Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 LAccepted-AOC MUKALEL AMARAVATHY P O KUMILY | KUMILY | IDUKKI | KERALA | ₹6.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹7.2 L+₹27,908.65 (4.04%)Rejected-Finance NADUPILAKAL VADIKKETH CHOTHAYIL ROAD THODIYOOR | KANNUR | KERALA | 670511 | ₹7.2 L+₹27,908.65 (4.04%) | L2 | Rejected-Finance L2 |
| 3 | L3₹7.6 L+₹71,215.16 (10.3%)Rejected-Finance | ₹7.6 L+₹71,215.16 (10.3%) | L3 | Rejected-Finance L3 |
Tender Value
₹9.5 L
EMD Value
₹23,700
Closing Date
16 Jul 2026, 5:00 pmClosed
Deputy Director
Deputy Director, Periyar East Division, Thekkady
Construction of culvert at Thadippalam in Vallakkadavu Range during 2026-27
2026_FD_859761_1
M-40443/2026/S
Open Tender
Civil Works - Others
Percentage
90 days
Vallakkadavu Range
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,250
Yes
₹23,700
Yes
19 Aug 2026
9 Jul 2026
18 Jul 2026
9 Jul 2026
16 Jul 2026
9 Jul 2026
9 Jul 2026 - 16 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engaging Coolie | 10 | Day | 1,082.18 | ₹10,821.8 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides, ramming of bottoms, lift up to 1.5 m, getting out and disposal of surplus soil within a lead of 50 m. All kinds of soil. | 19.5 | cum | 359.72 | ₹7,014.54 |
| 3 | Providing and laying in position cement concrete of specified grade excluding centering/shuttering up to plinth level: 1:4:8 mix (1 Cement : 4 coarse sand derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). | 2.25 | cum | 7,932.89 | ₹17,849 |
| 4 | Centering and shuttering including strutting, etc. and removal of form for: Columns, Pillars, Piers, Abutments, Posts and Struts. | 82.5 | sqm | 1,008.55 | ₹83,205.38 |
| 5 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete up to plinth level—Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1,990 | kilo | 112.43 | ₹2,23,735.7 |
| 6 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level excluding cost of centering, shuttering, finishing and reinforcement: 1:1.5:3 mix (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 18.18 | cum | 12,772.18 | ₹2,32,134.37 |
| 7 | DRY RUBBLE MASONRY—Dry rubble without concrete leveling course masonry with good quality blasted rubble including packing to compactness to lines and levels, cost and conveyance of all materials, labour charges etc. complete | 30.6 | cum | 3,993.46 | ₹1,22,199.88 |
| 8 | DR with Departmental Stone—DRY RUBBLE MASONRY Dry rubble without concrete leveling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete. | 61.2 | cum | 1,715.88 | ₹1,05,011.86 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.04 MB
Tendernotice_2.pdf
PDF • 0.21 MB
Tendernotice_3.pdf
PDF • 0.07 MB
Tendernotice_4.pdf
PDF • 2.08 MB
BOQ_1453916.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .