6:00 pmClosed
Executive Engineer RnB kangan
Executive Engineer RnB kangan
Providing of Installation of CGI fencing 10 feets height with secured main gate at Solid Waste Management Plant Sarbal
2026_PWDJK_320039_1
ENIT 25
Open Tender
Civil Works
Percentage
90 days
Kangan
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,100
executive Engineer RnB kangan
₹77,924
20 Aug 2026
8 Aug 2026
18 Aug 2026
8 Aug 2026
17 Aug 2026
8 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 114.17 | Cum | 256.85 | ₹29,324.56 |
| 2 | Providing and Laying of stone soling (Nallah) Duly hand packed including watering, dressing and ramming with all carriages, loading and unloading upto site of work complete. | 19.03 | Cum | 900 | ₹17,127 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 19.03 | Cum | 5,202.9 | ₹99,011.19 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 197.89 | Cum | 6,591.25 | ₹13,04,342.46 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 649.39 | Sqm | 286.35 | ₹1,85,952.83 |
| 6 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete | 7,448.32 | Kgs | 120.8 | ₹8,99,757.06 |
| 7 | Providing and fixing with Colour coated High rib profile sheet roofing including vertical/curved surface including polymer coated J. or L hooks,fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and G.I limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto any pitch in horizontal/vertical or curved including ridges, hips, valleys complete excluding the cost of purlins, rafters complete as per the directions of Incharge Engineer. 0.50mm thick including carriages by mt | 799.25 | Sqm | 1,350 | ₹10,78,987.5 |
| 8 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 840 | Kgs | 181.6 | ₹1,52,544 |
| 9 | Carriage of materials from approved souce to site of wok complete. | - | - | - | - |
| 10 | Stone Aggregate for an average lead of 25Kms. | 193.05 | Cum | 465.14 | ₹89,795.28 |
stage.html
html • 0.04 MB
finance_1062264.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.06 MB
BOQ_1062264.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .