Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.2 LAccepted-AOC | ₹38.2 L | L1 | Accepted-AOC 1ST LOWEST |
| 2 | L2₹38.4 LRejected-Finance | ₹38.4 L | L2 | Rejected-Finance 2ND LOWEST |
| 3 | L3₹38.6 LRejected-Finance NOAPARA GANGANAGAR KOLKATA 700132 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700132 | ₹38.6 L | L3 | Rejected-Finance 3RD LOWEST |
Tender Value
₹38.8 L
EMD Value
₹77,649
Closing Date
16 Feb 2026, 12:00 pmClosed
EXECUTIVE ENGINEER-II CANALS DIVISION
OFFICE OF THE EE-II CANALS DIVISION_SECH ABASAN SALTLAKE SECTOR-III KOLKATA
Protection to the river side toe of left embankment of the River Hooghly near Lunar Brick Field for a length of 60 M within Block - Budge Budge-II, P.S. Nodakhali, Dist.-South 24 Pgs. during the year 2026-27
2026_IWD_996220_7
WBIW/EE-II/CD /e-NIT-28(e)/2025-26
Open Tender
CIVIL WORKS
45 days
BLOCK-BUDGE BUDGE-II
Please refer Tender documents.
5 documents required · 5 mandatory
₹77,649
Yes
11 May 2026
2 Feb 2026
17 Feb 2026
2 Feb 2026
16 Feb 2026
2 Feb 2026
Labour charges for dumping and placing in position properly filled in Nylon crates with filled in gunny / poly cement bags (minimum 25 nos. having capacity 50 kg) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge. NB:- Volume of each earth/ sand filled bags should not be less than 0.028 m3. Size of Nylon crate is 1metre X 1metre X 1metre. (b) Where boats are necessary.
Supply of different materials as per approved specification. Bricks / Jhama / Bats. Sorted & stacked at site. (f) Brick bats. (The above rates are inclusive of all charges such as Royalty, Supervision Charges, etc. and also include allowance for sinkage, as applicable, and/or shrinkage. Rates for Bats is complete rates at site and no other costs need to be considered.
Supply of different materials as per approved specification. Supply of Silver Sand stacked at site. (The above rates are inclusive of all charges such as Royalty, Supervision Charges, etc. and also include allowance for sinkage, as applicable, and/or shrinkage. Rates for Bats is complete rates at site and no other costs need to be considered.
Supplying Nylon cage netting 1 metre x 1 metre x 1 metre size with knot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250 Kg. / sq. cm. including carriage, delivery and stacking at site inclusive of all taxes complete.
Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg).
Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling willnot beaccepted ) , andstacking withina lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag.
Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts.
Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of E) Beyond 4.00 km and upto 5.00 km, NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking.
Making sausages Square or Rectangular in section (any length) made with 1st class kiln burnt / 1st class picked jhama full bricks rolledinside with 10 S.W.G. galvanised square pattern (internal dimension ofmesh will be 100 m.m. x 100 m.m. square) galvanised wirenet cagingwith proper lapping of minimum 150 m.m, and sewing with 12 S.W.G.galvanised wire including cost of all materials, carriage upto site, placingand laying the same in position, after preparing the bed to properslope etc. complete as per direction of the Engineer-in-charge. (cost isexcluding the cost of end pieces.) b) 0.90 metre x 0.90 metre nominal section,
Supplying, dressing and stacking at site bamboo pins above 5 cm.diameter and upto 7.5 cm. diameter. (Dia. to be measured at mid length)
Driving bamboo pins in standing or flowing water including scaffolding and driving appliances. (a) Where boats are not necessary.
Supplying, fitting and fixing with iron nails half split bamboo wailing pieces (av. dia. of bamboo not less than 5.0 cm.)
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.54 MB
serial7.pdf
Tender Documents • 0.10 MB
2911.pdf
Tender Documents • 0.44 MB
FORMS.pdf
Tender Documents • 0.09 MB
BOQ_2438301.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid