Loading…
Loading…
Tender Value
₹8.4 L
EMD Value
₹8,400
Closing Date
30 Jun 2026, 4:00 pm
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer, RWS & S Division,Guntur
Guntur
Repairs to OHSR in SC Colony of Thokavaripalem villge of Guntur Rural Mandal, Est. Cost Rs. 10.00 Lakhs
947651
03 MPGF 15 th Finance Tide DW 2026 27 EE RWS S Guntur
OPEN - NCB
Water Supply
GUNTUR
8 documents required · 8 mandatory
₹296
₹8,400
15 Jun 2026
15 Jun 2026
15 Jun 2026
Earth work excavation and depositing the soil on banks with an initial lead of 10m and initial lift of 2m in loamy and clay soils like BC soils, red earth and ordinary gravel SS 20B including shoring, strutting, sheeting, planking and dewatering cost of hire charges of T&P labour charges etc. complete for fineshed iem of work for foundation of building (APSS NO.308) etc.,Complete including over heads and contractors profit @ 13.615%.
Removal of peealed concreate of OHSR columns and braces including all labour charges up to 0.05m thick including scaffolding charges etc.,Complete including over heads and contractors profit @ 13.615%.
Applying Rust proof, Steel Bonding & Concrete bonding Chemicals for concrete items including cost and conveyance of materials and labour charges for applying chemicals etc.,Complete including over heads and contractors profit @ 13.615%.
VRCC (1: 1.5:3) using 20 mm HBG chips including cost and conveyance of all materials and all labour charges etc. but excluding cost of steel and its fabrication charges For Footings etc.,Complete including over heads and contractors profit @ 13.615%
VRCC (1: 1.5:3) using 20 mm HBG chips including cost and conveyance of all materials and all labour charges etc. but excluding cost of steel and its fabrication charges For Columns below G.L etc.,Complete including over heads and contractors profit @ 13.615%
VRCC (1: 1.5:3) using 20 mm HBG chips including cost and conveyance of all materials and all labour charges etc. but excluding cost of steel and its fabrication charges For Columns below GL (1st brace) etc.,Complete including over heads and contractors profit @ 13.615%
VRCC (1: 1.5:3) using 20 mm HBG chips including cost and conveyance of all materials and all labour charges etc. but excluding cost of steel and its fabrication charges For Columns GL brace to 1st brace etc., Complete including over heads and contractors profit @ 13.615%
VRCC (1: 1.5:3) using 20 mm HBG chips including cost and conveyance of all materials and all labour charges etc. but excluding cost of steel and its fabrication charges For 1st brace etc., Complete including over heads and contractors profit @ 13.615%
VRCC (1: 1.5:3) using 20 mm HBG chips including cost and conveyance of all materials and all labour charges etc. but excluding cost of steel and its fabrication charges For Columns GL brace to II nd brace etc., Complete including over heads and contractors profit @ 13.615%
VRCC (1: 1.5:3) using 20 mm HBG chips including cost and conveyance of all materials and all labour charges etc. but excluding cost of steel and its fabrication charges For II nd brace etc., Complete including over heads and contractors profit @ 13.615%
VRCC (1: 1.5:3) using 20 mm HBG chips including cost and conveyance of all materials and all labour charges etc. but excluding cost of steel and its fabrication charges For Columns II nd brace to Ring beam etc., Complete including over heads and contractors profit @ 13.615%
VRCC (1: 1.5:3) using 20 mm HBG chips including cost and conveyance of all materials and all labour charges etc. but excluding cost of steel and its fabrication charges For Ring beam etc., Complete including over heads and contractors profit @ 13.615%
VRCC (1: 1.5:3) using 20 mm HBG chips including cost and conveyance of all materials and all labour charges etc. but excluding cost of steel and its fabrication charges For Top Slab etc., Complete including over heads and contractors profit @ 13.615%
Plastering with C.M(1:3) 12mm thick including cost and conveyance of all materials and labour charges etc.,Complete including over heads and contractors profit @ 13.615%.
Providing High Yield Deformed (HYSD) /Thermo Mechanically Treated (TMT) /Mild Steel (MS) steel bars(Fe 500 grade as per ISI 1786-1979 )of difference diameters for RCC works,including labour charges for straightening, cutting, bending to required sizes and sapers, placing in position with cover bolcks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars, including cost and conveyance of binding wire, cover blocks and all incidental ,operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all mterials etc,.completd for finished item of work in all floors ( APSS No 126 ) etc complete including over heads and contractors profit @ 13.615%. FE-500
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Adm. San. -Thokavaripalem.jpeg
TENDER_DOCUMENT • 0.17 MB
Diclaration- Thokavaropalem.jpeg
TENDER_DOCUMENT • 0.13 MB
NITVol I_Thokavaripalem.doc
TENDER_DOCUMENT • 0.16 MB
NIT-Vol-II_Thokavaripalem.doc
TENDER_DOCUMENT • 0.14 MB
Thokavaripalem Schdule -10 L.xlsx
TENDER_DOCUMENT • 0.06 MB
Download all tender documents and submit your bid