Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹34.9 LAdmitted-Finance | +6.28% | ₹34.9 L | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | - | Rejected-Technical Technically not Qualified |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical Technically not Qualified |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Technically not Qualified |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical Technically not Qualified |
Tender Value
₹32.8 L
EMD Value
₹77,500
Closing Date
6 Feb 2026, 3:00 pmClosed
Executive Engineer Mtc-II
Office of the Executive Engineer Mtc-II ,NMPA, Panambur
Hiring of wheel Tyre mounted, chain mounted excavator and Tipper for removing unwanted materials and other allied works in and around wharf area for the year 2026-27 and 2027-28
2026_NMPT_894218_1
CIVIL/CE(C)/EE(C)/92/2025-26
Open Tender
Civil Works - Others
720 days
NMPA, Panambur
As per tender document
7 documents required · 7 mandatory
₹560
Yes
As per Tender Document
₹77,500
Yes
20 Mar 2026
16 Jan 2026
9 Feb 2026
16 Jan 2026
6 Feb 2026
30 Jan 2026
Hire charge of wheel (tyre) mounted excavator for removing the unwanted waste in and around wharf area and loading to tipper including cost of fuel, hire charges of the vehicle, etc. complete as directed by the engineer incharge. Note: The machinary will be utilized by the department to all the areas of conservancy Part A, B, C, D and Part E
Hire charge of small chain mounted Ex - 20 for removing the unwanted waste in small drains and around wharf area including cost of fuel, hire charges of the vehicle, etc. complete as directed by the engineer incharge. Note: The machine will be utilized by the department to all the areas of conservancy Part A, B, C, D and Part E
Hire charge of chain mounted Hydraulic Excavator of 1.1 m3 bucket to remove the unwanted waste in and around wharf area including cost of fuel, hire charges of the vehicle, etc. complete as directed by the engineer incharge. Note: The machine will be utilized by the department to all the areas wherever required
Hire charge of Tipper for removing the unwanted waste in and around wharf area including cost of fuel, hire charges of the vehicle, etc. complete as directed by the engineer incharge. Note:- The Tipper will be utilized by the department to all the areas of conservancy Part A, B, C, D and Part E
Removal of carcase of animals in and arround wharf area such as cow, bull, buffallo, etc., conveying and burrying the dead animal at nearby vacant area after excavating suitable pit including cost and conveyance of all material, hire charge of equipment, T&P and all other incidental charges etc. complete as directed by the department.
Providing and laying 900mm reinforced cement concrete pipe NP2 for dust bins in wharf area including cost of materials, labour, HOM complete as per specifications, curing complete as per specifications and as per directions of Engineer-in-charge.
Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.
Printing new letter and figures of any shade with synthetic enamel paint (15 cms high and 10 cms width) with synthetic enamel paint black or any other approved colour to give an even shade complete as per specifications
KSRRB 200-1. Cutting of trees girth from 300mm to 600mm including cutting of trunks, branches and removal of stumps roots stacking of serviceable materials earth filling in the depressions / pit, labour charges complete as per specifications. MORTH specification clause 201/ Chapter 2
KSRRB 200-2. Cutting of trees girth from 600mm to 900mm including cutting of trunks, branches and removal of stumps roots stacking of serviceable materials earth filling in the depressions / pit, labour charges complete as per specifications. MORTH specification clause 201/ Chapter 2
KSRRB 200-3. Cutting of trees girth from 900mm to 1800mm including cutting of trunks, branches and removal of stumps roots stacking of serviceable materials earth filling in the depressions / pit, labour charges complete as per specifications. MORTH specification clause 201/ Chapter 2
cutting of tree branches of size upto 300mm girth without damaging the building, structures, compound wall, fencing, electrical line, water supply etc.. all the branches should be cut into small pieces on the tree itself and descend the same mannualy by deploying sufficient number of labours, including cost of cutting of trunks, branches and stacking of serviceable materials, labour charges cutting machine charge, transportation charges, tools and plant and all other incidental charges etc. complete as per specifications and as per directions of Engineer-in-charge.
cutting of tree branches of size upto 300mm to 600mm girth without damaging the building, structures, compound wall, fencing, electrical line, water supply etc.. all the branches should be cut into small pieces on the tree itself and descend the same mannualy by deploying sufficient number of labours, including cost of cutting of trunks, branches and stacking of serviceable materials, labour charges cutting machine charge, transportation charges, tools and plant and all other incidental charges etc. complete as per specifications and as per directions of Engineer-in-charge.
cutting of tree branches of size upto 600mm to 900mm girth without damaging the building, structures, compound wall, fencing, electrical line, water supply etc.. all the branches should be cut into small pieces on the tree itself and descend the same mannualy by deploying sufficient number of labours, including cost of cutting of trunks, branches and stacking of serviceable materials, labour charges cutting machine charge, transportation charges, tools and plant and all other incidental charges etc. complete as per specifications and as per directions of Engineer-in-charge.
cutting of tree branches of size above 900mm girth without damaging the building, structures, compound wall, fencing, electrical line, water supply etc.. all the branches should be cut into small pieces on the tree itself and descend the same mannualy by deploying sufficient number of labours, including cost of cutting of trunks, branches and stacking of serviceable materials, labour charges cutting machine charge, transportation charges, tools and plant and all other incidental charges etc. complete as per specifications and as per directions of Engineer-in-charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
TD.pdf
Tender Documents • 3.25 MB
BOQ_939932.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid