| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | LI₹4.3 LAccepted-AOC | LI | Accepted-AOC Lowest rate, hence accepted | |
| 2 | L2₹4.7 LRejected-AOC | L2 | Rejected-AOC Highest rate hence rejected |
Tender Value
₹4.5 L
EMD Value
₹11,147
Closing Date
3 May 2023, 5:00 pmClosed
Seeja KR
O/o Assistant Executive Engineer Electrical Wing (I) Sub division, Aluva
Fully Comprehensive Annual Maintenance of Avanamcode 1A,Kurumassery LI Scheme under Electrical LI section Aluva
2023_Irrig_554000_11
PWD/BLDG/TR/10885/2022
Open Tender
Electrical Works
Item Rate
365 days
Aluva
Please refer Tender documents.
11 documents required · 11 mandatory
₹985
₹11,147
16 Jun 2023
17 Apr 2023
5 May 2023
17 Apr 2023
3 May 2023
17 Apr 2023
17 Apr 2023 - 2 May 2023
Amount
Overhauling
OD68866/2022-2023:Dismantling the 100 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
OD68868/2022-2023:Dismantling the 60 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
OD246040/2022-2023:Dismantling the 5 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
Lowering / Refitting
OD68844/2022-2023: Lowering down and erecting 5 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD68889/2022-2023:Lowering down and erecting 100 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD68890/2022-2023:Lowering down and erecting 60 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
Accessories Supply and Other Items( SITC Should be completed with in 3 Months after executing the Agreement)
OD119290/2022-2023:Supply and providing 12W LED Bulb
OD261656/2022-2023:Supply and renewal of Three Phase Ammeter accuracy class 1 in panel board after dismantling the damaged one, L&T or Equivalent make.
OD261657/2022-2023:Supply and renewal of Three Phase Voltmeter accuracy class 1 in panel board after dismantling the damaged one, L&T or Equivalent make.
OD68851/2022-2023:Supply and Installing 20 W LED Tube light.
OD97587/2022-2023:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6319 2Z C3 SKF / FAG or equivalent, suitable for the existing motor / pump set as per the direction of Departmental staff at site.
OD124459/2022-2023:Supply and providing 125 A size00 Din type Fuses
90.12.5.30:Supply & laying of one number PVC insulated and PVC sheathed armoured aluminium power cable of 1.1KV grade of the following sizes in the existing RCC/ HUME / STONE WARE/ GI/ DWC pipe as required.3.5 core 70 sq mm
OD127294/2022-2023:Providing and fixing following capacity switch disconnector unit in sheet enclosure , making connections, etc. as required 125 amps 3 pole (L&T Make FN160 A TPN OR Equivalent)
OD136842/2022-2023:Supply and filling of transformer oil of good quality to the Transformer /starter/ regulator etc as required
Periodical Maintenance
OD68863/2022-2023:Fully Comprehensive Annual Maintenance of 5 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump,maintaince of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding)all time during the period of contract and the faults should be rectified with in the time allowed
OD68897/2022-2023: Fully Comprehensive Annual Maintenance of 60 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter and slip ring unit, replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and starter ( excluding motor rewinding ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD136827/2022-2023:Fully Comprehensive Annual Maintenance of 100 HP squirrel cage induction motor with split case / End suction pump set, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs,replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and ( excluding motor rewinding ) and maintain the motor pump set, electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD68898/2022-2023: Fully Comprehensive Annual Maintenance of 100 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter and slip ring unit, replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and starter ( excluding motor rewinding ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
Lifting
OD68853/2022-2023: Lifting the 5 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD68939/2022-2023:Lifting the 60HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD68941/2022-2023:Lifting the 100HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
Overhauling
OD68834/2022-2023:Dismantling the 5 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
OD68966/2022-2023:Dismantling the 120 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
Lowering / Refitting
OD69013/2022-2023:Refitting 120 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD236153/2022-2023:Refitting 5 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
Accessories Supply and Other Items( SITC Should be completed with in 3 Months after executing the Agreement)
OD68839/2022-2023:Supply and filling of transformer oil of good quality to the Transformer /starter/ regulator etc as required
OD68840/2022-2023: Supply and renewal of the LED Indication lamps in panel board after dismantling the damaged one
OD68841/2022-2023:Supply and Installing 20 W LED Tube light.
OD68842/2022-2023:Supply and renewal of Three Phase digital Ammeter accuracy class 1 in panel board after dismantling the damaged one, L&T or equivalent make.
OD68843/2022-2023:Supply and renewal of Three Phase Digital Voltmeter accuracy class 1 in panel board after dismantling the damaged one, L&T or Equivalent make.
OD97586/2022-2023:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6319 2Z C3, SKF / FAG or equivalent, suitable for the existing motor / pump set as per the direction of Departmental staff at site.
Periodical Maintenance
OD68832/2022-2023:Fully Comprehensive Annual Maintenance of 5 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump,maintaince of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding)all time during the period of contract and the faults should be rectified with in the time allowed
OD69023/2022-2023: Fully Comprehensive Annual Maintenance of 120 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter and slip ring unit, replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and starter ( excluding motor rewinding ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
SHIJU M.T
Bidder Name
SHIJU M.T
GK INDUSTRIES
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_844183.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .