| 1 | L1₹15.5 LAccepted-AOC SANTIPARA JALPAIGURI | JALPAIGURI | ALIPURDUAR | WEST BENGAL | L1 | Accepted-AOC L1 Bidder. | |
| 2 | L2₹16.4 L+₹88,872 (5.74%)Rejected-Finance COOCH BEHAR | JALPAIGURI | WEST BENGAL | 735122 | L2 | Rejected-Finance HIGHER BID VALUE. | |
| 3 | L3₹16.6 L+₹1.1 L (7.05%)Rejected-Finance JALPAIGURI | JALPAIGURI | JALPAIGURI | WEST BENGAL | L3 | Rejected-Finance HIGHER BID VALUE. | |
| 4 | L4₹16.9 L+₹1.5 L (9.46%)Rejected-Finance | L4 | Rejected-Finance HIGHER BID VALUE. |
| Sl No | Description | Qty | Unit | SANKAR GHOSH L4 | MESSRS BHOWMIK AND CO L1 | ELECTROCRAFT L2 | SHYAM ENTERPRISE L3 |
|---|---|---|---|---|---|---|---|
| 1.00Annual Maintenance Contract of entire Electrical Installation work (internal and external both) incl. Substation and operation of Silent D.G. set (round the clock) at Mal Sub-Divisional Hospital, Malbazar, Jalpaiguri, including residential quarters and different Government buildings as directed by the EIC as per attached terms and conditions. NOTE: 1. Licensed Electrical Supervisor should inspect all sites twice in a month and as and when required and directed by EIC. Multiple Logbook for multiple parameters should be recorded daily. All faults should be attended and rectified immediately. Failure of compliance of any condition or irregular supervisor presence will results penal action. 2. Different Electrical Maintenance Equipment such as – PVC tape, tools and tackles, wooden Gutkha, Fust nut, different type and size screw / nut/ bolts, fuse wire, greese, connector etc., different types of measuring instrument like Tong Tester, Multimeter, 1000v Megger, Infrared Thermometer etc. and different types of Register, Log Book and Dress for Workman as per requirement must be supply by the Agency itself as per direction of EIC. by deputing following number of manpower as mentioned below. Terms and Conditons must be followed: | |||||||
| 1.01 | Skilled Electricain: 01 (One) man for 12 (Twelve) months (One man per shift) [01 no. shift/day]
General Shift: 10:00 AM to 06:00 PM | 12 | Head / Month | 26,900 ₹3,22,800 | 25,000 ₹3,00,000 Lowest | 26,026 ₹3,12,312 | 26,500 ₹3,18,000 |
| 1.02 | Semi-Skilled Electricain: 02 (Two) man for 12 (Twelve) months (One man per shift) [02 nos. shift/day]
(a) Shift- 01 : from 06 a.m. to 02 p.m.,
(b) Shift- 02 : from 02 p.m. to 10 p.m. | 24 | Head / Month | 24,150 ₹5,79,600 | 22,000 ₹5,28,000 Lowest | 23,537 ₹5,64,888 | 23,700 ₹5,68,800 |
| 10.30 | Un-Skilled Workman: 03 (Three) Man for 12 (Twelve) months
(One man per shift) [03 nos. shift/day] :
(a) Shift- 01 : from 06 a.m. to 02 p.m.,
(b) Shift- 02 : from 02 p.m. to 10 p.m.
(c) Shift- 03 : from 10 p.m. to 06 a.m. next day. | 36 | Head / Month | 22,000 ₹7,92,000 | 20,000 ₹7,20,000 Lowest | 21,102 ₹7,59,672 | 21,400 ₹7,70,400 |
Tender Value
Refer Docs
EMD Value
₹33,459
Closing Date
25 Aug 2026, 12:00 pmClosed
Executive Engineer, PWD, Jal Electrical Division.
Office of the Executive Engineer, PWD, Jalpaiguri Electrical Division, Purta Bhavan, Hakimpara, Post and Dist. - Jalpaiguri, Pin - 735101.
AMC of EI works incl. Substation and operation of Silent D.G. set at Mal SDH, Malbazar, Jalpaiguri.
2026_WBPWD_5017993_1
WBPWD/EE/JED/NIQ 17e/Q of 2026-27.
Open Tender
ELECTRICAL WORKS M/R
Item Rate
365 days
Mal SDH, Malbazar
Please refer Tender documents.
3 documents required · 3 mandatory
₹33,459
28 Sept 2026
10 Aug 2026
27 Aug 2026
10 Aug 2026
25 Aug 2026
10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Annual Maintenance Contract of entire Electrical Installation work (internal and external both) incl. Substation and operation of Silent D.G. set (round the clock) at Mal Sub-Divisional Hospital, Malbazar, Jalpaiguri, including residential quarters and different Government buildings as directed by the EIC as per attached terms and conditions. NOTE: 1. Licensed Electrical Supervisor should inspect all sites twice in a month and as and when required and directed by EIC. Multiple Logbook for multiple parameters should be recorded daily. All faults should be attended and rectified immediately. Failure of compliance of any condition or irregular supervisor presence will results penal action. 2. Different Electrical Maintenance Equipment such as – PVC tape, tools and tackles, wooden Gutkha, Fust nut, different type and size screw / nut/ bolts, fuse wire, greese, connector etc., different types of measuring instrument like Tong Tester, Multimeter, 1000v Megger, Infrared Thermometer etc. and different types of Register, Log Book and Dress for Workman as per requirement must be supply by the Agency itself as per direction of EIC. by deputing following number of manpower as mentioned below. Terms and Conditons must be followed: | |||||
| 1.01 | Skilled Electricain: 01 (One) man for 12 (Twelve) months (One man per shift) [01 no. shift/day]
General Shift: 10:00 AM to 06:00 PM | - | Head / Month | - | - |
| 1.02 | Semi-Skilled Electricain: 02 (Two) man for 12 (Twelve) months (One man per shift) [02 nos. shift/day]
(a) Shift- 01 : from 06 a.m. to 02 p.m.,
(b) Shift- 02 : from 02 p.m. to 10 p.m. | - | Head / Month | - | - |
| 10.3 | Un-Skilled Workman: 03 (Three) Man for 12 (Twelve) months
(One man per shift) [03 nos. shift/day] :
(a) Shift- 01 : from 06 a.m. to 02 p.m.,
(b) Shift- 02 : from 02 p.m. to 10 p.m.
(c) Shift- 03 : from 10 p.m. to 06 a.m. next day. | - | Head / Month | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.58 MB
Tendernotice_2.pdf
PDF • 0.98 MB
BOQ_5088595.xls
BOQ • 0.34 MB
TC.pdf
Other Document • 0.89 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .