Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.5 LAdmitted-Fee/PreQual/Technical/Finance | ₹14.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹14.8 L+₹27,157.09 (1.87%)Admitted-Fee/PreQual/Technical/Finance | ₹14.8 L+₹27,157.09 (1.87%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹14.9 L+₹36,283.53 (2.50%)Admitted-Fee/PreQual/Technical/Finance | ₹14.9 L+₹36,283.53 (2.50%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹15.7 L+₹1.1 L (7.89%)Admitted-Fee/PreQual/Technical/Finance | ₹15.7 L+₹1.1 L (7.89%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | SAJIT K L4 | Ajish Bhanu L2 | SUNIL M G L3 | Devadut S P L1 |
|---|---|---|---|---|---|---|---|
| 1.00Appendix A | |||||||
| 1.00 | 15.31:Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | 577.84 | sqm | 217 ₹1,25,391.28 | 180 ₹1,04,011.2 | 206 ₹1,19,035.04 | 85 ₹49,116.4 Lowest |
| 1.00 | 15.14.1:Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:Of sectional area 40 square centimetres and above | 7.96 | cum | 4,607 ₹36,657.9 | 4,607.85 ₹36,664.66 | 4,376 ₹34,819.83 | 1,500 ₹11,935.5 Lowest |
| 1.00 | OD71414/2026-2027:Supplying 1st class MP Hip and Ridge tiles of size 400 mm or nearest available size | 100 | each | 47.62 ₹4,762 | 47.62 ₹4,762 | 44.65 ₹4,465 Lowest | 47.62 ₹4,762 |
| 1.00 | OD71415/2026-2027:Supplying 1st class MP roofing tiles of size 410 x 235mm or nearest available size | 3,000 | each | 27.88 ₹83,640 | 27.88 ₹83,640 | 26.48 ₹79,440 Lowest | 28 ₹84,000 |
| 1.00 | OD71417/2026-2027: Resetting the M P (Mangalore pattern) Tiles 410 X 235 mm or nearest available. | 577.84 | sqm | 192.28 ₹1,11,107.08 | 192.28 ₹1,11,107.08 | 183.23 ₹1,05,877.62 Lowest | 192.28 ₹1,11,107.08 |
| 1.01 | OD71416/2026-2027:Resetting M P Hip and ridge tiles 400 mm nearest available size departmental first class set in CM 1:4 including finishing the edges. | 87.72 | metre | 211.97 ₹18,594.01 | 211.97 ₹18,594.01 | 201.37 ₹17,664.18 Lowest | 212 ₹18,596.64 |
| 1.01 | 10.16.1:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes | 3,843.67 | kg | 194.27 ₹7,46,710.16 | 179 ₹6,88,017.29 Lowest | 185.74 ₹7,13,923.64 | 194 ₹7,45,672.37 |
| 1.01 | OD90414/2026-2027:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 2,113.74 | kg | 182.51 ₹3,85,778.5 | 179 ₹3,78,359.28 | 170.99 ₹3,61,428.23 Lowest | 182 ₹3,84,700.5 |
| 1.01 | 12.5.1:Providing valleys of 90 cm wide overall in plain G.S. sheet fixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.I. limper and bitumen washers complete:1.60 mm thick with zinc coating not less than 350 gm/ m2 | 8 | metre | 1,718.46 ₹13,747.68 | 1,718.46 ₹13,747.68 | 1,580.56 ₹12,644.48 Lowest | 1,718 ₹13,744 |
Tender Value
Refer Docs
EMD Value
₹39,300
Closing Date
17 Sept 2026, 6:10 pmClosed
EXECUTIVE ENGINEER, TDB, MAVELIKKARA
OFFICE OF THE EXECUTIVE ENGINEER, TDB, MAVELIKKARA-690101
DBUPS Eramallikkara in Thiruvalla Group-Providing and Fixing new steel roof structure by dismantling the existing damaged timber roof structure
2026_TDB_869746_1
EEM/ET-69/2026-27
Open Tender
Repair and Maintenance Works
Item Rate
45 days
Eramallikkara
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,950
₹39,300
18 Sept 2026
14 Sept 2026
18 Sept 2026
14 Sept 2026
17 Sept 2026
14 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix A | |||||
| 1.001 | 15.31:Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | 577.84 | sqm | - | - |
| 1.002 | 15.14.1:Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:Of sectional area 40 square centimetres and above | 7.96 | cum | - | - |
| 1.003 | OD71414/2026-2027:Supplying 1st class MP Hip and Ridge tiles of size 400 mm or nearest available size | 100 | each | - | - |
| 1.004 | OD71415/2026-2027:Supplying 1st class MP roofing tiles of size 410 x 235mm or nearest available size | 3,000 | each | - | - |
| 1.005 | OD71417/2026-2027: Resetting the M P (Mangalore pattern) Tiles 410 X 235 mm or nearest available. | 577.84 | sqm | - | - |
| 1.006 | OD71416/2026-2027:Resetting M P Hip and ridge tiles 400 mm nearest available size departmental first class set in CM 1:4 including finishing the edges. | 87.72 | metre | - | - |
| 1.007 | 10.16.1:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes | 3,843.67 | kg | - | - |
| 1.008 | OD90414/2026-2027:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 2,113.74 | kg | - | - |
| 1.009 | 12.5.1:Providing valleys of 90 cm wide overall in plain G.S. sheet fixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.I. limper and bitumen washers complete:1.60 mm thick with zinc coating not less than 350 gm/ m2 | 8 | metre | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.45 MB
IntegrityPact.pdf
Tender Documents • 0.05 MB
form_of_tender.pdf
Tender Documents • 0.19 MB
preliminary_agreement_new.pdf
Tender Documents • 0.22 MB
epaymentnew.pdf
Tender Documents • 0.16 MB
Affidavit.pdf
Tender Documents • 0.06 MB
sbd69.pdf
Tender Documents • 1.53 MB
BOQ_1473713.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .