| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC | L1 | Accepted-AOC Lowest rate, hence accepted | |
| 2 | L2₹2.7 L+₹13,323.55 (5.21%)Rejected-AOC | L2 | Rejected-AOC Highest rate hence rejected |
Tender Value
₹2.6 L
EMD Value
₹6,415
Closing Date
24 Apr 2023, 5:00 pmClosed
Seeja KR
O/o Assistant Executive Engineer, Electrical Wing (I) Subdivision Aluva
GENERAL-AMC 2022-23-Fully Comprehensive Annual Maintenance of Neduvanoor,Kuttamassery, Uliyannor LI Schemes under Electrical LI section Aluva- General Electrical Work
2023_Irrig_569863_3
PWD/BLDG/TR/ALY/AMC/2022-23
Open Tender
Electrical Works
Item Rate
365 days
Aluva
Please refer Tender documents.
11 documents required · 11 mandatory
₹570
₹6,415
14 Jun 2023
4 Apr 2023
26 Apr 2023
4 Apr 2023
24 Apr 2023
4 Apr 2023
4 Apr 2023 - 22 Apr 2023
Amount
Overhauling
OD64959/2022-2023:Dismantling the 5 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
OD64960/2022-2023:Dismantling the 50 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
OD65006/2022-2023:Dismantling the 25 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
Lowering / Refitting
OD64941/2022-2023: Lowering down and erecting 5 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD64942/2022-2023:Lowering down and erecting 50 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD65044/2022-2023:Lowering down and erecting 25 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
Accessories Supply and Other Items( SITC Should be completed with in 3 Months after executing the Agreement)
OD64946/2022-2023:Supply and filling of transformer oil of good quality to the Transformer /starter/ regulator etc as required
OD64947/2022-2023: Supply and renewal of the LED Indication lamps in panel board after dismantling the damaged one
OD64948/2022-2023:Supply and Installing 20 W LED Tube light.
OD246841/2022-2023:Replacing the damaged bearing , supply and fixing new ball/Roller bearing , SKF / FAG or equivalent , suitable for motor / pump set as per the direction of departmental staff at site - Bearing No 6316 or its equivalent size
OD246836/2022-2023:Replacing the damaged tube fitting and supply conveyance, installation, testing and commissioning the light fittings of following types made from CRCA sheet 0.5mm thickness with all accessories and lamps directly on wall and giving connections as required 1200 mm 1X20W LED Lamp with box type fixture
Periodical Maintenance
OD64956/2022-2023:Fully Comprehensive Annual Maintenance of 5 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump,maintaince of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding)all time during the period of contract and the faults should be rectified with in the time allowed
OD64958/2022-2023: Fully Comprehensive Annual Maintenance of 50 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter and slip ring unit, replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and starter ( excluding motor rewinding ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD65050/2022-2023:Fully Comprehensive Annual Maintenance of 25 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and starter ( excluding motor rewinding ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
Lifting
OD64939/2022-2023: Lifting the 5 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD64940/2022-2023:Lifting the 50HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD65055/2022-2023:Lifting the 25HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
Overhauling
OD64935/2022-2023:Dismantling the 5 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
OD114829/2022-2023:Dismantling the 45 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
Lowering / Refitting
OD64954/2022-2023: Lowering down and erecting 5 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD114832/2022-2023:Lowering down and erecting 45 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
Accessories Supply and Other Items( SITC Should be completed with in 3 Months after executing the Agreement)
OD64963/2022-2023:Supply and filling of transformer oil of good quality to the Transformer /starter/ regulator etc as required
OD64964/2022-2023: Supply and renewal of the LED Indication lamps in panel board after dismantling the damaged one
OD64965/2022-2023:Supply and Installing 20 W LED Tube light.
Periodical Maintenance
OD64972/2022-2023:Fully Comprehensive Annual Maintenance of 5 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump,maintaince of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding)all time during the period of contract and the faults should be rectified with in the time allowed
OD114833/2022-2023: Fully Comprehensive Annual Maintenance of 45 HP squirrel cage induction motor with split case / End suction pump set, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs,replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and ( excluding motor rewinding ) and maintain the motor pump set, electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
Lifting
OD64950/2022-2023: Lifting the 5 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD114836/2022-2023:Lifting the 45HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
Overhauling
OD64937/2022-2023:Dismantling the 5 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
OD64938/2022-2023:Dismantling the 40 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
Lowering / Refitting
OD64970/2022-2023:Lowering down and erecting 5 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD64971/2022-2023:Lowering down and erecting 40 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
Accessories Supply and Other Items( SITC Should be completed with in 3 Months after executing the Agreement)
OD64975/2022-2023:Supply and filling of transformer oil of good quality to the Transformer /starter/ regulator etc as required
OD64976/2022-2023:Supply and Installing 20 W LED Tube light.
OD137729/2022-2023:Replacing the damaged bearing , supply and fixing new ball/Roller bearing , SKF / FAG or equivalent , suitable for motor / pump set as per the direction of departmental staff at site - Bearing No 6314-2Z or its equivalent size
OD64978/2022-2023:Supply and renewal of the LED Indication lamps in panel board after dismantling the damaged one
Periodical Maintenance
OD64968/2022-2023:Fully Comprehensive Annual Maintenance of 5 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintaince of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding)all time during the period of contract and the faults should be rectified with in the time allowed
OD67710/2022-2023: Fully Comprehensive Annual Maintenance of 40 HP squirrel cage induction motor with split case / End suction pump set, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs,replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and ( excluding motor rewinding ) and maintain the motor pump set, electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
Lifting
OD64952/2022-2023:Lifting the 5HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD64953/2022-2023:Lifting the 40HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
FRANCIS PINHERO
Bidder Name
Edward P J
FRANCIS PINHERO
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_842507.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .